ALT Linux Bugzilla
– Attachment 2658 Details for
Bug 15853
K3b не проверяет диски
New bug
|
Search
|
[?]
|
Help
Register
|
Log In
[x]
|
Forgot Password
Login:
[x]
|
EN
|
RU
Лог записи диска
k3b.err.1 (text/plain), 268.96 KB, created by
Denis Yagofarov
on 2008-05-31 02:22:59 MSD
(
hide
)
Description:
Лог записи диска
Filename:
MIME Type:
Creator:
Denis Yagofarov
Created:
2008-05-31 02:22:59 MSD
Size:
268.96 KB
patch
obsolete
>System >----------------------- >K3b Version: 1.0.4 > >KDE Version: 3.5.9 >QT Version: 3.3.8b >Kernel: 2.6.24-std-def-alt9 >Devices >----------------------- >HL-DT-ST DVDRAM GSA-T20N WA03 (/dev/hda, ) [CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL] [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, ÐгÑаниÑÐµÐ½Ð½Ð°Ñ Ð¿ÐµÑезапиÑÑ, Layer Jump] > >Burned media >----------------------- >DVD+R > >K3bIsoImager >----------------------- >mkisofs print size result: 2200805 (4507248640 bytes) >Pipe throughput: 4507248640 bytes read, 4507248640 bytes written. > >Used versions >----------------------- >mkisofs: 2.1.1a03 >growisofs: 7.0 > >growisofs >----------------------- >Executing 'builtin_dd if=/dev/fd/0 of=/dev/hda obs=32k seek=0' >/dev/hda: "Current Write Speed" is 4.1x1352KBps. > 1114112/4507248640 ( 0.0%) @0.0x, remaining 404:27 RBU 100.0% UBU 2.9% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 606:41 RBU 100.0% UBU 100.0% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 876:19 RBU 100.0% UBU 100.0% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 1078:33 RBU 100.0% UBU 100.0% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 1280:47 RBU 100.0% UBU 100.0% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 1550:25 RBU 100.0% UBU 100.0% > 1114112/4507248640 ( 0.0%) @0.0x, remaining 1752:39 RBU 100.0% UBU 100.0% > 1376256/4507248640 ( 0.0%) @0.1x, remaining 1582:26 RBU 100.0% UBU 100.0% > 16809984/4507248640 ( 0.4%) @3.3x, remaining 146:55 RBU 100.0% UBU 100.0% > 32669696/4507248640 ( 0.7%) @3.4x, remaining 82:10 RBU 100.0% UBU 100.0% > 48693248/4507248640 ( 1.1%) @3.5x, remaining 59:31 RBU 100.0% UBU 100.0% > 64815104/4507248640 ( 1.4%) @3.5x, remaining 49:07 RBU 100.0% UBU 100.0% > 81035264/4507248640 ( 1.8%) @3.5x, remaining 41:52 RBU 100.0% UBU 100.0% > 97419264/4507248640 ( 2.2%) @3.5x, remaining 36:58 RBU 100.0% UBU 100.0% > 113934336/4507248640 ( 2.5%) @3.6x, remaining 34:03 RBU 100.0% UBU 100.0% > 130547712/4507248640 ( 2.9%) @3.6x, remaining 31:17 RBU 100.0% UBU 100.0% > 147324928/4507248640 ( 3.3%) @3.6x, remaining 29:06 RBU 100.0% UBU 100.0% > 164200448/4507248640 ( 3.6%) @3.7x, remaining 27:46 RBU 100.0% UBU 100.0% > 181207040/4507248640 ( 4.0%) @3.7x, remaining 26:15 RBU 100.0% UBU 100.0% > 198344704/4507248640 ( 4.4%) @3.7x, remaining 24:58 RBU 100.0% UBU 100.0% > 215613440/4507248640 ( 4.8%) @3.7x, remaining 24:13 RBU 100.0% UBU 100.0% > 233013248/4507248640 ( 5.2%) @3.8x, remaining 23:14 RBU 100.0% UBU 100.0% > 250544128/4507248640 ( 5.6%) @3.8x, remaining 22:22 RBU 100.0% UBU 97.1% > 268173312/4507248640 ( 5.9%) @3.8x, remaining 21:51 RBU 100.0% UBU 100.0% > 285966336/4507248640 ( 6.3%) @3.9x, remaining 21:09 RBU 100.0% UBU 100.0% > 303857664/4507248640 ( 6.7%) @3.9x, remaining 20:31 RBU 100.0% UBU 100.0% > 321880064/4507248640 ( 7.1%) @3.9x, remaining 20:09 RBU 100.0% UBU 100.0% > 340033536/4507248640 ( 7.5%) @3.9x, remaining 19:36 RBU 100.0% UBU 100.0% > 358318080/4507248640 ( 7.9%) @4.0x, remaining 19:06 RBU 100.0% UBU 100.0% > 370540544/4507248640 ( 8.2%) @2.6x, remaining 19:09 RBU 100.0% UBU 100.0% > 373948416/4507248640 ( 8.3%) @0.7x, remaining 19:31 RBU 100.0% UBU 100.0% > 392495104/4507248640 ( 8.7%) @4.0x, remaining 19:02 RBU 100.0% UBU 100.0% > 411140096/4507248640 ( 9.1%) @4.0x, remaining 18:45 RBU 100.0% UBU 91.2% > 429752320/4507248640 ( 9.5%) @4.0x, remaining 18:20 RBU 100.0% UBU 100.0% > 448364544/4507248640 ( 9.9%) @4.0x, remaining 17:57 RBU 100.0% UBU 100.0% > 466976768/4507248640 (10.4%) @4.0x, remaining 17:44 RBU 100.0% UBU 100.0% > 485588992/4507248640 (10.8%) @4.0x, remaining 17:23 RBU 100.0% UBU 100.0% > 504201216/4507248640 (11.2%) @4.0x, remaining 17:04 RBU 100.0% UBU 100.0% > 522813440/4507248640 (11.6%) @4.0x, remaining 16:53 RBU 100.0% UBU 100.0% > 541425664/4507248640 (12.0%) @4.0x, remaining 16:36 RBU 99.2% UBU 100.0% > 560037888/4507248640 (12.4%) @4.0x, remaining 16:19 RBU 100.0% UBU 100.0% > 578650112/4507248640 (12.8%) @4.0x, remaining 16:10 RBU 100.0% UBU 100.0% > 597295104/4507248640 (13.3%) @4.0x, remaining 15:55 RBU 100.0% UBU 100.0% > 615972864/4507248640 (13.7%) @4.0x, remaining 15:41 RBU 100.0% UBU 100.0% > 634585088/4507248640 (14.1%) @4.0x, remaining 15:33 RBU 100.0% UBU 100.0% > 653197312/4507248640 (14.5%) @4.0x, remaining 15:20 RBU 100.0% UBU 94.1% > 671842304/4507248640 (14.9%) @4.0x, remaining 15:07 RBU 100.0% UBU 100.0% > 685211648/4507248640 (15.2%) @2.9x, remaining 15:09 RBU 100.0% UBU 100.0% > 703823872/4507248640 (15.6%) @4.0x, remaining 14:57 RBU 100.0% UBU 100.0% > 722436096/4507248640 (16.0%) @4.0x, remaining 14:45 RBU 100.0% UBU 100.0% > 741048320/4507248640 (16.4%) @4.0x, remaining 14:39 RBU 100.0% UBU 100.0% > 759693312/4507248640 (16.9%) @4.0x, remaining 14:28 RBU 100.0% UBU 100.0% > 778305536/4507248640 (17.3%) @4.0x, remaining 14:17 RBU 100.0% UBU 100.0% > 796917760/4507248640 (17.7%) @4.0x, remaining 14:12 RBU 100.8% UBU 100.0% > 815562752/4507248640 (18.1%) @4.0x, remaining 14:01 RBU 100.0% UBU 100.0% > 834207744/4507248640 (18.5%) @4.0x, remaining 13:52 RBU 100.0% UBU 100.0% > 852852736/4507248640 (18.9%) @4.0x, remaining 13:46 RBU 100.0% UBU 97.1% > 871464960/4507248640 (19.3%) @4.0x, remaining 13:37 RBU 100.0% UBU 100.0% > 890109952/4507248640 (19.7%) @4.0x, remaining 13:28 RBU 100.0% UBU 94.1% > 908754944/4507248640 (20.2%) @4.0x, remaining 13:23 RBU 100.0% UBU 100.0% > 927399936/4507248640 (20.6%) @4.0x, remaining 13:15 RBU 100.0% UBU 100.0% > 946044928/4507248640 (21.0%) @4.0x, remaining 13:10 RBU 100.0% UBU 94.1% > 964689920/4507248640 (21.4%) @4.0x, remaining 13:02 RBU 100.0% UBU 100.0% > 983334912/4507248640 (21.8%) @4.0x, remaining 12:54 RBU 100.0% UBU 100.0% > 996769792/4507248640 (22.1%) @2.9x, remaining 12:54 RBU 100.0% UBU 100.0% > 1015414784/4507248640 (22.5%) @4.0x, remaining 12:46 RBU 100.0% UBU 100.0% > 1034027008/4507248640 (22.9%) @4.0x, remaining 12:39 RBU 100.0% UBU 100.0% > 1052639232/4507248640 (23.4%) @4.0x, remaining 12:34 RBU 100.0% UBU 100.0% > 1071251456/4507248640 (23.8%) @4.0x, remaining 12:27 RBU 100.0% UBU 100.0% > 1089863680/4507248640 (24.2%) @4.0x, remaining 12:20 RBU 100.0% UBU 97.1% > 1108508672/4507248640 (24.6%) @4.0x, remaining 12:15 RBU 100.0% UBU 97.1% > 1127153664/4507248640 (25.0%) @4.0x, remaining 12:08 RBU 100.0% UBU 100.0% > 1145765888/4507248640 (25.4%) @4.0x, remaining 12:01 RBU 100.0% UBU 100.0% > 1164410880/4507248640 (25.8%) @4.0x, remaining 11:57 RBU 100.0% UBU 100.0% > 1183055872/4507248640 (26.2%) @4.0x, remaining 11:50 RBU 100.0% UBU 100.0% > 1201668096/4507248640 (26.7%) @4.0x, remaining 11:44 RBU 100.0% UBU 97.1% > 1220280320/4507248640 (27.1%) @4.0x, remaining 11:40 RBU 100.0% UBU 100.0% > 1238925312/4507248640 (27.5%) @4.0x, remaining 11:33 RBU 100.0% UBU 100.0% > 1257537536/4507248640 (27.9%) @4.0x, remaining 11:27 RBU 100.0% UBU 100.0% > 1276182528/4507248640 (28.3%) @4.0x, remaining 11:23 RBU 100.0% UBU 100.0% > 1294827520/4507248640 (28.7%) @4.0x, remaining 11:17 RBU 90.6% UBU 100.0% > 1308327936/4507248640 (29.0%) @2.9x, remaining 11:14 RBU 100.0% UBU 100.0% > 1326940160/4507248640 (29.4%) @4.0x, remaining 11:11 RBU 100.0% UBU 100.0% > 1345552384/4507248640 (29.9%) @4.0x, remaining 11:04 RBU 100.0% UBU 100.0% > 1364197376/4507248640 (30.3%) @4.0x, remaining 10:58 RBU 100.0% UBU 100.0% > 1382809600/4507248640 (30.7%) @4.0x, remaining 10:55 RBU 100.0% UBU 100.0% > 1401421824/4507248640 (31.1%) @4.0x, remaining 10:49 RBU 100.0% UBU 100.0% > 1420034048/4507248640 (31.5%) @4.0x, remaining 10:43 RBU 100.0% UBU 100.0% > 1438646272/4507248640 (31.9%) @4.0x, remaining 10:39 RBU 100.0% UBU 100.0% > 1457291264/4507248640 (32.3%) @4.0x, remaining 10:34 RBU 100.0% UBU 100.0% > 1475903488/4507248640 (32.7%) @4.0x, remaining 10:28 RBU 100.0% UBU 100.0% > 1494515712/4507248640 (33.2%) @4.0x, remaining 10:24 RBU 100.0% UBU 100.0% > 1513127936/4507248640 (33.6%) @4.0x, remaining 10:19 RBU 100.0% UBU 100.0% > 1531772928/4507248640 (34.0%) @4.0x, remaining 10:13 RBU 100.0% UBU 100.0% > 1550385152/4507248640 (34.4%) @4.0x, remaining 10:10 RBU 100.0% UBU 100.0% > 1569030144/4507248640 (34.8%) @4.0x, remaining 10:04 RBU 99.2% UBU 100.0% > 1587642368/4507248640 (35.2%) @4.0x, remaining 9:59 RBU 100.0% UBU 100.0% > 1606254592/4507248640 (35.6%) @4.0x, remaining 9:56 RBU 100.0% UBU 100.0% > 1619722240/4507248640 (35.9%) @2.9x, remaining 9:53 RBU 100.0% UBU 100.0% > 1638367232/4507248640 (36.3%) @4.0x, remaining 9:48 RBU 100.0% UBU 100.0% > 1656979456/4507248640 (36.8%) @4.0x, remaining 9:44 RBU 100.0% UBU 100.0% > 1675591680/4507248640 (37.2%) @4.0x, remaining 9:39 RBU 100.0% UBU 100.0% > 1694203904/4507248640 (37.6%) @4.0x, remaining 9:34 RBU 99.2% UBU 100.0% > 1712816128/4507248640 (38.0%) @4.0x, remaining 9:31 RBU 100.0% UBU 100.0% > 1731461120/4507248640 (38.4%) @4.0x, remaining 9:25 RBU 100.0% UBU 100.0% > 1750073344/4507248640 (38.8%) @4.0x, remaining 9:20 RBU 100.0% UBU 100.0% > 1768685568/4507248640 (39.2%) @4.0x, remaining 9:17 RBU 100.0% UBU 100.0% > 1787297792/4507248640 (39.7%) @4.0x, remaining 9:12 RBU 100.0% UBU 100.0% > 1805942784/4507248640 (40.1%) @4.0x, remaining 9:07 RBU 99.2% UBU 100.0% > 1824587776/4507248640 (40.5%) @4.0x, remaining 9:04 RBU 99.2% UBU 100.0% > 1843200000/4507248640 (40.9%) @4.0x, remaining 8:59 RBU 100.0% UBU 100.0% > 1861844992/4507248640 (41.3%) @4.0x, remaining 8:54 RBU 100.0% UBU 100.0% > 1880489984/4507248640 (41.7%) @4.0x, remaining 8:50 RBU 100.0% UBU 100.0% > 1899102208/4507248640 (42.1%) @4.0x, remaining 8:45 RBU 100.0% UBU 100.0% > 1917714432/4507248640 (42.5%) @4.0x, remaining 8:41 RBU 100.0% UBU 100.0% > 1930985472/4507248640 (42.8%) @2.9x, remaining 8:40 RBU 100.0% UBU 100.0% > 1949597696/4507248640 (43.3%) @4.0x, remaining 8:35 RBU 100.0% UBU 100.0% > 1968209920/4507248640 (43.7%) @4.0x, remaining 8:30 RBU 100.0% UBU 100.0% > 1986822144/4507248640 (44.1%) @4.0x, remaining 8:27 RBU 98.4% UBU 97.1% > 2005434368/4507248640 (44.5%) @4.0x, remaining 8:22 RBU 100.0% UBU 100.0% > 2024079360/4507248640 (44.9%) @4.0x, remaining 8:18 RBU 100.0% UBU 100.0% > 2042724352/4507248640 (45.3%) @4.0x, remaining 8:14 RBU 99.2% UBU 100.0% > 2061336576/4507248640 (45.7%) @4.0x, remaining 8:10 RBU 100.0% UBU 100.0% > 2079948800/4507248640 (46.1%) @4.0x, remaining 8:05 RBU 100.0% UBU 100.0% > 2098593792/4507248640 (46.6%) @4.0x, remaining 8:02 RBU 99.2% UBU 100.0% > 2117206016/4507248640 (47.0%) @4.0x, remaining 7:57 RBU 100.0% UBU 100.0% > 2135851008/4507248640 (47.4%) @4.0x, remaining 7:52 RBU 100.0% UBU 100.0% > 2154463232/4507248640 (47.8%) @4.0x, remaining 7:49 RBU 100.0% UBU 100.0% > 2173108224/4507248640 (48.2%) @4.0x, remaining 7:45 RBU 100.0% UBU 94.1% > 2191720448/4507248640 (48.6%) @4.0x, remaining 7:40 RBU 100.0% UBU 100.0% > 2210332672/4507248640 (49.0%) @4.0x, remaining 7:37 RBU 100.0% UBU 100.0% > 2228944896/4507248640 (49.5%) @4.0x, remaining 7:32 RBU 100.0% UBU 100.0% > 2242248704/4507248640 (49.7%) @2.9x, remaining 7:31 RBU 100.0% UBU 100.0% > 2260860928/4507248640 (50.2%) @4.0x, remaining 7:27 RBU 100.0% UBU 100.0% > 2279473152/4507248640 (50.6%) @4.0x, remaining 7:22 RBU 100.0% UBU 100.0% > 2298118144/4507248640 (51.0%) @4.0x, remaining 7:19 RBU 100.0% UBU 100.0% > 2316730368/4507248640 (51.4%) @4.0x, remaining 7:14 RBU 100.0% UBU 100.0% > 2335342592/4507248640 (51.8%) @4.0x, remaining 7:10 RBU 100.0% UBU 100.0% > 2353954816/4507248640 (52.2%) @4.0x, remaining 7:07 RBU 100.0% UBU 100.0% > 2372567040/4507248640 (52.6%) @4.0x, remaining 7:02 RBU 100.0% UBU 100.0% > 2391212032/4507248640 (53.1%) @4.0x, remaining 6:58 RBU 100.0% UBU 100.0% > 2409824256/4507248640 (53.5%) @4.0x, remaining 6:55 RBU 100.0% UBU 100.0% > 2428469248/4507248640 (53.9%) @4.0x, remaining 6:50 RBU 100.0% UBU 100.0% > 2447081472/4507248640 (54.3%) @4.0x, remaining 6:46 RBU 100.0% UBU 100.0% > 2465693696/4507248640 (54.7%) @4.0x, remaining 6:43 RBU 100.0% UBU 100.0% > 2484305920/4507248640 (55.1%) @4.0x, remaining 6:39 RBU 100.0% UBU 100.0% > 2502918144/4507248640 (55.5%) @4.0x, remaining 6:34 RBU 100.0% UBU 100.0% > 2521563136/4507248640 (55.9%) @4.0x, remaining 6:31 RBU 100.0% UBU 100.0% > 2540175360/4507248640 (56.4%) @4.0x, remaining 6:27 RBU 100.0% UBU 100.0% > 2553446400/4507248640 (56.7%) @2.9x, remaining 6:24 RBU 100.0% UBU 100.0% > 2572091392/4507248640 (57.1%) @4.0x, remaining 6:21 RBU 99.2% UBU 100.0% > 2590703616/4507248640 (57.5%) @4.0x, remaining 6:17 RBU 100.0% UBU 100.0% > 2609315840/4507248640 (57.9%) @4.0x, remaining 6:13 RBU 100.0% UBU 100.0% > 2627960832/4507248640 (58.3%) @4.0x, remaining 6:09 RBU 100.0% UBU 100.0% > 2646573056/4507248640 (58.7%) @4.0x, remaining 6:05 RBU 100.0% UBU 100.0% > 2665218048/4507248640 (59.1%) @4.0x, remaining 6:01 RBU 100.0% UBU 100.0% > 2683830272/4507248640 (59.5%) @4.0x, remaining 5:58 RBU 100.0% UBU 100.0% > 2702442496/4507248640 (60.0%) @4.0x, remaining 5:53 RBU 99.2% UBU 100.0% > 2721054720/4507248640 (60.4%) @4.0x, remaining 5:49 RBU 100.0% UBU 100.0% > 2739699712/4507248640 (60.8%) @4.0x, remaining 5:46 RBU 100.0% UBU 100.0% > 2758311936/4507248640 (61.2%) @4.0x, remaining 5:42 RBU 100.0% UBU 100.0% > 2776924160/4507248640 (61.6%) @4.0x, remaining 5:38 RBU 100.0% UBU 100.0% > 2795503616/4507248640 (62.0%) @4.0x, remaining 5:34 RBU 100.8% UBU 100.0% > 2814181376/4507248640 (62.4%) @4.0x, remaining 5:30 RBU 100.0% UBU 100.0% > 2832793600/4507248640 (62.8%) @4.0x, remaining 5:26 RBU 100.0% UBU 100.0% > 2851438592/4507248640 (63.3%) @4.0x, remaining 5:23 RBU 100.0% UBU 100.0% > 2864971776/4507248640 (63.6%) @2.9x, remaining 5:21 RBU 100.0% UBU 100.0% > 2883584000/4507248640 (64.0%) @4.0x, remaining 5:17 RBU 100.0% UBU 100.0% > 2902196224/4507248640 (64.4%) @4.0x, remaining 5:13 RBU 100.0% UBU 100.0% > 2920841216/4507248640 (64.8%) @4.0x, remaining 5:09 RBU 100.0% UBU 100.0% > 2939453440/4507248640 (65.2%) @4.0x, remaining 5:05 RBU 100.0% UBU 88.2% > 2958032896/4507248640 (65.6%) @4.0x, remaining 5:02 RBU 100.0% UBU 100.0% > 2976645120/4507248640 (66.0%) @4.0x, remaining 4:58 RBU 100.0% UBU 100.0% > 2995257344/4507248640 (66.5%) @4.0x, remaining 4:54 RBU 100.0% UBU 100.0% > 3013902336/4507248640 (66.9%) @4.0x, remaining 4:50 RBU 100.0% UBU 100.0% > 3032514560/4507248640 (67.3%) @4.0x, remaining 4:46 RBU 100.0% UBU 100.0% > 3051126784/4507248640 (67.7%) @4.0x, remaining 4:43 RBU 100.0% UBU 100.0% > 3069739008/4507248640 (68.1%) @4.0x, remaining 4:39 RBU 100.0% UBU 100.0% > 3088351232/4507248640 (68.5%) @4.0x, remaining 4:35 RBU 100.0% UBU 100.0% > 3106963456/4507248640 (68.9%) @4.0x, remaining 4:31 RBU 100.0% UBU 100.0% > 3125575680/4507248640 (69.3%) @4.0x, remaining 4:28 RBU 100.0% UBU 100.0% > 3144220672/4507248640 (69.8%) @4.0x, remaining 4:24 RBU 100.0% UBU 94.1% > 3162865664/4507248640 (70.2%) @4.0x, remaining 4:20 RBU 100.0% UBU 100.0% > 3176169472/4507248640 (70.5%) @2.9x, remaining 4:18 RBU 100.0% UBU 100.0% > 3194781696/4507248640 (70.9%) @4.0x, remaining 4:14 RBU 100.0% UBU 100.0% > 3213393920/4507248640 (71.3%) @4.0x, remaining 4:10 RBU 100.0% UBU 100.0% > 3232006144/4507248640 (71.7%) @4.0x, remaining 4:07 RBU 99.2% UBU 100.0% > 3250618368/4507248640 (72.1%) @4.0x, remaining 4:03 RBU 100.0% UBU 100.0% > 3269197824/4507248640 (72.5%) @4.0x, remaining 3:59 RBU 100.0% UBU 100.0% > 3287842816/4507248640 (72.9%) @4.0x, remaining 3:56 RBU 99.2% UBU 100.0% > 3306455040/4507248640 (73.4%) @4.0x, remaining 3:52 RBU 100.0% UBU 94.1% > 3325067264/4507248640 (73.8%) @4.0x, remaining 3:48 RBU 100.0% UBU 100.0% > 3343679488/4507248640 (74.2%) @4.0x, remaining 3:45 RBU 100.0% UBU 100.0% > 3362291712/4507248640 (74.6%) @4.0x, remaining 3:41 RBU 100.0% UBU 100.0% > 3380903936/4507248640 (75.0%) @4.0x, remaining 3:37 RBU 100.0% UBU 100.0% > 3399516160/4507248640 (75.4%) @4.0x, remaining 3:34 RBU 100.0% UBU 100.0% > 3418161152/4507248640 (75.8%) @4.0x, remaining 3:30 RBU 100.0% UBU 100.0% > 3436806144/4507248640 (76.3%) @4.0x, remaining 3:26 RBU 98.4% UBU 100.0% > 3455418368/4507248640 (76.7%) @4.0x, remaining 3:23 RBU 100.0% UBU 100.0% > 3474030592/4507248640 (77.1%) @4.0x, remaining 3:19 RBU 100.0% UBU 100.0% > 3487367168/4507248640 (77.4%) @2.9x, remaining 3:16 RBU 100.0% UBU 100.0% > 3505979392/4507248640 (77.8%) @4.0x, remaining 3:13 RBU 100.0% UBU 100.0% > 3524591616/4507248640 (78.2%) @4.0x, remaining 3:09 RBU 100.0% UBU 100.0% > 3543236608/4507248640 (78.6%) @4.0x, remaining 3:05 RBU 100.0% UBU 100.0% > 3561848832/4507248640 (79.0%) @4.0x, remaining 3:02 RBU 100.0% UBU 100.0% > 3580461056/4507248640 (79.4%) @4.0x, remaining 2:58 RBU 100.0% UBU 100.0% > 3599073280/4507248640 (79.9%) @4.0x, remaining 2:54 RBU 100.0% UBU 100.0% > 3617718272/4507248640 (80.3%) @4.0x, remaining 2:51 RBU 98.4% UBU 100.0% > 3636363264/4507248640 (80.7%) @4.0x, remaining 2:47 RBU 100.0% UBU 100.0% > 3654975488/4507248640 (81.1%) @4.0x, remaining 2:43 RBU 100.0% UBU 100.0% > 3673587712/4507248640 (81.5%) @4.0x, remaining 2:40 RBU 100.0% UBU 100.0% > 3692265472/4507248640 (81.9%) @4.0x, remaining 2:36 RBU 100.0% UBU 100.0% > 3710877696/4507248640 (82.3%) @4.0x, remaining 2:33 RBU 100.0% UBU 100.0% > 3729489920/4507248640 (82.7%) @4.0x, remaining 2:29 RBU 100.0% UBU 100.0% > 3748134912/4507248640 (83.2%) @4.0x, remaining 2:25 RBU 100.0% UBU 97.1% > 3766747136/4507248640 (83.6%) @4.0x, remaining 2:22 RBU 100.0% UBU 100.0% > 3785228288/4507248640 (84.0%) @4.0x, remaining 2:18 RBU 100.0% UBU 100.0% > 3798597632/4507248640 (84.3%) @2.9x, remaining 2:16 RBU 98.4% UBU 100.0% > 3817209856/4507248640 (84.7%) @4.0x, remaining 2:12 RBU 100.0% UBU 97.1% > 3835822080/4507248640 (85.1%) @4.0x, remaining 2:09 RBU 100.0% UBU 100.0% > 3854434304/4507248640 (85.5%) @4.0x, remaining 2:05 RBU 100.0% UBU 100.0% > 3873046528/4507248640 (85.9%) @4.0x, remaining 2:01 RBU 100.0% UBU 100.0% > 3891658752/4507248640 (86.3%) @4.0x, remaining 1:58 RBU 100.0% UBU 100.0% > 3910270976/4507248640 (86.8%) @4.0x, remaining 1:54 RBU 100.0% UBU 100.0% > 3928883200/4507248640 (87.2%) @4.0x, remaining 1:50 RBU 99.2% UBU 100.0% > 3947495424/4507248640 (87.6%) @4.0x, remaining 1:47 RBU 100.0% UBU 97.1% > 3966107648/4507248640 (88.0%) @4.0x, remaining 1:43 RBU 100.0% UBU 100.0% > 3984752640/4507248640 (88.4%) @4.0x, remaining 1:40 RBU 100.0% UBU 100.0% > 4003332096/4507248640 (88.8%) @4.0x, remaining 1:36 RBU 100.0% UBU 100.0% > 4022009856/4507248640 (89.2%) @4.0x, remaining 1:32 RBU 99.2% UBU 100.0% > 4040622080/4507248640 (89.6%) @4.0x, remaining 1:29 RBU 100.0% UBU 100.0% > 4059267072/4507248640 (90.1%) @4.0x, remaining 1:25 RBU 100.0% UBU 100.0% > 4077879296/4507248640 (90.5%) @4.0x, remaining 1:22 RBU 100.0% UBU 100.0% > 4095606784/4507248640 (90.9%) @3.8x, remaining 1:18 RBU 100.0% UBU 100.0% > 4109631488/4507248640 (91.2%) @3.0x, remaining 1:16 RBU 100.0% UBU 97.1% > 4128243712/4507248640 (91.6%) @4.0x, remaining 1:12 RBU 100.0% UBU 100.0% > 4146855936/4507248640 (92.0%) @4.0x, remaining 1:09 RBU 100.0% UBU 97.1% > 4165468160/4507248640 (92.4%) @4.0x, remaining 1:05 RBU 100.0% UBU 100.0% > 4184080384/4507248640 (92.8%) @4.0x, remaining 1:01 RBU 100.0% UBU 100.0% > 4202692608/4507248640 (93.2%) @4.0x, remaining 0:58 RBU 100.0% UBU 100.0% > 4221337600/4507248640 (93.7%) @4.0x, remaining 0:54 RBU 99.2% UBU 97.1% > 4239949824/4507248640 (94.1%) @4.0x, remaining 0:51 RBU 100.0% UBU 97.1% > 4258562048/4507248640 (94.5%) @4.0x, remaining 0:47 RBU 100.0% UBU 100.0% > 4277174272/4507248640 (94.9%) @4.0x, remaining 0:43 RBU 100.0% UBU 100.0% > 4295786496/4507248640 (95.3%) @4.0x, remaining 0:40 RBU 100.0% UBU 100.0% > 4314431488/4507248640 (95.7%) @4.0x, remaining 0:36 RBU 100.0% UBU 100.0% > 4333043712/4507248640 (96.1%) @4.0x, remaining 0:33 RBU 100.0% UBU 100.0% > 4351688704/4507248640 (96.5%) @4.0x, remaining 0:29 RBU 100.0% UBU 91.2% > 4370300928/4507248640 (97.0%) @4.0x, remaining 0:26 RBU 100.0% UBU 100.0% > 4388913152/4507248640 (97.4%) @4.0x, remaining 0:22 RBU 100.0% UBU 100.0% > 4405985280/4507248640 (97.8%) @3.7x, remaining 0:19 RBU 100.0% UBU 100.0% > 4420796416/4507248640 (98.1%) @3.2x, remaining 0:16 RBU 100.0% UBU 100.0% > 4439375872/4507248640 (98.5%) @4.0x, remaining 0:12 RBU 100.0% UBU 100.0% > 4458053632/4507248640 (98.9%) @4.0x, remaining 0:09 RBU 100.0% UBU 100.0% > 4476633088/4507248640 (99.3%) @4.0x, remaining 0:05 RBU 100.0% UBU 100.0% > 4495245312/4507248640 (99.7%) @4.0x, remaining 0:02 RBU 98.4% UBU 100.0% >/dev/hda: flushing cache >/dev/hda: closing track >/dev/hda: closing disc > >growisofs command: >----------------------- >/usr/bin/growisofs -Z /dev/hda=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=tracksize:2200805 -dvd-compat -speed=4 -use-the-force-luke=bufsize:32m > >mkisofs >----------------------- >2200805 >INFO: UTF-8 character encoding detected by locale settings. > Assuming UTF-8 encoded filenames on source filesystem, > use -input-charset to override. >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Virtual Private Networks V1.01.iso (Cisco Networking Academy Program - PIX Firewall Fundamentals V1.11.iso) >Using CISCO_NETWORKING_ACADEMY_001.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - PIX Firewall Fundamentals V1.11.iso (Cisco Networking Academy Program - IT Essentials II - Network Operating Systems V2.0.iso) >Using CISCO_NETWORKING_ACADEMY_002.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - IT Essentials II - Network Operating Systems V2.0.iso (Cisco Networking Academy Program - IT Essentials I - PC Hardware and Software V2.0.iso) >Using CISCO_NETWORKING_ACADEMY_003.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - IT Essentials I - PC Hardware and Software V2.0.iso (Cisco Networking Academy Program - Intrusion Detection System V2.1.iso) >Using CISCO_NETWORKING_ACADEMY_004.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Intrusion Detection System V2.1.iso (Cisco Networking Academy Program - Fundementals of Voice and Data Cabling V1.2.iso) >Using CISCO_NETWORKING_ACADEMY_005.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundementals of Voice and Data Cabling V1.2.iso (Cisco Networking Academy Program - Fundamentals of Web Design V1.2.iso) >Using CISCO_NETWORKING_ACADEMY_006.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Web Design V1.2.iso (Cisco Networking Academy Program - Fundamentals Of UNIX V2.0.iso) >Using CISCO_NETWORKING_ACADEMY_PRO000 for Cisco Networking Academy Program/Cisco Networking Academy Program - PIX Firewal Advanced (Cisco Networking Academy Program - Fundamentals of Java Programming) >Using CISCO_NETWORKING_ACADEMY_PRO001 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Java Programming (Cisco Networking Academy Program - Companion Guide) >Using CISCO_NETWORKING_ACADEMY_PRO002 for Cisco Networking Academy Program/Cisco Networking Academy Program - Companion Guide (Cisco Networking Academy Program - CCNP 3.0 english) >Using CISCO_NETWORKING_ACADEMY_007.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals Of UNIX V2.0.iso (Cisco Networking Academy Program - CCNA Networking Basics V3.0.iso) >Using CISCO_NETWORKING_ACADEMY_PRO003 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english (Cisco Networking Academy Program - CCNA 3.1.1 english) >Using CISCO_NETWORKING_ACADEMY_PRO004 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1.1 english (Cisco Networking Academy Program - CCNA 3.1 english) >Using CISCO_NETWORKING_ACADEMY_PRO005 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1 english (Cisco Networking Academy Program - CCNA 3.0 english) >Using CISCO_NETWORKING_ACADEMY_008.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA Networking Basics V3.0.iso (Cisco Networking Academy Program - CCNA 3.0 Bridge 1.iso) >Using CISCO_NETWORKING_ACADEMY_PRO006 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.0 english (Cisco Networking Academy Program - CCNA 2.14 english) >Using CISCO_NETWORKING_ACADEMY_PRO007 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 2.14 english (Cisco Networking Academy Program - Fundamentals of Wireless LANs) >Using CISCO_NETWORKING_ACADEMY_009.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.0 Bridge 1.iso (Cisco Networking Academy Program - Fundamentals of Network Security V 1.1.iso) >Using CISCO_NETWORKING_ACADEMY_00A.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Network Security V 1.1.iso (Cisco Networking Academy Program - CCSP Cisco Secure PIX Firewall Advanced V 2.0.iso) >Using CISCO_NETWORKING_ACADEMY_00B.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCSP Cisco Secure PIX Firewall Advanced V 2.0.iso (Cisco Networking Academy Program - CCNP Semester 7 Switching V 1.0.iso) >Using CISCO_NETWORKING_ACADEMY_00C.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP Semester 7 Switching V 1.0.iso (Cisco Networking Academy Program - CCNP Semester 5 Advanced Routing V 2.0.iso) >Using CISCO_NETWORKING_ACADEMY_PRO008 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Wireless LANs (Cisco Networking Academy Program - CCNA V3.0 Powerpoint) >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Wireless LANs/Cisco Networking Academy Program - Fundamentals of Wireless LANS V1.0.iso (Cisco Networking Academy Program - Fundamentals of Wireless Lan V1.1.iso) >Using CISCO_NETWORKING_ACADEMY_001.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Wireless LANs/Cisco Networking Academy Program - Fundamentals of Wireless Lan V1.1.iso (Cisco Networking Academy Program - Fundamentals of Wireless LANs V1.1.iso) >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 2.14 english/Cisco Networking Academy Program - CCNA 4 - Wan Technologies V2.14.iso (Cisco Networking Academy Program - CCNA 3 - Switching Basics And Intermediate Routing V 2.14.iso) >Using CISCO_NETWORKING_ACADEMY_001.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 2.14 english/Cisco Networking Academy Program - CCNA 3 - Switching Basics And Intermediate Routing V 2.14.iso (Cisco Networking Academy Program - CCNA 2 - Routers And Routing Basics V 2.14.iso) >Using CISCO_NETWORKING_ACADEMY_002.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 2.14 english/Cisco Networking Academy Program - CCNA 2 - Routers And Routing Basics V 2.14.iso (Cisco Networking Academy Program - CCNA 1- Networking Basics V 2.14.iso) >Using CISCO_PRESS___CCNA_3_0_E000.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.0 english/Cisco Press - CCNA 3.0 english Semester IV.iso (Cisco Press - CCNA 3.0 english Semester III.iso) >Using CISCO_PRESS___CCNA_3_0_E001.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.0 english/Cisco Press - CCNA 3.0 english Semester III.iso (Cisco Press - CCNA 3.0 english Semester II.iso) >Using CISCO_PRESS___CCNA_3_0_E002.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.0 english/Cisco Press - CCNA 3.0 english Semester II.iso (Cisco Press - CCNA 3.0 english Semester I.iso) >Using CISCO_PRESS___CCNA_3_1_E000.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1 english/Cisco Press - CCNA 3.1 english Semester IV.iso (Cisco Press - CCNA 3.1 english Semester III.iso) >Using CISCO_PRESS___CCNA_3_1_E001.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1 english/Cisco Press - CCNA 3.1 english Semester III.iso (Cisco Press - CCNA 3.1 english Semester II.iso) >Using CISCO_PRESS___CCNA_3_1_E002.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1 english/Cisco Press - CCNA 3.1 english Semester II.iso (Cisco Press - CCNA 3.1 english Semester I.iso) >Using CISCO_NETWORKING_ACADEMY_P000.I;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1.1 english/Cisco Networking Academy Program - CCNA Semester 4 Wan Technologies V3.1.1.iso (Cisco Networking Academy Program - CCNA Semester 3 Switching Basic And Intermediate Routing v3.1.1.iso) >Using CISCO_NETWORKING_ACADEMY_P001.I;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1.1 english/Cisco Networking Academy Program - CCNA Semester 3 Switching Basic And Intermediate Routing v3.1.1.iso (Cisco Networking Academy Program - CCNA Semester 2 Routers And Routing Basics v3.1.1.iso) >Using CISCO_NETWORKING_ACADEMY_P002.I;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNA 3.1.1 english/Cisco Networking Academy Program - CCNA Semester 2 Routers And Routing Basics v3.1.1.iso (Cisco Networking Academy Program - CCNA Semester 1 Networking Basics v3.1.1.iso) >Using CISCO_PRESS___CCNP_3_0_E000.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Press - CCNP 3.0 english Semester IV Troubleshooting.iso (Cisco Press - CCNP 3.0 english Semester III Switching.iso) >Using CISCO_PRESS___CCNP_3_0_E001.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Press - CCNP 3.0 english Semester III Switching.iso (Cisco Press - CCNP 3.0 english Semester II Access Remote.iso) >Using CISCO_PRESS___CCNP_3_0_E002.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Press - CCNP 3.0 english Semester II Access Remote.iso (Cisco Press - CCNP 3.0 english Semester I Routing.iso) >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Networking Academy Program - CCNP 4 - Network Troubleshooting V3.0.iso (Cisco Networking Academy Program - CCNP 3 - Multilayer Switching V3.0.iso) >Using CISCO_NETWORKING_ACADEMY_001.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Networking Academy Program - CCNP 3 - Multilayer Switching V3.0.iso (Cisco Networking Academy Program - CCNP 2 - Remote Access V3.0.iso) >Using CISCO_NETWORKING_ACADEMY_002.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - CCNP 3.0 english/Cisco Networking Academy Program - CCNP 2 - Remote Access V3.0.iso (Cisco Networking Academy Program - CCNP 1 - Advanced Routing V3.0.iso) >Using CISCO_NETWORKING_ACADEMY000.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Companion Guide/Cisco Networking Academy Program - CCNA Second-Year Companion Guide CCNA e-lab Activities.iso (Cisco Networking Academy Program - CCNA First-Year Companion Guide CCNA e-lab Activities.iso) >Using CISCO_NETWORKING_ACADEMY001.ISO;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Companion Guide/Cisco Networking Academy Program - CCNA First-Year Companion Guide CCNA e-lab Activities.iso (Cisco Networking Academy Program - CCNA 1 And 2 Companion Guide, 3th Edition.iso) >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - Fundamentals of Java Programming/Cisco Networking Academy Program - Fundamentals of Java Programming V1.2.iso (Cisco Networking Academy Program - Fundamentals of Java Programming V1.1.iso) >Using CISCO_NETWORKING_ACADEMY_000.IS;1 for Cisco Networking Academy Program/Cisco Networking Academy Program - PIX Firewal Advanced/Cisco Networking Academy Program - PIX Firewall Advanced V2.0.iso (Cisco Networking Academy Program - PIX Firewal Advanced V1.01.iso) > 0.02% done, estimate finish Sat May 31 00:24:17 2008 > 0.05% done, estimate finish Sat May 31 00:24:17 2008 > 0.07% done, estimate finish Sat May 31 00:24:17 2008 > 0.09% done, estimate finish Sat May 31 00:42:36 2008 > 0.11% done, estimate finish Sat May 31 00:38:52 2008 > 0.14% done, estimate finish Sat May 31 06:29:59 2008 > 0.16% done, estimate finish Sat May 31 05:48:42 2008 > 0.18% done, estimate finish Sat May 31 05:08:28 2008 > 0.21% done, estimate finish Sat May 31 04:36:14 2008 > 0.23% done, estimate finish Sat May 31 04:11:17 2008 > 0.25% done, estimate finish Sat May 31 03:57:30 2008 > 0.27% done, estimate finish Sat May 31 03:39:52 2008 > 0.30% done, estimate finish Sat May 31 03:24:30 2008 > 0.32% done, estimate finish Sat May 31 03:11:44 2008 > 0.34% done, estimate finish Sat May 31 03:00:40 2008 > 0.36% done, estimate finish Sat May 31 02:55:34 2008 > 0.39% done, estimate finish Sat May 31 02:46:28 2008 > 0.41% done, estimate finish Sat May 31 02:38:38 2008 > 0.43% done, estimate finish Sat May 31 02:31:37 2008 > 0.45% done, estimate finish Sat May 31 02:25:18 2008 > 0.48% done, estimate finish Sat May 31 02:22:54 2008 > 0.50% done, estimate finish Sat May 31 02:17:33 2008 > 0.52% done, estimate finish Sat May 31 02:12:40 2008 > 0.55% done, estimate finish Sat May 31 02:08:12 2008 > 0.57% done, estimate finish Sat May 31 02:06:52 2008 > 0.59% done, estimate finish Sat May 31 02:02:58 2008 > 0.61% done, estimate finish Sat May 31 01:59:20 2008 > 0.64% done, estimate finish Sat May 31 01:55:58 2008 > 0.66% done, estimate finish Sat May 31 01:52:44 2008 > 0.68% done, estimate finish Sat May 31 01:52:15 2008 > 0.70% done, estimate finish Sat May 31 01:49:26 2008 > 0.73% done, estimate finish Sat May 31 01:46:48 2008 > 0.75% done, estimate finish Sat May 31 01:44:14 2008 > 0.77% done, estimate finish Sat May 31 01:44:04 2008 > 0.80% done, estimate finish Sat May 31 01:41:48 2008 > 0.82% done, estimate finish Sat May 31 01:39:40 2008 > 0.84% done, estimate finish Sat May 31 01:37:35 2008 > 0.86% done, estimate finish Sat May 31 01:35:40 2008 > 0.89% done, estimate finish Sat May 31 01:35:44 2008 > 0.91% done, estimate finish Sat May 31 01:33:58 2008 > 0.93% done, estimate finish Sat May 31 01:32:16 2008 > 0.95% done, estimate finish Sat May 31 01:30:37 2008 > 0.98% done, estimate finish Sat May 31 01:29:05 2008 > 1.00% done, estimate finish Sat May 31 01:29:17 2008 > 1.02% done, estimate finish Sat May 31 01:27:51 2008 > 1.05% done, estimate finish Sat May 31 01:26:26 2008 > 1.07% done, estimate finish Sat May 31 01:25:08 2008 > 1.09% done, estimate finish Sat May 31 01:25:24 2008 > 1.11% done, estimate finish Sat May 31 01:24:10 2008 > 1.14% done, estimate finish Sat May 31 01:22:56 2008 > 1.16% done, estimate finish Sat May 31 01:21:48 2008 > 1.18% done, estimate finish Sat May 31 01:20:42 2008 > 1.20% done, estimate finish Sat May 31 01:21:02 2008 > 1.23% done, estimate finish Sat May 31 01:19:57 2008 > 1.25% done, estimate finish Sat May 31 01:18:57 2008 > 1.27% done, estimate finish Sat May 31 01:17:59 2008 > 1.30% done, estimate finish Sat May 31 01:17:02 2008 > 1.32% done, estimate finish Sat May 31 01:17:23 2008 > 1.34% done, estimate finish Sat May 31 01:16:30 2008 > 1.36% done, estimate finish Sat May 31 01:15:36 2008 > 1.39% done, estimate finish Sat May 31 01:14:46 2008 > 1.41% done, estimate finish Sat May 31 01:13:58 2008 > 1.43% done, estimate finish Sat May 31 01:14:21 2008 > 1.45% done, estimate finish Sat May 31 01:13:33 2008 > 1.48% done, estimate finish Sat May 31 01:12:48 2008 > 1.50% done, estimate finish Sat May 31 01:12:04 2008 > 1.52% done, estimate finish Sat May 31 01:12:27 2008 > 1.55% done, estimate finish Sat May 31 01:11:44 2008 > 1.57% done, estimate finish Sat May 31 01:11:03 2008 > 1.59% done, estimate finish Sat May 31 01:10:23 2008 > 1.61% done, estimate finish Sat May 31 01:09:44 2008 > 1.64% done, estimate finish Sat May 31 01:10:07 2008 > 1.66% done, estimate finish Sat May 31 01:09:29 2008 > 1.68% done, estimate finish Sat May 31 01:08:53 2008 > 1.70% done, estimate finish Sat May 31 01:08:17 2008 > 1.73% done, estimate finish Sat May 31 01:07:42 2008 > 1.75% done, estimate finish Sat May 31 01:08:05 2008 > 1.77% done, estimate finish Sat May 31 01:07:32 2008 > 1.79% done, estimate finish Sat May 31 01:06:59 2008 > 1.82% done, estimate finish Sat May 31 01:06:27 2008 > 1.84% done, estimate finish Sat May 31 01:05:56 2008 > 1.86% done, estimate finish Sat May 31 01:06:19 2008 > 1.89% done, estimate finish Sat May 31 01:05:49 2008 > 1.91% done, estimate finish Sat May 31 01:05:19 2008 > 1.93% done, estimate finish Sat May 31 01:04:50 2008 > 1.95% done, estimate finish Sat May 31 01:05:13 2008 > 1.98% done, estimate finish Sat May 31 01:04:45 2008 > 2.00% done, estimate finish Sat May 31 01:04:17 2008 > 2.02% done, estimate finish Sat May 31 01:03:50 2008 > 2.04% done, estimate finish Sat May 31 01:03:24 2008 > 2.07% done, estimate finish Sat May 31 01:03:47 2008 > 2.09% done, estimate finish Sat May 31 01:03:20 2008 > 2.11% done, estimate finish Sat May 31 01:02:55 2008 > 2.14% done, estimate finish Sat May 31 01:02:31 2008 > 2.16% done, estimate finish Sat May 31 01:02:07 2008 > 2.18% done, estimate finish Sat May 31 01:02:28 2008 > 2.20% done, estimate finish Sat May 31 01:02:05 2008 > 2.23% done, estimate finish Sat May 31 01:01:42 2008 > 2.25% done, estimate finish Sat May 31 01:01:19 2008 > 2.27% done, estimate finish Sat May 31 01:00:57 2008 > 2.30% done, estimate finish Sat May 31 01:01:19 2008 > 2.32% done, estimate finish Sat May 31 01:00:57 2008 > 2.34% done, estimate finish Sat May 31 01:00:36 2008 > 2.36% done, estimate finish Sat May 31 01:00:14 2008 > 2.39% done, estimate finish Sat May 31 00:59:54 2008 > 2.41% done, estimate finish Sat May 31 01:00:16 2008 > 2.43% done, estimate finish Sat May 31 00:59:56 2008 > 2.45% done, estimate finish Sat May 31 00:59:35 2008 > 2.48% done, estimate finish Sat May 31 00:59:16 2008 > 2.50% done, estimate finish Sat May 31 00:59:37 2008 > 2.52% done, estimate finish Sat May 31 00:59:18 2008 > 2.55% done, estimate finish Sat May 31 00:58:59 2008 > 2.57% done, estimate finish Sat May 31 00:58:41 2008 > 2.59% done, estimate finish Sat May 31 00:58:23 2008 > 2.61% done, estimate finish Sat May 31 00:58:43 2008 > 2.64% done, estimate finish Sat May 31 00:58:25 2008 > 2.66% done, estimate finish Sat May 31 00:58:08 2008 > 2.68% done, estimate finish Sat May 31 00:57:51 2008 > 2.70% done, estimate finish Sat May 31 00:57:33 2008 > 2.73% done, estimate finish Sat May 31 00:57:54 2008 > 2.75% done, estimate finish Sat May 31 00:57:37 2008 > 2.77% done, estimate finish Sat May 31 00:57:21 2008 > 2.79% done, estimate finish Sat May 31 00:57:04 2008 > 2.82% done, estimate finish Sat May 31 00:56:49 2008 > 2.84% done, estimate finish Sat May 31 00:57:08 2008 > 2.86% done, estimate finish Sat May 31 00:56:53 2008 > 2.89% done, estimate finish Sat May 31 00:56:37 2008 > 2.91% done, estimate finish Sat May 31 00:56:22 2008 > 2.93% done, estimate finish Sat May 31 00:56:07 2008 > 2.95% done, estimate finish Sat May 31 00:56:26 2008 > 2.98% done, estimate finish Sat May 31 00:56:11 2008 > 3.00% done, estimate finish Sat May 31 00:55:57 2008 > 3.02% done, estimate finish Sat May 31 00:55:43 2008 > 3.04% done, estimate finish Sat May 31 00:55:29 2008 > 3.07% done, estimate finish Sat May 31 00:55:47 2008 > 3.09% done, estimate finish Sat May 31 00:55:33 2008 > 3.11% done, estimate finish Sat May 31 00:55:20 2008 > 3.14% done, estimate finish Sat May 31 00:55:06 2008 > 3.16% done, estimate finish Sat May 31 00:54:53 2008 > 3.18% done, estimate finish Sat May 31 00:55:11 2008 > 3.20% done, estimate finish Sat May 31 00:54:58 2008 > 3.23% done, estimate finish Sat May 31 00:54:45 2008 > 3.25% done, estimate finish Sat May 31 00:54:32 2008 > 3.27% done, estimate finish Sat May 31 00:54:50 2008 > 3.29% done, estimate finish Sat May 31 00:54:38 2008 > 3.32% done, estimate finish Sat May 31 00:54:25 2008 > 3.34% done, estimate finish Sat May 31 00:54:13 2008 > 3.36% done, estimate finish Sat May 31 00:54:01 2008 > 3.39% done, estimate finish Sat May 31 00:54:18 2008 > 3.41% done, estimate finish Sat May 31 00:54:06 2008 > 3.43% done, estimate finish Sat May 31 00:53:54 2008 > 3.45% done, estimate finish Sat May 31 00:53:43 2008 > 3.48% done, estimate finish Sat May 31 00:53:31 2008 > 3.50% done, estimate finish Sat May 31 00:53:49 2008 > 3.52% done, estimate finish Sat May 31 00:53:37 2008 > 3.54% done, estimate finish Sat May 31 00:53:26 2008 > 3.57% done, estimate finish Sat May 31 00:53:15 2008 > 3.59% done, estimate finish Sat May 31 00:53:04 2008 > 3.61% done, estimate finish Sat May 31 00:53:20 2008 > 3.64% done, estimate finish Sat May 31 00:53:09 2008 > 3.66% done, estimate finish Sat May 31 00:52:59 2008 > 3.68% done, estimate finish Sat May 31 00:52:48 2008 > 3.70% done, estimate finish Sat May 31 00:52:37 2008 > 3.73% done, estimate finish Sat May 31 00:52:54 2008 > 3.75% done, estimate finish Sat May 31 00:52:44 2008 > 3.77% done, estimate finish Sat May 31 00:52:34 2008 > 3.79% done, estimate finish Sat May 31 00:52:23 2008 > 3.82% done, estimate finish Sat May 31 00:52:13 2008 > 3.84% done, estimate finish Sat May 31 00:52:29 2008 > 3.86% done, estimate finish Sat May 31 00:52:19 2008 > 3.89% done, estimate finish Sat May 31 00:52:09 2008 > 3.91% done, estimate finish Sat May 31 00:52:00 2008 > 3.93% done, estimate finish Sat May 31 00:51:50 2008 > 3.95% done, estimate finish Sat May 31 00:52:06 2008 > 3.98% done, estimate finish Sat May 31 00:51:56 2008 > 4.00% done, estimate finish Sat May 31 00:51:47 2008 > 4.02% done, estimate finish Sat May 31 00:51:38 2008 > 4.04% done, estimate finish Sat May 31 00:51:29 2008 > 4.07% done, estimate finish Sat May 31 00:51:44 2008 > 4.09% done, estimate finish Sat May 31 00:51:35 2008 > 4.11% done, estimate finish Sat May 31 00:51:26 2008 > 4.13% done, estimate finish Sat May 31 00:51:17 2008 > 4.16% done, estimate finish Sat May 31 00:51:08 2008 > 4.18% done, estimate finish Sat May 31 00:51:23 2008 > 4.20% done, estimate finish Sat May 31 00:51:14 2008 > 4.23% done, estimate finish Sat May 31 00:51:06 2008 > 4.25% done, estimate finish Sat May 31 00:50:57 2008 > 4.27% done, estimate finish Sat May 31 00:50:48 2008 > 4.29% done, estimate finish Sat May 31 00:51:03 2008 > 4.32% done, estimate finish Sat May 31 00:50:55 2008 > 4.34% done, estimate finish Sat May 31 00:50:46 2008 > 4.36% done, estimate finish Sat May 31 00:50:38 2008 > 4.38% done, estimate finish Sat May 31 00:50:30 2008 > 4.41% done, estimate finish Sat May 31 00:50:45 2008 > 4.43% done, estimate finish Sat May 31 00:50:36 2008 > 4.45% done, estimate finish Sat May 31 00:50:28 2008 > 4.48% done, estimate finish Sat May 31 00:50:20 2008 > 4.50% done, estimate finish Sat May 31 00:50:13 2008 > 4.52% done, estimate finish Sat May 31 00:50:27 2008 > 4.54% done, estimate finish Sat May 31 00:50:19 2008 > 4.57% done, estimate finish Sat May 31 00:50:11 2008 > 4.59% done, estimate finish Sat May 31 00:50:04 2008 > 4.61% done, estimate finish Sat May 31 00:49:56 2008 > 4.64% done, estimate finish Sat May 31 00:50:10 2008 > 4.66% done, estimate finish Sat May 31 00:50:02 2008 > 4.68% done, estimate finish Sat May 31 00:49:55 2008 > 4.70% done, estimate finish Sat May 31 00:49:47 2008 > 4.73% done, estimate finish Sat May 31 00:49:40 2008 > 4.75% done, estimate finish Sat May 31 00:49:54 2008 > 4.77% done, estimate finish Sat May 31 00:49:47 2008 > 4.79% done, estimate finish Sat May 31 00:49:39 2008 > 4.82% done, estimate finish Sat May 31 00:49:32 2008 > 4.84% done, estimate finish Sat May 31 00:49:25 2008 > 4.86% done, estimate finish Sat May 31 00:49:39 2008 > 4.89% done, estimate finish Sat May 31 00:49:31 2008 > 4.91% done, estimate finish Sat May 31 00:49:24 2008 > 4.93% done, estimate finish Sat May 31 00:49:17 2008 > 4.95% done, estimate finish Sat May 31 00:49:11 2008 > 4.98% done, estimate finish Sat May 31 00:49:24 2008 > 5.00% done, estimate finish Sat May 31 00:49:17 2008 > 5.02% done, estimate finish Sat May 31 00:49:10 2008 > 5.04% done, estimate finish Sat May 31 00:49:04 2008 > 5.07% done, estimate finish Sat May 31 00:48:57 2008 > 5.09% done, estimate finish Sat May 31 00:48:50 2008 > 5.11% done, estimate finish Sat May 31 00:49:03 2008 > 5.13% done, estimate finish Sat May 31 00:48:57 2008 > 5.16% done, estimate finish Sat May 31 00:48:50 2008 > 5.18% done, estimate finish Sat May 31 00:48:44 2008 > 5.20% done, estimate finish Sat May 31 00:48:37 2008 > 5.23% done, estimate finish Sat May 31 00:48:50 2008 > 5.25% done, estimate finish Sat May 31 00:48:44 2008 > 5.27% done, estimate finish Sat May 31 00:48:37 2008 > 5.29% done, estimate finish Sat May 31 00:48:31 2008 > 5.32% done, estimate finish Sat May 31 00:48:25 2008 > 5.34% done, estimate finish Sat May 31 00:48:37 2008 > 5.36% done, estimate finish Sat May 31 00:48:31 2008 > 5.38% done, estimate finish Sat May 31 00:48:25 2008 > 5.41% done, estimate finish Sat May 31 00:48:19 2008 > 5.43% done, estimate finish Sat May 31 00:48:13 2008 > 5.45% done, estimate finish Sat May 31 00:48:25 2008 > 5.48% done, estimate finish Sat May 31 00:48:19 2008 > 5.50% done, estimate finish Sat May 31 00:48:13 2008 > 5.52% done, estimate finish Sat May 31 00:48:07 2008 > 5.54% done, estimate finish Sat May 31 00:48:02 2008 > 5.57% done, estimate finish Sat May 31 00:48:14 2008 > 5.59% done, estimate finish Sat May 31 00:48:08 2008 > 5.61% done, estimate finish Sat May 31 00:48:02 2008 > 5.63% done, estimate finish Sat May 31 00:47:56 2008 > 5.66% done, estimate finish Sat May 31 00:47:51 2008 > 5.68% done, estimate finish Sat May 31 00:48:03 2008 > 5.70% done, estimate finish Sat May 31 00:47:57 2008 > 5.73% done, estimate finish Sat May 31 00:47:51 2008 > 5.75% done, estimate finish Sat May 31 00:47:46 2008 > 5.77% done, estimate finish Sat May 31 00:47:40 2008 > 5.79% done, estimate finish Sat May 31 00:47:52 2008 > 5.82% done, estimate finish Sat May 31 00:47:46 2008 > 5.84% done, estimate finish Sat May 31 00:47:41 2008 > 5.86% done, estimate finish Sat May 31 00:47:35 2008 > 5.88% done, estimate finish Sat May 31 00:47:30 2008 > 5.91% done, estimate finish Sat May 31 00:47:42 2008 > 5.93% done, estimate finish Sat May 31 00:47:36 2008 > 5.95% done, estimate finish Sat May 31 00:47:31 2008 > 5.98% done, estimate finish Sat May 31 00:47:25 2008 > 6.00% done, estimate finish Sat May 31 00:47:20 2008 > 6.02% done, estimate finish Sat May 31 00:47:15 2008 > 6.04% done, estimate finish Sat May 31 00:47:26 2008 > 6.07% done, estimate finish Sat May 31 00:47:21 2008 > 6.09% done, estimate finish Sat May 31 00:47:16 2008 > 6.11% done, estimate finish Sat May 31 00:47:11 2008 > 6.13% done, estimate finish Sat May 31 00:47:06 2008 > 6.16% done, estimate finish Sat May 31 00:47:17 2008 > 6.18% done, estimate finish Sat May 31 00:47:12 2008 > 6.20% done, estimate finish Sat May 31 00:47:07 2008 > 6.23% done, estimate finish Sat May 31 00:47:02 2008 > 6.25% done, estimate finish Sat May 31 00:46:57 2008 > 6.27% done, estimate finish Sat May 31 00:47:08 2008 > 6.29% done, estimate finish Sat May 31 00:47:03 2008 > 6.32% done, estimate finish Sat May 31 00:46:58 2008 > 6.34% done, estimate finish Sat May 31 00:46:53 2008 > 6.36% done, estimate finish Sat May 31 00:46:48 2008 > 6.38% done, estimate finish Sat May 31 00:46:59 2008 > 6.41% done, estimate finish Sat May 31 00:46:54 2008 > 6.43% done, estimate finish Sat May 31 00:46:50 2008 > 6.45% done, estimate finish Sat May 31 00:46:45 2008 > 6.48% done, estimate finish Sat May 31 00:46:40 2008 > 6.50% done, estimate finish Sat May 31 00:46:51 2008 > 6.52% done, estimate finish Sat May 31 00:46:46 2008 > 6.54% done, estimate finish Sat May 31 00:46:41 2008 > 6.57% done, estimate finish Sat May 31 00:46:37 2008 > 6.59% done, estimate finish Sat May 31 00:46:32 2008 > 6.61% done, estimate finish Sat May 31 00:46:28 2008 > 6.63% done, estimate finish Sat May 31 00:46:38 2008 > 6.66% done, estimate finish Sat May 31 00:46:33 2008 > 6.68% done, estimate finish Sat May 31 00:46:29 2008 > 6.70% done, estimate finish Sat May 31 00:46:24 2008 > 6.73% done, estimate finish Sat May 31 00:46:20 2008 > 6.75% done, estimate finish Sat May 31 00:46:30 2008 > 6.77% done, estimate finish Sat May 31 00:46:26 2008 > 6.79% done, estimate finish Sat May 31 00:46:21 2008 > 6.82% done, estimate finish Sat May 31 00:46:17 2008 > 6.84% done, estimate finish Sat May 31 00:46:13 2008 > 6.86% done, estimate finish Sat May 31 00:46:23 2008 > 6.88% done, estimate finish Sat May 31 00:46:18 2008 > 6.91% done, estimate finish Sat May 31 00:46:14 2008 > 6.93% done, estimate finish Sat May 31 00:46:10 2008 > 6.95% done, estimate finish Sat May 31 00:46:05 2008 > 6.97% done, estimate finish Sat May 31 00:46:01 2008 > 7.00% done, estimate finish Sat May 31 00:46:11 2008 > 7.02% done, estimate finish Sat May 31 00:46:07 2008 > 7.04% done, estimate finish Sat May 31 00:46:03 2008 > 7.07% done, estimate finish Sat May 31 00:45:59 2008 > 7.09% done, estimate finish Sat May 31 00:45:54 2008 > 7.11% done, estimate finish Sat May 31 00:46:04 2008 > 7.13% done, estimate finish Sat May 31 00:46:00 2008 > 7.16% done, estimate finish Sat May 31 00:45:56 2008 > 7.18% done, estimate finish Sat May 31 00:45:52 2008 > 7.20% done, estimate finish Sat May 31 00:45:48 2008 > 7.22% done, estimate finish Sat May 31 00:45:58 2008 > 7.25% done, estimate finish Sat May 31 00:45:54 2008 > 7.27% done, estimate finish Sat May 31 00:45:49 2008 > 7.29% done, estimate finish Sat May 31 00:45:45 2008 > 7.32% done, estimate finish Sat May 31 00:45:41 2008 > 7.34% done, estimate finish Sat May 31 00:45:51 2008 > 7.36% done, estimate finish Sat May 31 00:45:47 2008 > 7.38% done, estimate finish Sat May 31 00:45:43 2008 > 7.41% done, estimate finish Sat May 31 00:45:39 2008 > 7.43% done, estimate finish Sat May 31 00:45:35 2008 > 7.45% done, estimate finish Sat May 31 00:45:31 2008 > 7.47% done, estimate finish Sat May 31 00:45:41 2008 > 7.50% done, estimate finish Sat May 31 00:45:37 2008 > 7.52% done, estimate finish Sat May 31 00:45:33 2008 > 7.54% done, estimate finish Sat May 31 00:45:29 2008 > 7.57% done, estimate finish Sat May 31 00:45:25 2008 > 7.59% done, estimate finish Sat May 31 00:45:35 2008 > 7.61% done, estimate finish Sat May 31 00:45:31 2008 > 7.63% done, estimate finish Sat May 31 00:45:27 2008 > 7.66% done, estimate finish Sat May 31 00:45:23 2008 > 7.68% done, estimate finish Sat May 31 00:45:20 2008 > 7.70% done, estimate finish Sat May 31 00:45:29 2008 > 7.73% done, estimate finish Sat May 31 00:45:25 2008 > 7.75% done, estimate finish Sat May 31 00:45:21 2008 > 7.77% done, estimate finish Sat May 31 00:45:18 2008 > 7.79% done, estimate finish Sat May 31 00:45:14 2008 > 7.82% done, estimate finish Sat May 31 00:45:10 2008 > 7.84% done, estimate finish Sat May 31 00:45:19 2008 > 7.86% done, estimate finish Sat May 31 00:45:16 2008 > 7.88% done, estimate finish Sat May 31 00:45:12 2008 > 7.91% done, estimate finish Sat May 31 00:45:09 2008 > 7.93% done, estimate finish Sat May 31 00:45:05 2008 > 7.95% done, estimate finish Sat May 31 00:45:14 2008 > 7.97% done, estimate finish Sat May 31 00:45:11 2008 > 8.00% done, estimate finish Sat May 31 00:45:07 2008 > 8.02% done, estimate finish Sat May 31 00:45:03 2008 > 8.04% done, estimate finish Sat May 31 00:45:00 2008 > 8.07% done, estimate finish Sat May 31 00:45:09 2008 > 8.09% done, estimate finish Sat May 31 00:45:05 2008 > 8.11% done, estimate finish Sat May 31 00:45:02 2008 > 8.13% done, estimate finish Sat May 31 00:44:58 2008 > 8.16% done, estimate finish Sat May 31 00:44:55 2008 > 8.18% done, estimate finish Sat May 31 00:44:51 2008 > 8.20% done, estimate finish Sat May 31 00:45:00 2008 > 8.22% done, estimate finish Sat May 31 00:44:57 2008 > 8.25% done, estimate finish Sat May 31 00:44:53 2008 > 8.27% done, estimate finish Sat May 31 00:44:50 2008 > 8.29% done, estimate finish Sat May 31 00:44:46 2008 > 8.32% done, estimate finish Sat May 31 00:45:07 2008 > 8.34% done, estimate finish Sat May 31 00:45:40 2008 > 8.36% done, estimate finish Sat May 31 00:45:36 2008 > 8.38% done, estimate finish Sat May 31 00:45:33 2008 > 8.41% done, estimate finish Sat May 31 00:45:29 2008 > 8.43% done, estimate finish Sat May 31 00:45:26 2008 > 8.45% done, estimate finish Sat May 31 00:45:34 2008 > 8.47% done, estimate finish Sat May 31 00:45:31 2008 > 8.50% done, estimate finish Sat May 31 00:45:28 2008 > 8.52% done, estimate finish Sat May 31 00:45:24 2008 > 8.54% done, estimate finish Sat May 31 00:45:21 2008 > 8.57% done, estimate finish Sat May 31 00:45:17 2008 > 8.59% done, estimate finish Sat May 31 00:45:26 2008 > 8.61% done, estimate finish Sat May 31 00:45:22 2008 > 8.63% done, estimate finish Sat May 31 00:45:19 2008 > 8.66% done, estimate finish Sat May 31 00:45:16 2008 > 8.68% done, estimate finish Sat May 31 00:45:12 2008 > 8.70% done, estimate finish Sat May 31 00:45:21 2008 > 8.72% done, estimate finish Sat May 31 00:45:17 2008 > 8.75% done, estimate finish Sat May 31 00:45:14 2008 > 8.77% done, estimate finish Sat May 31 00:45:11 2008 > 8.79% done, estimate finish Sat May 31 00:45:08 2008 > 8.82% done, estimate finish Sat May 31 00:45:04 2008 > 8.84% done, estimate finish Sat May 31 00:45:12 2008 > 8.86% done, estimate finish Sat May 31 00:45:09 2008 > 8.88% done, estimate finish Sat May 31 00:45:06 2008 > 8.91% done, estimate finish Sat May 31 00:45:03 2008 > 8.93% done, estimate finish Sat May 31 00:45:00 2008 > 8.95% done, estimate finish Sat May 31 00:45:08 2008 > 8.97% done, estimate finish Sat May 31 00:45:05 2008 > 9.00% done, estimate finish Sat May 31 00:45:01 2008 > 9.02% done, estimate finish Sat May 31 00:44:58 2008 > 9.04% done, estimate finish Sat May 31 00:44:55 2008 > 9.06% done, estimate finish Sat May 31 00:44:52 2008 > 9.09% done, estimate finish Sat May 31 00:45:00 2008 > 9.11% done, estimate finish Sat May 31 00:44:57 2008 > 9.13% done, estimate finish Sat May 31 00:44:54 2008 > 9.16% done, estimate finish Sat May 31 00:44:51 2008 > 9.18% done, estimate finish Sat May 31 00:44:48 2008 > 9.20% done, estimate finish Sat May 31 00:44:55 2008 > 9.22% done, estimate finish Sat May 31 00:44:52 2008 > 9.25% done, estimate finish Sat May 31 00:44:49 2008 > 9.27% done, estimate finish Sat May 31 00:44:46 2008 > 9.29% done, estimate finish Sat May 31 00:44:43 2008 > 9.32% done, estimate finish Sat May 31 00:44:40 2008 > 9.34% done, estimate finish Sat May 31 00:44:48 2008 > 9.36% done, estimate finish Sat May 31 00:44:45 2008 > 9.38% done, estimate finish Sat May 31 00:44:42 2008 > 9.41% done, estimate finish Sat May 31 00:44:39 2008 > 9.43% done, estimate finish Sat May 31 00:44:36 2008 > 9.45% done, estimate finish Sat May 31 00:44:44 2008 > 9.47% done, estimate finish Sat May 31 00:44:41 2008 > 9.50% done, estimate finish Sat May 31 00:44:38 2008 > 9.52% done, estimate finish Sat May 31 00:44:35 2008 > 9.54% done, estimate finish Sat May 31 00:44:32 2008 > 9.57% done, estimate finish Sat May 31 00:44:40 2008 > 9.59% done, estimate finish Sat May 31 00:44:37 2008 > 9.61% done, estimate finish Sat May 31 00:44:34 2008 > 9.63% done, estimate finish Sat May 31 00:44:31 2008 > 9.66% done, estimate finish Sat May 31 00:44:28 2008 > 9.68% done, estimate finish Sat May 31 00:44:25 2008 > 9.70% done, estimate finish Sat May 31 00:44:33 2008 > 9.72% done, estimate finish Sat May 31 00:44:30 2008 > 9.75% done, estimate finish Sat May 31 00:44:27 2008 > 9.77% done, estimate finish Sat May 31 00:44:24 2008 > 9.79% done, estimate finish Sat May 31 00:44:22 2008 > 9.82% done, estimate finish Sat May 31 00:44:29 2008 > 9.84% done, estimate finish Sat May 31 00:44:26 2008 > 9.86% done, estimate finish Sat May 31 00:44:23 2008 > 9.88% done, estimate finish Sat May 31 00:44:21 2008 > 9.91% done, estimate finish Sat May 31 00:44:18 2008 > 9.93% done, estimate finish Sat May 31 00:44:15 2008 > 9.95% done, estimate finish Sat May 31 00:44:22 2008 > 9.97% done, estimate finish Sat May 31 00:44:20 2008 > 10.00% done, estimate finish Sat May 31 00:44:17 2008 > 10.02% done, estimate finish Sat May 31 00:44:14 2008 > 10.04% done, estimate finish Sat May 31 00:44:11 2008 > 10.06% done, estimate finish Sat May 31 00:44:19 2008 > 10.09% done, estimate finish Sat May 31 00:44:16 2008 > 10.11% done, estimate finish Sat May 31 00:44:13 2008 > 10.13% done, estimate finish Sat May 31 00:44:11 2008 > 10.16% done, estimate finish Sat May 31 00:44:08 2008 > 10.18% done, estimate finish Sat May 31 00:44:05 2008 > 10.20% done, estimate finish Sat May 31 00:44:12 2008 > 10.22% done, estimate finish Sat May 31 00:44:10 2008 > 10.25% done, estimate finish Sat May 31 00:44:07 2008 > 10.27% done, estimate finish Sat May 31 00:44:04 2008 > 10.29% done, estimate finish Sat May 31 00:44:02 2008 > 10.31% done, estimate finish Sat May 31 00:44:09 2008 > 10.34% done, estimate finish Sat May 31 00:44:06 2008 > 10.36% done, estimate finish Sat May 31 00:44:04 2008 > 10.38% done, estimate finish Sat May 31 00:44:01 2008 > 10.41% done, estimate finish Sat May 31 00:43:59 2008 > 10.43% done, estimate finish Sat May 31 00:43:56 2008 > 10.45% done, estimate finish Sat May 31 00:44:03 2008 > 10.47% done, estimate finish Sat May 31 00:44:00 2008 > 10.50% done, estimate finish Sat May 31 00:43:58 2008 > 10.52% done, estimate finish Sat May 31 00:43:55 2008 > 10.54% done, estimate finish Sat May 31 00:43:53 2008 > 10.56% done, estimate finish Sat May 31 00:44:00 2008 > 10.59% done, estimate finish Sat May 31 00:43:57 2008 > 10.61% done, estimate finish Sat May 31 00:43:55 2008 > 10.63% done, estimate finish Sat May 31 00:43:52 2008 > 10.66% done, estimate finish Sat May 31 00:43:50 2008 > 10.68% done, estimate finish Sat May 31 00:43:56 2008 > 10.70% done, estimate finish Sat May 31 00:43:54 2008 > 10.72% done, estimate finish Sat May 31 00:43:51 2008 > 10.75% done, estimate finish Sat May 31 00:43:49 2008 > 10.77% done, estimate finish Sat May 31 00:43:46 2008 > 10.79% done, estimate finish Sat May 31 00:43:44 2008 > 10.81% done, estimate finish Sat May 31 00:43:51 2008 > 10.84% done, estimate finish Sat May 31 00:43:48 2008 > 10.86% done, estimate finish Sat May 31 00:43:46 2008 > 10.88% done, estimate finish Sat May 31 00:43:43 2008 > 10.91% done, estimate finish Sat May 31 00:43:41 2008 > 10.93% done, estimate finish Sat May 31 00:43:48 2008 > 10.95% done, estimate finish Sat May 31 00:43:45 2008 > 10.97% done, estimate finish Sat May 31 00:43:43 2008 > 11.00% done, estimate finish Sat May 31 00:43:41 2008 > 11.02% done, estimate finish Sat May 31 00:43:38 2008 > 11.04% done, estimate finish Sat May 31 00:43:36 2008 > 11.06% done, estimate finish Sat May 31 00:43:42 2008 > 11.09% done, estimate finish Sat May 31 00:43:40 2008 > 11.11% done, estimate finish Sat May 31 00:43:38 2008 > 11.13% done, estimate finish Sat May 31 00:43:35 2008 > 11.16% done, estimate finish Sat May 31 00:43:33 2008 > 11.18% done, estimate finish Sat May 31 00:43:40 2008 > 11.20% done, estimate finish Sat May 31 00:43:37 2008 > 11.22% done, estimate finish Sat May 31 00:43:35 2008 > 11.25% done, estimate finish Sat May 31 00:43:32 2008 > 11.27% done, estimate finish Sat May 31 00:43:30 2008 > 11.29% done, estimate finish Sat May 31 00:43:28 2008 > 11.31% done, estimate finish Sat May 31 00:43:34 2008 > 11.34% done, estimate finish Sat May 31 00:43:32 2008 > 11.36% done, estimate finish Sat May 31 00:43:30 2008 > 11.38% done, estimate finish Sat May 31 00:43:27 2008 > 11.41% done, estimate finish Sat May 31 00:43:25 2008 > 11.43% done, estimate finish Sat May 31 00:43:32 2008 > 11.45% done, estimate finish Sat May 31 00:43:29 2008 > 11.47% done, estimate finish Sat May 31 00:43:27 2008 > 11.50% done, estimate finish Sat May 31 00:43:25 2008 > 11.52% done, estimate finish Sat May 31 00:43:22 2008 > 11.54% done, estimate finish Sat May 31 00:43:20 2008 > 11.56% done, estimate finish Sat May 31 00:43:27 2008 > 11.59% done, estimate finish Sat May 31 00:43:24 2008 > 11.61% done, estimate finish Sat May 31 00:43:22 2008 > 11.63% done, estimate finish Sat May 31 00:43:20 2008 > 11.66% done, estimate finish Sat May 31 00:43:18 2008 > 11.68% done, estimate finish Sat May 31 00:43:24 2008 > 11.70% done, estimate finish Sat May 31 00:43:22 2008 > 11.72% done, estimate finish Sat May 31 00:43:20 2008 > 11.75% done, estimate finish Sat May 31 00:43:17 2008 > 11.77% done, estimate finish Sat May 31 00:43:15 2008 > 11.79% done, estimate finish Sat May 31 00:43:13 2008 > 11.81% done, estimate finish Sat May 31 00:43:19 2008 > 11.84% done, estimate finish Sat May 31 00:43:17 2008 > 11.86% done, estimate finish Sat May 31 00:43:15 2008 > 11.88% done, estimate finish Sat May 31 00:43:13 2008 > 11.91% done, estimate finish Sat May 31 00:43:10 2008 > 11.93% done, estimate finish Sat May 31 00:43:17 2008 > 11.95% done, estimate finish Sat May 31 00:43:15 2008 > 11.97% done, estimate finish Sat May 31 00:43:12 2008 > 12.00% done, estimate finish Sat May 31 00:43:10 2008 > 12.02% done, estimate finish Sat May 31 00:43:08 2008 > 12.04% done, estimate finish Sat May 31 00:43:14 2008 > 12.06% done, estimate finish Sat May 31 00:43:12 2008 > 12.09% done, estimate finish Sat May 31 00:43:10 2008 > 12.11% done, estimate finish Sat May 31 00:43:08 2008 > 12.13% done, estimate finish Sat May 31 00:43:06 2008 > 12.16% done, estimate finish Sat May 31 00:43:04 2008 > 12.18% done, estimate finish Sat May 31 00:43:10 2008 > 12.20% done, estimate finish Sat May 31 00:43:08 2008 > 12.22% done, estimate finish Sat May 31 00:43:06 2008 > 12.25% done, estimate finish Sat May 31 00:43:03 2008 > 12.27% done, estimate finish Sat May 31 00:43:01 2008 > 12.29% done, estimate finish Sat May 31 00:43:07 2008 > 12.31% done, estimate finish Sat May 31 00:43:05 2008 > 12.34% done, estimate finish Sat May 31 00:43:03 2008 > 12.36% done, estimate finish Sat May 31 00:43:01 2008 > 12.38% done, estimate finish Sat May 31 00:42:59 2008 > 12.40% done, estimate finish Sat May 31 00:42:57 2008 > 12.43% done, estimate finish Sat May 31 00:43:03 2008 > 12.45% done, estimate finish Sat May 31 00:43:01 2008 > 12.47% done, estimate finish Sat May 31 00:42:59 2008 > 12.50% done, estimate finish Sat May 31 00:42:57 2008 > 12.52% done, estimate finish Sat May 31 00:42:55 2008 > 12.54% done, estimate finish Sat May 31 00:43:01 2008 > 12.56% done, estimate finish Sat May 31 00:42:59 2008 > 12.59% done, estimate finish Sat May 31 00:42:57 2008 > 12.61% done, estimate finish Sat May 31 00:42:55 2008 > 12.63% done, estimate finish Sat May 31 00:42:53 2008 > 12.65% done, estimate finish Sat May 31 00:42:51 2008 > 12.68% done, estimate finish Sat May 31 00:42:57 2008 > 12.70% done, estimate finish Sat May 31 00:42:55 2008 > 12.72% done, estimate finish Sat May 31 00:42:53 2008 > 12.75% done, estimate finish Sat May 31 00:42:51 2008 > 12.77% done, estimate finish Sat May 31 00:42:49 2008 > 12.79% done, estimate finish Sat May 31 00:42:54 2008 > 12.81% done, estimate finish Sat May 31 00:42:52 2008 > 12.84% done, estimate finish Sat May 31 00:42:51 2008 > 12.86% done, estimate finish Sat May 31 00:42:49 2008 > 12.88% done, estimate finish Sat May 31 00:42:47 2008 > 12.90% done, estimate finish Sat May 31 00:42:52 2008 > 12.93% done, estimate finish Sat May 31 00:42:50 2008 > 12.95% done, estimate finish Sat May 31 00:42:48 2008 > 12.97% done, estimate finish Sat May 31 00:42:47 2008 > 13.00% done, estimate finish Sat May 31 00:42:45 2008 > 13.02% done, estimate finish Sat May 31 00:42:43 2008 > 13.04% done, estimate finish Sat May 31 00:42:48 2008 > 13.06% done, estimate finish Sat May 31 00:42:46 2008 > 13.09% done, estimate finish Sat May 31 00:42:45 2008 > 13.11% done, estimate finish Sat May 31 00:42:43 2008 > 13.13% done, estimate finish Sat May 31 00:42:41 2008 > 13.15% done, estimate finish Sat May 31 00:42:46 2008 > 13.18% done, estimate finish Sat May 31 00:42:44 2008 > 13.20% done, estimate finish Sat May 31 00:42:43 2008 > 13.22% done, estimate finish Sat May 31 00:42:41 2008 > 13.25% done, estimate finish Sat May 31 00:42:39 2008 > 13.27% done, estimate finish Sat May 31 00:42:37 2008 > 13.29% done, estimate finish Sat May 31 00:42:43 2008 > 13.31% done, estimate finish Sat May 31 00:42:41 2008 > 13.34% done, estimate finish Sat May 31 00:42:39 2008 > 13.36% done, estimate finish Sat May 31 00:42:37 2008 > 13.38% done, estimate finish Sat May 31 00:42:35 2008 > 13.40% done, estimate finish Sat May 31 00:42:41 2008 > 13.43% done, estimate finish Sat May 31 00:42:39 2008 > 13.45% done, estimate finish Sat May 31 00:42:37 2008 > 13.47% done, estimate finish Sat May 31 00:42:35 2008 > 13.50% done, estimate finish Sat May 31 00:42:33 2008 > 13.52% done, estimate finish Sat May 31 00:42:31 2008 > 13.54% done, estimate finish Sat May 31 00:42:37 2008 > 13.56% done, estimate finish Sat May 31 00:42:35 2008 > 13.59% done, estimate finish Sat May 31 00:42:33 2008 > 13.61% done, estimate finish Sat May 31 00:42:31 2008 > 13.63% done, estimate finish Sat May 31 00:42:30 2008 > 13.65% done, estimate finish Sat May 31 00:42:35 2008 > 13.68% done, estimate finish Sat May 31 00:42:33 2008 > 13.70% done, estimate finish Sat May 31 00:42:31 2008 > 13.72% done, estimate finish Sat May 31 00:42:30 2008 > 13.75% done, estimate finish Sat May 31 00:42:28 2008 > 13.77% done, estimate finish Sat May 31 00:42:26 2008 > 13.79% done, estimate finish Sat May 31 00:42:31 2008 > 13.81% done, estimate finish Sat May 31 00:42:30 2008 > 13.84% done, estimate finish Sat May 31 00:42:28 2008 > 13.86% done, estimate finish Sat May 31 00:42:26 2008 > 13.88% done, estimate finish Sat May 31 00:42:24 2008 > 13.90% done, estimate finish Sat May 31 00:42:30 2008 > 13.93% done, estimate finish Sat May 31 00:42:28 2008 > 13.95% done, estimate finish Sat May 31 00:42:26 2008 > 13.97% done, estimate finish Sat May 31 00:42:24 2008 > 13.99% done, estimate finish Sat May 31 00:42:23 2008 > 14.02% done, estimate finish Sat May 31 00:42:21 2008 > 14.04% done, estimate finish Sat May 31 00:42:26 2008 > 14.06% done, estimate finish Sat May 31 00:42:24 2008 > 14.09% done, estimate finish Sat May 31 00:42:23 2008 > 14.11% done, estimate finish Sat May 31 00:42:21 2008 > 14.13% done, estimate finish Sat May 31 00:42:19 2008 > 14.15% done, estimate finish Sat May 31 00:42:25 2008 > 14.18% done, estimate finish Sat May 31 00:42:23 2008 > 14.20% done, estimate finish Sat May 31 00:42:21 2008 > 14.22% done, estimate finish Sat May 31 00:42:19 2008 > 14.24% done, estimate finish Sat May 31 00:42:18 2008 > 14.27% done, estimate finish Sat May 31 00:42:23 2008 > 14.29% done, estimate finish Sat May 31 00:42:21 2008 > 14.31% done, estimate finish Sat May 31 00:42:19 2008 > 14.34% done, estimate finish Sat May 31 00:42:18 2008 > 14.36% done, estimate finish Sat May 31 00:42:16 2008 > 14.38% done, estimate finish Sat May 31 00:42:14 2008 > 14.40% done, estimate finish Sat May 31 00:42:20 2008 > 14.43% done, estimate finish Sat May 31 00:42:18 2008 > 14.45% done, estimate finish Sat May 31 00:42:16 2008 > 14.47% done, estimate finish Sat May 31 00:42:14 2008 > 14.50% done, estimate finish Sat May 31 00:42:13 2008 > 14.52% done, estimate finish Sat May 31 00:42:18 2008 > 14.54% done, estimate finish Sat May 31 00:42:16 2008 > 14.56% done, estimate finish Sat May 31 00:42:15 2008 > 14.59% done, estimate finish Sat May 31 00:42:13 2008 > 14.61% done, estimate finish Sat May 31 00:42:11 2008 > 14.63% done, estimate finish Sat May 31 00:42:10 2008 > 14.65% done, estimate finish Sat May 31 00:42:15 2008 > 14.68% done, estimate finish Sat May 31 00:42:13 2008 > 14.70% done, estimate finish Sat May 31 00:42:11 2008 > 14.72% done, estimate finish Sat May 31 00:42:10 2008 > 14.75% done, estimate finish Sat May 31 00:42:08 2008 > 14.77% done, estimate finish Sat May 31 00:42:13 2008 > 14.79% done, estimate finish Sat May 31 00:42:12 2008 > 14.81% done, estimate finish Sat May 31 00:42:10 2008 > 14.84% done, estimate finish Sat May 31 00:42:08 2008 > 14.86% done, estimate finish Sat May 31 00:42:07 2008 > 14.88% done, estimate finish Sat May 31 00:42:05 2008 > 14.90% done, estimate finish Sat May 31 00:42:10 2008 > 14.93% done, estimate finish Sat May 31 00:42:08 2008 > 14.95% done, estimate finish Sat May 31 00:42:07 2008 > 14.97% done, estimate finish Sat May 31 00:42:05 2008 > 15.00% done, estimate finish Sat May 31 00:42:04 2008 > 15.02% done, estimate finish Sat May 31 00:42:09 2008 > 15.04% done, estimate finish Sat May 31 00:42:07 2008 > 15.06% done, estimate finish Sat May 31 00:42:05 2008 > 15.09% done, estimate finish Sat May 31 00:42:04 2008 > 15.11% done, estimate finish Sat May 31 00:42:02 2008 > 15.13% done, estimate finish Sat May 31 00:42:01 2008 > 15.15% done, estimate finish Sat May 31 00:42:06 2008 > 15.18% done, estimate finish Sat May 31 00:42:04 2008 > 15.20% done, estimate finish Sat May 31 00:42:02 2008 > 15.22% done, estimate finish Sat May 31 00:42:07 2008 > 15.24% done, estimate finish Sat May 31 00:42:06 2008 > 15.27% done, estimate finish Sat May 31 00:42:04 2008 > 15.29% done, estimate finish Sat May 31 00:42:09 2008 > 15.31% done, estimate finish Sat May 31 00:42:07 2008 > 15.34% done, estimate finish Sat May 31 00:42:06 2008 > 15.36% done, estimate finish Sat May 31 00:42:04 2008 > 15.38% done, estimate finish Sat May 31 00:42:03 2008 > 15.40% done, estimate finish Sat May 31 00:42:08 2008 > 15.43% done, estimate finish Sat May 31 00:42:06 2008 > 15.45% done, estimate finish Sat May 31 00:42:04 2008 > 15.47% done, estimate finish Sat May 31 00:42:03 2008 > 15.49% done, estimate finish Sat May 31 00:42:01 2008 > 15.52% done, estimate finish Sat May 31 00:42:06 2008 > 15.54% done, estimate finish Sat May 31 00:42:05 2008 > 15.56% done, estimate finish Sat May 31 00:42:03 2008 > 15.59% done, estimate finish Sat May 31 00:42:02 2008 > 15.61% done, estimate finish Sat May 31 00:42:00 2008 > 15.63% done, estimate finish Sat May 31 00:41:58 2008 > 15.65% done, estimate finish Sat May 31 00:42:03 2008 > 15.68% done, estimate finish Sat May 31 00:42:02 2008 > 15.70% done, estimate finish Sat May 31 00:42:00 2008 > 15.72% done, estimate finish Sat May 31 00:41:59 2008 > 15.74% done, estimate finish Sat May 31 00:41:57 2008 > 15.77% done, estimate finish Sat May 31 00:42:02 2008 > 15.79% done, estimate finish Sat May 31 00:42:00 2008 > 15.81% done, estimate finish Sat May 31 00:41:59 2008 > 15.84% done, estimate finish Sat May 31 00:41:57 2008 > 15.86% done, estimate finish Sat May 31 00:41:56 2008 > 15.88% done, estimate finish Sat May 31 00:41:54 2008 > 15.90% done, estimate finish Sat May 31 00:41:59 2008 > 15.93% done, estimate finish Sat May 31 00:41:58 2008 > 15.95% done, estimate finish Sat May 31 00:41:56 2008 > 15.97% done, estimate finish Sat May 31 00:41:55 2008 > 15.99% done, estimate finish Sat May 31 00:41:53 2008 > 16.02% done, estimate finish Sat May 31 00:41:58 2008 > 16.04% done, estimate finish Sat May 31 00:41:56 2008 > 16.06% done, estimate finish Sat May 31 00:41:55 2008 > 16.09% done, estimate finish Sat May 31 00:41:53 2008 > 16.11% done, estimate finish Sat May 31 00:41:52 2008 > 16.13% done, estimate finish Sat May 31 00:41:50 2008 > 16.15% done, estimate finish Sat May 31 00:41:55 2008 > 16.18% done, estimate finish Sat May 31 00:41:54 2008 > 16.20% done, estimate finish Sat May 31 00:41:52 2008 > 16.22% done, estimate finish Sat May 31 00:41:51 2008 > 16.24% done, estimate finish Sat May 31 00:41:49 2008 > 16.27% done, estimate finish Sat May 31 00:41:54 2008 > 16.29% done, estimate finish Sat May 31 00:41:52 2008 > 16.31% done, estimate finish Sat May 31 00:41:51 2008 > 16.34% done, estimate finish Sat May 31 00:41:49 2008 > 16.36% done, estimate finish Sat May 31 00:41:48 2008 > 16.38% done, estimate finish Sat May 31 00:41:53 2008 > 16.40% done, estimate finish Sat May 31 00:41:51 2008 > 16.43% done, estimate finish Sat May 31 00:41:50 2008 > 16.45% done, estimate finish Sat May 31 00:41:48 2008 > 16.47% done, estimate finish Sat May 31 00:41:47 2008 > 16.49% done, estimate finish Sat May 31 00:41:45 2008 > 16.52% done, estimate finish Sat May 31 00:41:50 2008 > 16.54% done, estimate finish Sat May 31 00:41:49 2008 > 16.56% done, estimate finish Sat May 31 00:41:47 2008 > 16.58% done, estimate finish Sat May 31 00:41:46 2008 > 16.61% done, estimate finish Sat May 31 00:41:44 2008 > 16.63% done, estimate finish Sat May 31 00:41:49 2008 > 16.65% done, estimate finish Sat May 31 00:41:47 2008 > 16.68% done, estimate finish Sat May 31 00:41:46 2008 > 16.70% done, estimate finish Sat May 31 00:41:44 2008 > 16.72% done, estimate finish Sat May 31 00:41:43 2008 > 16.74% done, estimate finish Sat May 31 00:41:42 2008 > 16.77% done, estimate finish Sat May 31 00:41:46 2008 > 16.79% done, estimate finish Sat May 31 00:41:45 2008 > 16.81% done, estimate finish Sat May 31 00:41:43 2008 > 16.84% done, estimate finish Sat May 31 00:41:42 2008 > 16.86% done, estimate finish Sat May 31 00:41:41 2008 > 16.88% done, estimate finish Sat May 31 00:41:45 2008 > 16.90% done, estimate finish Sat May 31 00:41:44 2008 > 16.93% done, estimate finish Sat May 31 00:41:42 2008 > 16.95% done, estimate finish Sat May 31 00:41:41 2008 > 16.97% done, estimate finish Sat May 31 00:41:39 2008 > 16.99% done, estimate finish Sat May 31 00:41:38 2008 > 17.02% done, estimate finish Sat May 31 00:41:43 2008 > 17.04% done, estimate finish Sat May 31 00:41:41 2008 > 17.06% done, estimate finish Sat May 31 00:41:40 2008 > 17.09% done, estimate finish Sat May 31 00:41:38 2008 > 17.11% done, estimate finish Sat May 31 00:41:37 2008 > 17.13% done, estimate finish Sat May 31 00:41:41 2008 > 17.15% done, estimate finish Sat May 31 00:41:40 2008 > 17.18% done, estimate finish Sat May 31 00:41:39 2008 > 17.20% done, estimate finish Sat May 31 00:41:37 2008 > 17.22% done, estimate finish Sat May 31 00:41:36 2008 > 17.24% done, estimate finish Sat May 31 00:41:35 2008 > 17.27% done, estimate finish Sat May 31 00:41:39 2008 > 17.29% done, estimate finish Sat May 31 00:41:38 2008 > 17.31% done, estimate finish Sat May 31 00:41:36 2008 > 17.34% done, estimate finish Sat May 31 00:41:35 2008 > 17.36% done, estimate finish Sat May 31 00:41:33 2008 > 17.38% done, estimate finish Sat May 31 00:41:38 2008 > 17.40% done, estimate finish Sat May 31 00:41:37 2008 > 17.43% done, estimate finish Sat May 31 00:41:35 2008 > 17.45% done, estimate finish Sat May 31 00:41:34 2008 > 17.47% done, estimate finish Sat May 31 00:41:32 2008 > 17.49% done, estimate finish Sat May 31 00:41:37 2008 > 17.52% done, estimate finish Sat May 31 00:41:36 2008 > 17.54% done, estimate finish Sat May 31 00:41:34 2008 > 17.56% done, estimate finish Sat May 31 00:41:33 2008 > 17.58% done, estimate finish Sat May 31 00:41:31 2008 > 17.61% done, estimate finish Sat May 31 00:41:30 2008 > 17.63% done, estimate finish Sat May 31 00:41:34 2008 > 17.65% done, estimate finish Sat May 31 00:41:33 2008 > 17.68% done, estimate finish Sat May 31 00:41:32 2008 > 17.70% done, estimate finish Sat May 31 00:41:31 2008 > 17.72% done, estimate finish Sat May 31 00:41:29 2008 > 17.74% done, estimate finish Sat May 31 00:41:33 2008 > 17.77% done, estimate finish Sat May 31 00:41:32 2008 > 17.79% done, estimate finish Sat May 31 00:41:31 2008 > 17.81% done, estimate finish Sat May 31 00:41:29 2008 > 17.83% done, estimate finish Sat May 31 00:41:28 2008 > 17.86% done, estimate finish Sat May 31 00:41:27 2008 > 17.88% done, estimate finish Sat May 31 00:41:31 2008 > 17.90% done, estimate finish Sat May 31 00:41:30 2008 > 17.93% done, estimate finish Sat May 31 00:41:29 2008 > 17.95% done, estimate finish Sat May 31 00:41:27 2008 > 17.97% done, estimate finish Sat May 31 00:41:26 2008 > 17.99% done, estimate finish Sat May 31 00:41:30 2008 > 18.02% done, estimate finish Sat May 31 00:41:29 2008 > 18.04% done, estimate finish Sat May 31 00:41:28 2008 > 18.06% done, estimate finish Sat May 31 00:41:26 2008 > 18.08% done, estimate finish Sat May 31 00:41:25 2008 > 18.11% done, estimate finish Sat May 31 00:41:24 2008 > 18.13% done, estimate finish Sat May 31 00:41:28 2008 > 18.15% done, estimate finish Sat May 31 00:41:27 2008 > 18.18% done, estimate finish Sat May 31 00:41:25 2008 > 18.20% done, estimate finish Sat May 31 00:41:24 2008 > 18.22% done, estimate finish Sat May 31 00:41:23 2008 > 18.24% done, estimate finish Sat May 31 00:41:27 2008 > 18.27% done, estimate finish Sat May 31 00:41:26 2008 > 18.29% done, estimate finish Sat May 31 00:41:24 2008 > 18.31% done, estimate finish Sat May 31 00:41:23 2008 > 18.33% done, estimate finish Sat May 31 00:41:22 2008 > 18.36% done, estimate finish Sat May 31 00:41:21 2008 > 18.38% done, estimate finish Sat May 31 00:41:25 2008 > 18.40% done, estimate finish Sat May 31 00:41:24 2008 > 18.43% done, estimate finish Sat May 31 00:41:22 2008 > 18.45% done, estimate finish Sat May 31 00:41:21 2008 > 18.47% done, estimate finish Sat May 31 00:41:20 2008 > 18.49% done, estimate finish Sat May 31 00:41:24 2008 > 18.52% done, estimate finish Sat May 31 00:41:23 2008 > 18.54% done, estimate finish Sat May 31 00:41:21 2008 > 18.56% done, estimate finish Sat May 31 00:41:20 2008 > 18.58% done, estimate finish Sat May 31 00:41:19 2008 > 18.61% done, estimate finish Sat May 31 00:41:18 2008 > 18.63% done, estimate finish Sat May 31 00:41:22 2008 > 18.65% done, estimate finish Sat May 31 00:41:20 2008 > 18.68% done, estimate finish Sat May 31 00:41:19 2008 > 18.70% done, estimate finish Sat May 31 00:41:18 2008 > 18.72% done, estimate finish Sat May 31 00:41:17 2008 > 18.74% done, estimate finish Sat May 31 00:41:21 2008 > 18.77% done, estimate finish Sat May 31 00:41:20 2008 > 18.79% done, estimate finish Sat May 31 00:41:18 2008 > 18.81% done, estimate finish Sat May 31 00:41:17 2008 > 18.83% done, estimate finish Sat May 31 00:41:16 2008 > 18.86% done, estimate finish Sat May 31 00:41:20 2008 > 18.88% done, estimate finish Sat May 31 00:41:19 2008 > 18.90% done, estimate finish Sat May 31 00:41:18 2008 > 18.92% done, estimate finish Sat May 31 00:41:16 2008 > 18.95% done, estimate finish Sat May 31 00:41:15 2008 > 18.97% done, estimate finish Sat May 31 00:41:14 2008 > 18.99% done, estimate finish Sat May 31 00:41:18 2008 > 19.02% done, estimate finish Sat May 31 00:41:17 2008 > 19.04% done, estimate finish Sat May 31 00:41:15 2008 > 19.06% done, estimate finish Sat May 31 00:41:14 2008 > 19.08% done, estimate finish Sat May 31 00:41:13 2008 > 19.11% done, estimate finish Sat May 31 00:41:17 2008 > 19.13% done, estimate finish Sat May 31 00:41:16 2008 > 19.15% done, estimate finish Sat May 31 00:41:15 2008 > 19.18% done, estimate finish Sat May 31 00:41:13 2008 > 19.20% done, estimate finish Sat May 31 00:41:12 2008 > 19.22% done, estimate finish Sat May 31 00:41:11 2008 > 19.24% done, estimate finish Sat May 31 00:41:15 2008 > 19.27% done, estimate finish Sat May 31 00:41:14 2008 > 19.29% done, estimate finish Sat May 31 00:41:13 2008 > 19.31% done, estimate finish Sat May 31 00:41:11 2008 > 19.33% done, estimate finish Sat May 31 00:41:10 2008 > 19.36% done, estimate finish Sat May 31 00:41:14 2008 > 19.38% done, estimate finish Sat May 31 00:41:13 2008 > 19.40% done, estimate finish Sat May 31 00:41:12 2008 > 19.43% done, estimate finish Sat May 31 00:41:11 2008 > 19.45% done, estimate finish Sat May 31 00:41:09 2008 > 19.47% done, estimate finish Sat May 31 00:41:08 2008 > 19.49% done, estimate finish Sat May 31 00:41:12 2008 > 19.52% done, estimate finish Sat May 31 00:41:11 2008 > 19.54% done, estimate finish Sat May 31 00:41:10 2008 > 19.56% done, estimate finish Sat May 31 00:41:09 2008 > 19.58% done, estimate finish Sat May 31 00:41:08 2008 > 19.61% done, estimate finish Sat May 31 00:41:11 2008 > 19.63% done, estimate finish Sat May 31 00:41:10 2008 > 19.65% done, estimate finish Sat May 31 00:41:09 2008 > 19.68% done, estimate finish Sat May 31 00:41:08 2008 > 19.70% done, estimate finish Sat May 31 00:41:07 2008 > 19.72% done, estimate finish Sat May 31 00:41:06 2008 > 19.74% done, estimate finish Sat May 31 00:41:10 2008 > 19.77% done, estimate finish Sat May 31 00:41:08 2008 > 19.79% done, estimate finish Sat May 31 00:41:07 2008 > 19.81% done, estimate finish Sat May 31 00:41:06 2008 > 19.83% done, estimate finish Sat May 31 00:41:05 2008 > 19.86% done, estimate finish Sat May 31 00:41:09 2008 > 19.88% done, estimate finish Sat May 31 00:41:08 2008 > 19.90% done, estimate finish Sat May 31 00:41:06 2008 > 19.92% done, estimate finish Sat May 31 00:41:05 2008 > 19.95% done, estimate finish Sat May 31 00:41:04 2008 > 19.97% done, estimate finish Sat May 31 00:41:08 2008 > 19.99% done, estimate finish Sat May 31 00:41:07 2008 > 20.02% done, estimate finish Sat May 31 00:41:06 2008 > 20.04% done, estimate finish Sat May 31 00:41:05 2008 > 20.06% done, estimate finish Sat May 31 00:41:03 2008 > 20.08% done, estimate finish Sat May 31 00:41:02 2008 > 20.11% done, estimate finish Sat May 31 00:41:06 2008 > 20.13% done, estimate finish Sat May 31 00:41:05 2008 > 20.15% done, estimate finish Sat May 31 00:41:04 2008 > 20.17% done, estimate finish Sat May 31 00:41:03 2008 > 20.20% done, estimate finish Sat May 31 00:41:02 2008 > 20.22% done, estimate finish Sat May 31 00:41:05 2008 > 20.24% done, estimate finish Sat May 31 00:41:04 2008 > 20.27% done, estimate finish Sat May 31 00:41:03 2008 > 20.29% done, estimate finish Sat May 31 00:41:02 2008 > 20.31% done, estimate finish Sat May 31 00:41:01 2008 > 20.33% done, estimate finish Sat May 31 00:41:00 2008 > 20.36% done, estimate finish Sat May 31 00:41:04 2008 > 20.38% done, estimate finish Sat May 31 00:41:02 2008 > 20.40% done, estimate finish Sat May 31 00:41:01 2008 > 20.42% done, estimate finish Sat May 31 00:41:00 2008 > 20.45% done, estimate finish Sat May 31 00:40:59 2008 > 20.47% done, estimate finish Sat May 31 00:41:03 2008 > 20.49% done, estimate finish Sat May 31 00:41:02 2008 > 20.52% done, estimate finish Sat May 31 00:41:01 2008 > 20.54% done, estimate finish Sat May 31 00:41:00 2008 > 20.56% done, estimate finish Sat May 31 00:40:58 2008 > 20.58% done, estimate finish Sat May 31 00:40:57 2008 > 20.61% done, estimate finish Sat May 31 00:41:01 2008 > 20.63% done, estimate finish Sat May 31 00:41:00 2008 > 20.65% done, estimate finish Sat May 31 00:40:59 2008 > 20.67% done, estimate finish Sat May 31 00:40:58 2008 > 20.70% done, estimate finish Sat May 31 00:40:57 2008 > 20.72% done, estimate finish Sat May 31 00:41:00 2008 > 20.74% done, estimate finish Sat May 31 00:40:59 2008 > 20.77% done, estimate finish Sat May 31 00:40:58 2008 > 20.79% done, estimate finish Sat May 31 00:40:57 2008 > 20.81% done, estimate finish Sat May 31 00:40:56 2008 > 20.83% done, estimate finish Sat May 31 00:40:55 2008 > 20.86% done, estimate finish Sat May 31 00:40:59 2008 > 20.88% done, estimate finish Sat May 31 00:40:57 2008 > 20.90% done, estimate finish Sat May 31 00:40:56 2008 > 20.92% done, estimate finish Sat May 31 00:40:55 2008 > 20.95% done, estimate finish Sat May 31 00:40:54 2008 > 20.97% done, estimate finish Sat May 31 00:40:58 2008 > 20.99% done, estimate finish Sat May 31 00:40:57 2008 > 21.02% done, estimate finish Sat May 31 00:40:56 2008 > 21.04% done, estimate finish Sat May 31 00:40:55 2008 > 21.06% done, estimate finish Sat May 31 00:40:54 2008 > 21.08% done, estimate finish Sat May 31 00:40:53 2008 > 21.11% done, estimate finish Sat May 31 00:40:56 2008 > 21.13% done, estimate finish Sat May 31 00:40:55 2008 > 21.15% done, estimate finish Sat May 31 00:40:54 2008 > 21.17% done, estimate finish Sat May 31 00:40:53 2008 > 21.20% done, estimate finish Sat May 31 00:40:52 2008 > 21.22% done, estimate finish Sat May 31 00:40:56 2008 > 21.24% done, estimate finish Sat May 31 00:40:54 2008 > 21.27% done, estimate finish Sat May 31 00:40:53 2008 > 21.29% done, estimate finish Sat May 31 00:40:52 2008 > 21.31% done, estimate finish Sat May 31 00:40:51 2008 > 21.33% done, estimate finish Sat May 31 00:40:55 2008 > 21.36% done, estimate finish Sat May 31 00:40:54 2008 > 21.38% done, estimate finish Sat May 31 00:40:53 2008 > 21.40% done, estimate finish Sat May 31 00:40:52 2008 > 21.42% done, estimate finish Sat May 31 00:40:51 2008 > 21.45% done, estimate finish Sat May 31 00:40:50 2008 > 21.47% done, estimate finish Sat May 31 00:40:53 2008 > 21.49% done, estimate finish Sat May 31 00:40:52 2008 > 21.52% done, estimate finish Sat May 31 00:40:51 2008 > 21.54% done, estimate finish Sat May 31 00:40:50 2008 > 21.56% done, estimate finish Sat May 31 00:40:49 2008 > 21.58% done, estimate finish Sat May 31 00:40:53 2008 > 21.61% done, estimate finish Sat May 31 00:40:52 2008 > 21.63% done, estimate finish Sat May 31 00:40:51 2008 > 21.65% done, estimate finish Sat May 31 00:40:50 2008 > 21.67% done, estimate finish Sat May 31 00:40:48 2008 > 21.70% done, estimate finish Sat May 31 00:40:47 2008 > 21.72% done, estimate finish Sat May 31 00:40:51 2008 > 21.74% done, estimate finish Sat May 31 00:40:50 2008 > 21.76% done, estimate finish Sat May 31 00:40:49 2008 > 21.79% done, estimate finish Sat May 31 00:40:48 2008 > 21.81% done, estimate finish Sat May 31 00:40:47 2008 > 21.83% done, estimate finish Sat May 31 00:40:50 2008 > 21.86% done, estimate finish Sat May 31 00:40:49 2008 > 21.88% done, estimate finish Sat May 31 00:40:48 2008 > 21.90% done, estimate finish Sat May 31 00:40:47 2008 > 21.92% done, estimate finish Sat May 31 00:40:46 2008 > 21.95% done, estimate finish Sat May 31 00:40:45 2008 > 21.97% done, estimate finish Sat May 31 00:40:49 2008 > 21.99% done, estimate finish Sat May 31 00:40:48 2008 > 22.01% done, estimate finish Sat May 31 00:40:47 2008 > 22.04% done, estimate finish Sat May 31 00:40:46 2008 > 22.06% done, estimate finish Sat May 31 00:40:45 2008 > 22.08% done, estimate finish Sat May 31 00:40:48 2008 > 22.11% done, estimate finish Sat May 31 00:40:52 2008 > 22.13% done, estimate finish Sat May 31 00:40:51 2008 > 22.15% done, estimate finish Sat May 31 00:40:50 2008 > 22.17% done, estimate finish Sat May 31 00:40:49 2008 > 22.20% done, estimate finish Sat May 31 00:40:48 2008 > 22.22% done, estimate finish Sat May 31 00:40:51 2008 > 22.24% done, estimate finish Sat May 31 00:40:50 2008 > 22.26% done, estimate finish Sat May 31 00:40:49 2008 > 22.29% done, estimate finish Sat May 31 00:40:48 2008 > 22.31% done, estimate finish Sat May 31 00:40:47 2008 > 22.33% done, estimate finish Sat May 31 00:40:51 2008 > 22.36% done, estimate finish Sat May 31 00:40:50 2008 > 22.38% done, estimate finish Sat May 31 00:40:49 2008 > 22.40% done, estimate finish Sat May 31 00:40:48 2008 > 22.42% done, estimate finish Sat May 31 00:40:47 2008 > 22.45% done, estimate finish Sat May 31 00:40:46 2008 > 22.47% done, estimate finish Sat May 31 00:40:49 2008 > 22.49% done, estimate finish Sat May 31 00:40:48 2008 > 22.52% done, estimate finish Sat May 31 00:40:47 2008 > 22.54% done, estimate finish Sat May 31 00:40:46 2008 > 22.56% done, estimate finish Sat May 31 00:40:45 2008 > 22.58% done, estimate finish Sat May 31 00:40:48 2008 > 22.61% done, estimate finish Sat May 31 00:40:47 2008 > 22.63% done, estimate finish Sat May 31 00:40:46 2008 > 22.65% done, estimate finish Sat May 31 00:40:45 2008 > 22.67% done, estimate finish Sat May 31 00:40:44 2008 > 22.70% done, estimate finish Sat May 31 00:40:43 2008 > 22.72% done, estimate finish Sat May 31 00:40:47 2008 > 22.74% done, estimate finish Sat May 31 00:40:46 2008 > 22.76% done, estimate finish Sat May 31 00:40:45 2008 > 22.79% done, estimate finish Sat May 31 00:40:44 2008 > 22.81% done, estimate finish Sat May 31 00:40:43 2008 > 22.83% done, estimate finish Sat May 31 00:40:46 2008 > 22.86% done, estimate finish Sat May 31 00:40:45 2008 > 22.88% done, estimate finish Sat May 31 00:40:44 2008 > 22.90% done, estimate finish Sat May 31 00:40:43 2008 > 22.92% done, estimate finish Sat May 31 00:40:42 2008 > 22.95% done, estimate finish Sat May 31 00:40:41 2008 > 22.97% done, estimate finish Sat May 31 00:40:45 2008 > 22.99% done, estimate finish Sat May 31 00:40:44 2008 > 23.01% done, estimate finish Sat May 31 00:40:43 2008 > 23.04% done, estimate finish Sat May 31 00:40:42 2008 > 23.06% done, estimate finish Sat May 31 00:40:41 2008 > 23.08% done, estimate finish Sat May 31 00:40:44 2008 > 23.11% done, estimate finish Sat May 31 00:40:43 2008 > 23.13% done, estimate finish Sat May 31 00:40:42 2008 > 23.15% done, estimate finish Sat May 31 00:40:41 2008 > 23.17% done, estimate finish Sat May 31 00:40:40 2008 > 23.20% done, estimate finish Sat May 31 00:40:39 2008 > 23.22% done, estimate finish Sat May 31 00:40:43 2008 > 23.24% done, estimate finish Sat May 31 00:40:42 2008 > 23.26% done, estimate finish Sat May 31 00:40:41 2008 > 23.29% done, estimate finish Sat May 31 00:40:40 2008 > 23.31% done, estimate finish Sat May 31 00:40:39 2008 > 23.33% done, estimate finish Sat May 31 00:40:42 2008 > 23.36% done, estimate finish Sat May 31 00:40:41 2008 > 23.38% done, estimate finish Sat May 31 00:40:40 2008 > 23.40% done, estimate finish Sat May 31 00:40:39 2008 > 23.42% done, estimate finish Sat May 31 00:40:38 2008 > 23.45% done, estimate finish Sat May 31 00:40:42 2008 > 23.47% done, estimate finish Sat May 31 00:40:41 2008 > 23.49% done, estimate finish Sat May 31 00:40:40 2008 > 23.51% done, estimate finish Sat May 31 00:40:39 2008 > 23.54% done, estimate finish Sat May 31 00:40:38 2008 > 23.56% done, estimate finish Sat May 31 00:40:37 2008 > 23.58% done, estimate finish Sat May 31 00:40:40 2008 > 23.61% done, estimate finish Sat May 31 00:40:39 2008 > 23.63% done, estimate finish Sat May 31 00:40:38 2008 > 23.65% done, estimate finish Sat May 31 00:40:37 2008 > 23.67% done, estimate finish Sat May 31 00:40:36 2008 > 23.70% done, estimate finish Sat May 31 00:40:40 2008 > 23.72% done, estimate finish Sat May 31 00:40:39 2008 > 23.74% done, estimate finish Sat May 31 00:40:38 2008 > 23.76% done, estimate finish Sat May 31 00:40:37 2008 > 23.79% done, estimate finish Sat May 31 00:40:36 2008 > 23.81% done, estimate finish Sat May 31 00:40:35 2008 > 23.83% done, estimate finish Sat May 31 00:40:38 2008 > 23.86% done, estimate finish Sat May 31 00:40:37 2008 > 23.88% done, estimate finish Sat May 31 00:40:36 2008 > 23.90% done, estimate finish Sat May 31 00:40:36 2008 > 23.92% done, estimate finish Sat May 31 00:40:35 2008 > 23.95% done, estimate finish Sat May 31 00:40:38 2008 > 23.97% done, estimate finish Sat May 31 00:40:37 2008 > 23.99% done, estimate finish Sat May 31 00:40:36 2008 > 24.01% done, estimate finish Sat May 31 00:40:35 2008 > 24.04% done, estimate finish Sat May 31 00:40:34 2008 > 24.06% done, estimate finish Sat May 31 00:40:33 2008 > 24.08% done, estimate finish Sat May 31 00:40:36 2008 > 24.11% done, estimate finish Sat May 31 00:40:36 2008 > 24.13% done, estimate finish Sat May 31 00:40:35 2008 > 24.15% done, estimate finish Sat May 31 00:40:34 2008 > 24.17% done, estimate finish Sat May 31 00:40:33 2008 > 24.20% done, estimate finish Sat May 31 00:40:36 2008 > 24.22% done, estimate finish Sat May 31 00:40:35 2008 > 24.24% done, estimate finish Sat May 31 00:40:34 2008 > 24.26% done, estimate finish Sat May 31 00:40:33 2008 > 24.29% done, estimate finish Sat May 31 00:40:32 2008 > 24.31% done, estimate finish Sat May 31 00:40:31 2008 > 24.33% done, estimate finish Sat May 31 00:40:35 2008 > 24.36% done, estimate finish Sat May 31 00:40:34 2008 > 24.38% done, estimate finish Sat May 31 00:40:33 2008 > 24.40% done, estimate finish Sat May 31 00:40:32 2008 > 24.42% done, estimate finish Sat May 31 00:40:31 2008 > 24.45% done, estimate finish Sat May 31 00:40:34 2008 > 24.47% done, estimate finish Sat May 31 00:40:33 2008 > 24.49% done, estimate finish Sat May 31 00:40:32 2008 > 24.51% done, estimate finish Sat May 31 00:40:31 2008 > 24.54% done, estimate finish Sat May 31 00:40:31 2008 > 24.56% done, estimate finish Sat May 31 00:40:34 2008 > 24.58% done, estimate finish Sat May 31 00:40:33 2008 > 24.60% done, estimate finish Sat May 31 00:40:32 2008 > 24.63% done, estimate finish Sat May 31 00:40:31 2008 > 24.65% done, estimate finish Sat May 31 00:40:30 2008 > 24.67% done, estimate finish Sat May 31 00:40:29 2008 > 24.70% done, estimate finish Sat May 31 00:40:32 2008 > 24.72% done, estimate finish Sat May 31 00:40:31 2008 > 24.74% done, estimate finish Sat May 31 00:40:31 2008 > 24.76% done, estimate finish Sat May 31 00:40:30 2008 > 24.79% done, estimate finish Sat May 31 00:40:29 2008 > 24.81% done, estimate finish Sat May 31 00:40:32 2008 > 24.83% done, estimate finish Sat May 31 00:40:31 2008 > 24.85% done, estimate finish Sat May 31 00:40:30 2008 > 24.88% done, estimate finish Sat May 31 00:40:29 2008 > 24.90% done, estimate finish Sat May 31 00:40:28 2008 > 24.92% done, estimate finish Sat May 31 00:40:27 2008 > 24.95% done, estimate finish Sat May 31 00:40:31 2008 > 24.97% done, estimate finish Sat May 31 00:40:30 2008 > 24.99% done, estimate finish Sat May 31 00:40:29 2008 > 25.01% done, estimate finish Sat May 31 00:40:28 2008 > 25.04% done, estimate finish Sat May 31 00:40:27 2008 > 25.06% done, estimate finish Sat May 31 00:40:30 2008 > 25.08% done, estimate finish Sat May 31 00:40:29 2008 > 25.10% done, estimate finish Sat May 31 00:40:28 2008 > 25.13% done, estimate finish Sat May 31 00:40:28 2008 > 25.15% done, estimate finish Sat May 31 00:40:27 2008 > 25.17% done, estimate finish Sat May 31 00:40:26 2008 > 25.20% done, estimate finish Sat May 31 00:40:29 2008 > 25.22% done, estimate finish Sat May 31 00:40:28 2008 > 25.24% done, estimate finish Sat May 31 00:40:27 2008 > 25.26% done, estimate finish Sat May 31 00:40:26 2008 > 25.29% done, estimate finish Sat May 31 00:40:25 2008 > 25.31% done, estimate finish Sat May 31 00:40:28 2008 > 25.33% done, estimate finish Sat May 31 00:40:28 2008 > 25.36% done, estimate finish Sat May 31 00:40:27 2008 > 25.38% done, estimate finish Sat May 31 00:40:26 2008 > 25.40% done, estimate finish Sat May 31 00:40:25 2008 > 25.42% done, estimate finish Sat May 31 00:40:24 2008 > 25.45% done, estimate finish Sat May 31 00:40:27 2008 > 25.47% done, estimate finish Sat May 31 00:40:26 2008 > 25.49% done, estimate finish Sat May 31 00:40:25 2008 > 25.51% done, estimate finish Sat May 31 00:40:25 2008 > 25.54% done, estimate finish Sat May 31 00:40:24 2008 > 25.56% done, estimate finish Sat May 31 00:40:27 2008 > 25.58% done, estimate finish Sat May 31 00:40:26 2008 > 25.60% done, estimate finish Sat May 31 00:40:25 2008 > 25.63% done, estimate finish Sat May 31 00:40:24 2008 > 25.65% done, estimate finish Sat May 31 00:40:23 2008 > 25.67% done, estimate finish Sat May 31 00:40:23 2008 > 25.70% done, estimate finish Sat May 31 00:40:26 2008 > 25.72% done, estimate finish Sat May 31 00:40:25 2008 > 25.74% done, estimate finish Sat May 31 00:40:24 2008 > 25.76% done, estimate finish Sat May 31 00:40:23 2008 > 25.79% done, estimate finish Sat May 31 00:40:22 2008 > 25.81% done, estimate finish Sat May 31 00:40:25 2008 > 25.83% done, estimate finish Sat May 31 00:40:24 2008 > 25.85% done, estimate finish Sat May 31 00:40:23 2008 > 25.88% done, estimate finish Sat May 31 00:40:23 2008 > 25.90% done, estimate finish Sat May 31 00:40:22 2008 > 25.92% done, estimate finish Sat May 31 00:40:25 2008 > 25.95% done, estimate finish Sat May 31 00:40:24 2008 > 25.97% done, estimate finish Sat May 31 00:40:23 2008 > 25.99% done, estimate finish Sat May 31 00:40:22 2008 > 26.01% done, estimate finish Sat May 31 00:40:21 2008 > 26.04% done, estimate finish Sat May 31 00:40:21 2008 > 26.06% done, estimate finish Sat May 31 00:40:24 2008 > 26.08% done, estimate finish Sat May 31 00:40:23 2008 > 26.10% done, estimate finish Sat May 31 00:40:22 2008 > 26.13% done, estimate finish Sat May 31 00:40:21 2008 > 26.15% done, estimate finish Sat May 31 00:40:20 2008 > 26.17% done, estimate finish Sat May 31 00:40:23 2008 > 26.20% done, estimate finish Sat May 31 00:40:22 2008 > 26.22% done, estimate finish Sat May 31 00:40:21 2008 > 26.24% done, estimate finish Sat May 31 00:40:21 2008 > 26.26% done, estimate finish Sat May 31 00:40:20 2008 > 26.29% done, estimate finish Sat May 31 00:40:19 2008 > 26.31% done, estimate finish Sat May 31 00:40:22 2008 > 26.33% done, estimate finish Sat May 31 00:40:21 2008 > 26.35% done, estimate finish Sat May 31 00:40:20 2008 > 26.38% done, estimate finish Sat May 31 00:40:19 2008 > 26.40% done, estimate finish Sat May 31 00:40:19 2008 > 26.42% done, estimate finish Sat May 31 00:40:22 2008 > 26.45% done, estimate finish Sat May 31 00:40:21 2008 > 26.47% done, estimate finish Sat May 31 00:40:20 2008 > 26.49% done, estimate finish Sat May 31 00:40:19 2008 > 26.51% done, estimate finish Sat May 31 00:40:18 2008 > 26.54% done, estimate finish Sat May 31 00:40:17 2008 > 26.56% done, estimate finish Sat May 31 00:40:20 2008 > 26.58% done, estimate finish Sat May 31 00:40:20 2008 > 26.60% done, estimate finish Sat May 31 00:40:19 2008 > 26.63% done, estimate finish Sat May 31 00:40:18 2008 > 26.65% done, estimate finish Sat May 31 00:40:17 2008 > 26.67% done, estimate finish Sat May 31 00:40:20 2008 > 26.70% done, estimate finish Sat May 31 00:40:19 2008 > 26.72% done, estimate finish Sat May 31 00:40:18 2008 > 26.74% done, estimate finish Sat May 31 00:40:18 2008 > 26.76% done, estimate finish Sat May 31 00:40:17 2008 > 26.79% done, estimate finish Sat May 31 00:40:16 2008 > 26.81% done, estimate finish Sat May 31 00:40:19 2008 > 26.83% done, estimate finish Sat May 31 00:40:18 2008 > 26.85% done, estimate finish Sat May 31 00:40:17 2008 > 26.88% done, estimate finish Sat May 31 00:40:16 2008 > 26.90% done, estimate finish Sat May 31 00:40:16 2008 > 26.92% done, estimate finish Sat May 31 00:40:19 2008 > 26.94% done, estimate finish Sat May 31 00:40:18 2008 > 26.97% done, estimate finish Sat May 31 00:40:17 2008 > 26.99% done, estimate finish Sat May 31 00:40:16 2008 > 27.01% done, estimate finish Sat May 31 00:40:15 2008 > 27.04% done, estimate finish Sat May 31 00:40:18 2008 > 27.06% done, estimate finish Sat May 31 00:40:17 2008 > 27.08% done, estimate finish Sat May 31 00:40:17 2008 > 27.10% done, estimate finish Sat May 31 00:40:16 2008 > 27.13% done, estimate finish Sat May 31 00:40:15 2008 > 27.15% done, estimate finish Sat May 31 00:40:14 2008 > 27.17% done, estimate finish Sat May 31 00:40:17 2008 > 27.19% done, estimate finish Sat May 31 00:40:16 2008 > 27.22% done, estimate finish Sat May 31 00:40:15 2008 > 27.24% done, estimate finish Sat May 31 00:40:15 2008 > 27.26% done, estimate finish Sat May 31 00:40:14 2008 > 27.29% done, estimate finish Sat May 31 00:40:17 2008 > 27.31% done, estimate finish Sat May 31 00:40:16 2008 > 27.33% done, estimate finish Sat May 31 00:40:15 2008 > 27.35% done, estimate finish Sat May 31 00:40:14 2008 > 27.38% done, estimate finish Sat May 31 00:40:14 2008 > 27.40% done, estimate finish Sat May 31 00:40:13 2008 > 27.42% done, estimate finish Sat May 31 00:40:16 2008 > 27.44% done, estimate finish Sat May 31 00:40:15 2008 > 27.47% done, estimate finish Sat May 31 00:40:14 2008 > 27.49% done, estimate finish Sat May 31 00:40:13 2008 > 27.51% done, estimate finish Sat May 31 00:40:12 2008 > 27.54% done, estimate finish Sat May 31 00:40:15 2008 > 27.56% done, estimate finish Sat May 31 00:40:14 2008 > 27.58% done, estimate finish Sat May 31 00:40:14 2008 > 27.60% done, estimate finish Sat May 31 00:40:13 2008 > 27.63% done, estimate finish Sat May 31 00:40:12 2008 > 27.65% done, estimate finish Sat May 31 00:40:11 2008 > 27.67% done, estimate finish Sat May 31 00:40:14 2008 > 27.69% done, estimate finish Sat May 31 00:40:13 2008 > 27.72% done, estimate finish Sat May 31 00:40:13 2008 > 27.74% done, estimate finish Sat May 31 00:40:12 2008 > 27.76% done, estimate finish Sat May 31 00:40:11 2008 > 27.79% done, estimate finish Sat May 31 00:40:14 2008 > 27.81% done, estimate finish Sat May 31 00:40:13 2008 > 27.83% done, estimate finish Sat May 31 00:40:12 2008 > 27.85% done, estimate finish Sat May 31 00:40:11 2008 > 27.88% done, estimate finish Sat May 31 00:40:11 2008 > 27.90% done, estimate finish Sat May 31 00:40:10 2008 > 27.92% done, estimate finish Sat May 31 00:40:13 2008 > 27.94% done, estimate finish Sat May 31 00:40:12 2008 > 27.97% done, estimate finish Sat May 31 00:40:11 2008 > 27.99% done, estimate finish Sat May 31 00:40:10 2008 > 28.01% done, estimate finish Sat May 31 00:40:10 2008 > 28.04% done, estimate finish Sat May 31 00:40:12 2008 > 28.06% done, estimate finish Sat May 31 00:40:12 2008 > 28.08% done, estimate finish Sat May 31 00:40:11 2008 > 28.10% done, estimate finish Sat May 31 00:40:10 2008 > 28.13% done, estimate finish Sat May 31 00:40:09 2008 > 28.15% done, estimate finish Sat May 31 00:40:09 2008 > 28.17% done, estimate finish Sat May 31 00:40:11 2008 > 28.19% done, estimate finish Sat May 31 00:40:11 2008 > 28.22% done, estimate finish Sat May 31 00:40:10 2008 > 28.24% done, estimate finish Sat May 31 00:40:09 2008 > 28.26% done, estimate finish Sat May 31 00:40:08 2008 > 28.29% done, estimate finish Sat May 31 00:40:11 2008 > 28.31% done, estimate finish Sat May 31 00:40:10 2008 > 28.33% done, estimate finish Sat May 31 00:40:10 2008 > 28.35% done, estimate finish Sat May 31 00:40:09 2008 > 28.38% done, estimate finish Sat May 31 00:40:08 2008 > 28.40% done, estimate finish Sat May 31 00:40:11 2008 > 28.42% done, estimate finish Sat May 31 00:40:10 2008 > 28.44% done, estimate finish Sat May 31 00:40:09 2008 > 28.47% done, estimate finish Sat May 31 00:40:08 2008 > 28.49% done, estimate finish Sat May 31 00:40:08 2008 > 28.51% done, estimate finish Sat May 31 00:40:07 2008 > 28.54% done, estimate finish Sat May 31 00:40:10 2008 > 28.56% done, estimate finish Sat May 31 00:40:09 2008 > 28.58% done, estimate finish Sat May 31 00:40:08 2008 > 28.60% done, estimate finish Sat May 31 00:40:07 2008 > 28.63% done, estimate finish Sat May 31 00:40:07 2008 > 28.65% done, estimate finish Sat May 31 00:40:09 2008 > 28.67% done, estimate finish Sat May 31 00:40:09 2008 > 28.69% done, estimate finish Sat May 31 00:40:08 2008 > 28.72% done, estimate finish Sat May 31 00:40:07 2008 > 28.74% done, estimate finish Sat May 31 00:40:06 2008 > 28.76% done, estimate finish Sat May 31 00:40:06 2008 > 28.79% done, estimate finish Sat May 31 00:40:08 2008 > 28.81% done, estimate finish Sat May 31 00:40:08 2008 > 28.83% done, estimate finish Sat May 31 00:40:07 2008 > 28.85% done, estimate finish Sat May 31 00:40:06 2008 > 28.88% done, estimate finish Sat May 31 00:40:05 2008 > 28.90% done, estimate finish Sat May 31 00:40:08 2008 > 28.92% done, estimate finish Sat May 31 00:40:07 2008 > 28.94% done, estimate finish Sat May 31 00:40:07 2008 > 28.97% done, estimate finish Sat May 31 00:40:06 2008 > 28.99% done, estimate finish Sat May 31 00:40:09 2008 > 29.01% done, estimate finish Sat May 31 00:40:08 2008 > 29.04% done, estimate finish Sat May 31 00:40:11 2008 > 29.06% done, estimate finish Sat May 31 00:40:10 2008 > 29.08% done, estimate finish Sat May 31 00:40:09 2008 > 29.10% done, estimate finish Sat May 31 00:40:08 2008 > 29.13% done, estimate finish Sat May 31 00:40:08 2008 > 29.15% done, estimate finish Sat May 31 00:40:10 2008 > 29.17% done, estimate finish Sat May 31 00:40:09 2008 > 29.19% done, estimate finish Sat May 31 00:40:09 2008 > 29.22% done, estimate finish Sat May 31 00:40:08 2008 > 29.24% done, estimate finish Sat May 31 00:40:07 2008 > 29.26% done, estimate finish Sat May 31 00:40:07 2008 > 29.29% done, estimate finish Sat May 31 00:40:09 2008 > 29.31% done, estimate finish Sat May 31 00:40:08 2008 > 29.33% done, estimate finish Sat May 31 00:40:08 2008 > 29.35% done, estimate finish Sat May 31 00:40:07 2008 > 29.38% done, estimate finish Sat May 31 00:40:06 2008 > 29.40% done, estimate finish Sat May 31 00:40:06 2008 > 29.42% done, estimate finish Sat May 31 00:40:08 2008 > 29.44% done, estimate finish Sat May 31 00:40:07 2008 > 29.47% done, estimate finish Sat May 31 00:40:07 2008 > 29.49% done, estimate finish Sat May 31 00:40:06 2008 > 29.51% done, estimate finish Sat May 31 00:40:05 2008 > 29.54% done, estimate finish Sat May 31 00:40:08 2008 > 29.56% done, estimate finish Sat May 31 00:40:07 2008 > 29.58% done, estimate finish Sat May 31 00:40:06 2008 > 29.60% done, estimate finish Sat May 31 00:40:06 2008 > 29.63% done, estimate finish Sat May 31 00:40:05 2008 > 29.65% done, estimate finish Sat May 31 00:40:08 2008 > 29.67% done, estimate finish Sat May 31 00:40:07 2008 > 29.69% done, estimate finish Sat May 31 00:40:06 2008 > 29.72% done, estimate finish Sat May 31 00:40:05 2008 > 29.74% done, estimate finish Sat May 31 00:40:05 2008 > 29.76% done, estimate finish Sat May 31 00:40:04 2008 > 29.79% done, estimate finish Sat May 31 00:40:07 2008 > 29.81% done, estimate finish Sat May 31 00:40:06 2008 > 29.83% done, estimate finish Sat May 31 00:40:05 2008 > 29.85% done, estimate finish Sat May 31 00:40:04 2008 > 29.88% done, estimate finish Sat May 31 00:40:04 2008 > 29.90% done, estimate finish Sat May 31 00:40:06 2008 > 29.92% done, estimate finish Sat May 31 00:40:06 2008 > 29.94% done, estimate finish Sat May 31 00:40:05 2008 > 29.97% done, estimate finish Sat May 31 00:40:04 2008 > 29.99% done, estimate finish Sat May 31 00:40:04 2008 > 30.01% done, estimate finish Sat May 31 00:40:03 2008 > 30.03% done, estimate finish Sat May 31 00:40:05 2008 > 30.06% done, estimate finish Sat May 31 00:40:05 2008 > 30.08% done, estimate finish Sat May 31 00:40:04 2008 > 30.10% done, estimate finish Sat May 31 00:40:03 2008 > 30.13% done, estimate finish Sat May 31 00:40:03 2008 > 30.15% done, estimate finish Sat May 31 00:40:05 2008 > 30.17% done, estimate finish Sat May 31 00:40:04 2008 > 30.19% done, estimate finish Sat May 31 00:40:04 2008 > 30.22% done, estimate finish Sat May 31 00:40:03 2008 > 30.24% done, estimate finish Sat May 31 00:40:02 2008 > 30.26% done, estimate finish Sat May 31 00:40:05 2008 > 30.28% done, estimate finish Sat May 31 00:40:04 2008 > 30.31% done, estimate finish Sat May 31 00:40:03 2008 > 30.33% done, estimate finish Sat May 31 00:40:03 2008 > 30.35% done, estimate finish Sat May 31 00:40:02 2008 > 30.38% done, estimate finish Sat May 31 00:40:01 2008 > 30.40% done, estimate finish Sat May 31 00:40:04 2008 > 30.42% done, estimate finish Sat May 31 00:40:03 2008 > 30.44% done, estimate finish Sat May 31 00:40:03 2008 > 30.47% done, estimate finish Sat May 31 00:40:02 2008 > 30.49% done, estimate finish Sat May 31 00:40:01 2008 > 30.51% done, estimate finish Sat May 31 00:40:00 2008 > 30.53% done, estimate finish Sat May 31 00:40:03 2008 > 30.56% done, estimate finish Sat May 31 00:40:02 2008 > 30.58% done, estimate finish Sat May 31 00:40:02 2008 > 30.60% done, estimate finish Sat May 31 00:40:01 2008 > 30.63% done, estimate finish Sat May 31 00:40:00 2008 > 30.65% done, estimate finish Sat May 31 00:40:03 2008 > 30.67% done, estimate finish Sat May 31 00:40:02 2008 > 30.69% done, estimate finish Sat May 31 00:40:01 2008 > 30.72% done, estimate finish Sat May 31 00:40:01 2008 > 30.74% done, estimate finish Sat May 31 00:40:00 2008 > 30.76% done, estimate finish Sat May 31 00:40:02 2008 > 30.78% done, estimate finish Sat May 31 00:40:02 2008 > 30.81% done, estimate finish Sat May 31 00:40:01 2008 > 30.83% done, estimate finish Sat May 31 00:40:00 2008 > 30.85% done, estimate finish Sat May 31 00:40:00 2008 > 30.88% done, estimate finish Sat May 31 00:39:59 2008 > 30.90% done, estimate finish Sat May 31 00:40:02 2008 > 30.92% done, estimate finish Sat May 31 00:40:01 2008 > 30.94% done, estimate finish Sat May 31 00:40:00 2008 > 30.97% done, estimate finish Sat May 31 00:39:59 2008 > 30.99% done, estimate finish Sat May 31 00:39:59 2008 > 31.01% done, estimate finish Sat May 31 00:40:01 2008 > 31.03% done, estimate finish Sat May 31 00:40:01 2008 > 31.06% done, estimate finish Sat May 31 00:40:00 2008 > 31.08% done, estimate finish Sat May 31 00:39:59 2008 > 31.10% done, estimate finish Sat May 31 00:39:59 2008 > 31.13% done, estimate finish Sat May 31 00:39:58 2008 > 31.15% done, estimate finish Sat May 31 00:40:00 2008 > 31.17% done, estimate finish Sat May 31 00:40:00 2008 > 31.19% done, estimate finish Sat May 31 00:39:59 2008 > 31.22% done, estimate finish Sat May 31 00:39:58 2008 > 31.24% done, estimate finish Sat May 31 00:39:58 2008 > 31.26% done, estimate finish Sat May 31 00:40:00 2008 > 31.28% done, estimate finish Sat May 31 00:39:59 2008 > 31.31% done, estimate finish Sat May 31 00:39:59 2008 > 31.33% done, estimate finish Sat May 31 00:39:58 2008 > 31.35% done, estimate finish Sat May 31 00:39:57 2008 > 31.37% done, estimate finish Sat May 31 00:39:57 2008 > 31.40% done, estimate finish Sat May 31 00:39:59 2008 > 31.42% done, estimate finish Sat May 31 00:39:59 2008 > 31.44% done, estimate finish Sat May 31 00:39:58 2008 > 31.47% done, estimate finish Sat May 31 00:39:57 2008 > 31.49% done, estimate finish Sat May 31 00:39:57 2008 > 31.51% done, estimate finish Sat May 31 00:39:59 2008 > 31.53% done, estimate finish Sat May 31 00:39:58 2008 > 31.56% done, estimate finish Sat May 31 00:39:58 2008 > 31.58% done, estimate finish Sat May 31 00:39:57 2008 > 31.60% done, estimate finish Sat May 31 00:39:56 2008 > 31.62% done, estimate finish Sat May 31 00:39:56 2008 > 31.65% done, estimate finish Sat May 31 00:39:58 2008 > 31.67% done, estimate finish Sat May 31 00:39:57 2008 > 31.69% done, estimate finish Sat May 31 00:39:57 2008 > 31.72% done, estimate finish Sat May 31 00:39:56 2008 > 31.74% done, estimate finish Sat May 31 00:39:55 2008 > 31.76% done, estimate finish Sat May 31 00:39:58 2008 > 31.78% done, estimate finish Sat May 31 00:39:57 2008 > 31.81% done, estimate finish Sat May 31 00:39:57 2008 > 31.83% done, estimate finish Sat May 31 00:39:56 2008 > 31.85% done, estimate finish Sat May 31 00:39:55 2008 > 31.88% done, estimate finish Sat May 31 00:39:58 2008 > 31.90% done, estimate finish Sat May 31 00:39:57 2008 > 31.92% done, estimate finish Sat May 31 00:39:56 2008 > 31.94% done, estimate finish Sat May 31 00:39:56 2008 > 31.97% done, estimate finish Sat May 31 00:39:55 2008 > 31.99% done, estimate finish Sat May 31 00:39:54 2008 > 32.01% done, estimate finish Sat May 31 00:39:57 2008 > 32.03% done, estimate finish Sat May 31 00:39:56 2008 > 32.06% done, estimate finish Sat May 31 00:39:55 2008 > 32.08% done, estimate finish Sat May 31 00:39:55 2008 > 32.10% done, estimate finish Sat May 31 00:39:54 2008 > 32.12% done, estimate finish Sat May 31 00:39:57 2008 > 32.15% done, estimate finish Sat May 31 00:39:56 2008 > 32.17% done, estimate finish Sat May 31 00:39:55 2008 > 32.19% done, estimate finish Sat May 31 00:39:55 2008 > 32.22% done, estimate finish Sat May 31 00:39:54 2008 > 32.24% done, estimate finish Sat May 31 00:39:53 2008 > 32.26% done, estimate finish Sat May 31 00:39:56 2008 > 32.28% done, estimate finish Sat May 31 00:39:55 2008 > 32.31% done, estimate finish Sat May 31 00:39:54 2008 > 32.33% done, estimate finish Sat May 31 00:39:54 2008 > 32.35% done, estimate finish Sat May 31 00:39:53 2008 > 32.37% done, estimate finish Sat May 31 00:39:56 2008 > 32.40% done, estimate finish Sat May 31 00:39:55 2008 > 32.42% done, estimate finish Sat May 31 00:39:54 2008 > 32.44% done, estimate finish Sat May 31 00:39:54 2008 > 32.47% done, estimate finish Sat May 31 00:39:53 2008 > 32.49% done, estimate finish Sat May 31 00:39:52 2008 > 32.51% done, estimate finish Sat May 31 00:39:55 2008 > 32.53% done, estimate finish Sat May 31 00:39:54 2008 > 32.56% done, estimate finish Sat May 31 00:39:53 2008 > 32.58% done, estimate finish Sat May 31 00:39:53 2008 > 32.60% done, estimate finish Sat May 31 00:39:52 2008 > 32.62% done, estimate finish Sat May 31 00:39:54 2008 > 32.65% done, estimate finish Sat May 31 00:39:54 2008 > 32.67% done, estimate finish Sat May 31 00:39:53 2008 > 32.69% done, estimate finish Sat May 31 00:39:52 2008 > 32.72% done, estimate finish Sat May 31 00:39:52 2008 > 32.74% done, estimate finish Sat May 31 00:39:51 2008 > 32.76% done, estimate finish Sat May 31 00:39:54 2008 > 32.78% done, estimate finish Sat May 31 00:39:53 2008 > 32.81% done, estimate finish Sat May 31 00:39:52 2008 > 32.83% done, estimate finish Sat May 31 00:39:52 2008 > 32.85% done, estimate finish Sat May 31 00:39:51 2008 > 32.87% done, estimate finish Sat May 31 00:39:53 2008 > 32.90% done, estimate finish Sat May 31 00:39:53 2008 > 32.92% done, estimate finish Sat May 31 00:39:52 2008 > 32.94% done, estimate finish Sat May 31 00:39:51 2008 > 32.97% done, estimate finish Sat May 31 00:39:51 2008 > 32.99% done, estimate finish Sat May 31 00:39:50 2008 > 33.01% done, estimate finish Sat May 31 00:39:53 2008 > 33.03% done, estimate finish Sat May 31 00:39:52 2008 > 33.06% done, estimate finish Sat May 31 00:39:51 2008 > 33.08% done, estimate finish Sat May 31 00:39:51 2008 > 33.10% done, estimate finish Sat May 31 00:39:50 2008 > 33.12% done, estimate finish Sat May 31 00:39:52 2008 > 33.15% done, estimate finish Sat May 31 00:39:52 2008 > 33.17% done, estimate finish Sat May 31 00:39:51 2008 > 33.19% done, estimate finish Sat May 31 00:39:50 2008 > 33.22% done, estimate finish Sat May 31 00:39:50 2008 > 33.24% done, estimate finish Sat May 31 00:39:52 2008 > 33.26% done, estimate finish Sat May 31 00:39:52 2008 > 33.28% done, estimate finish Sat May 31 00:39:51 2008 > 33.31% done, estimate finish Sat May 31 00:39:50 2008 > 33.33% done, estimate finish Sat May 31 00:39:50 2008 > 33.35% done, estimate finish Sat May 31 00:39:49 2008 > 33.37% done, estimate finish Sat May 31 00:39:51 2008 > 33.40% done, estimate finish Sat May 31 00:39:51 2008 > 33.42% done, estimate finish Sat May 31 00:39:50 2008 > 33.44% done, estimate finish Sat May 31 00:39:49 2008 > 33.47% done, estimate finish Sat May 31 00:39:49 2008 > 33.49% done, estimate finish Sat May 31 00:39:51 2008 > 33.51% done, estimate finish Sat May 31 00:39:51 2008 > 33.53% done, estimate finish Sat May 31 00:39:50 2008 > 33.56% done, estimate finish Sat May 31 00:39:49 2008 > 33.58% done, estimate finish Sat May 31 00:39:49 2008 > 33.60% done, estimate finish Sat May 31 00:39:48 2008 > 33.62% done, estimate finish Sat May 31 00:39:50 2008 > 33.65% done, estimate finish Sat May 31 00:39:50 2008 > 33.67% done, estimate finish Sat May 31 00:39:49 2008 > 33.69% done, estimate finish Sat May 31 00:39:48 2008 > 33.71% done, estimate finish Sat May 31 00:39:48 2008 > 33.74% done, estimate finish Sat May 31 00:39:50 2008 > 33.76% done, estimate finish Sat May 31 00:39:50 2008 > 33.78% done, estimate finish Sat May 31 00:39:49 2008 > 33.81% done, estimate finish Sat May 31 00:39:48 2008 > 33.83% done, estimate finish Sat May 31 00:39:48 2008 > 33.85% done, estimate finish Sat May 31 00:39:47 2008 > 33.87% done, estimate finish Sat May 31 00:39:49 2008 > 33.90% done, estimate finish Sat May 31 00:39:49 2008 > 33.92% done, estimate finish Sat May 31 00:39:48 2008 > 33.94% done, estimate finish Sat May 31 00:39:47 2008 > 33.97% done, estimate finish Sat May 31 00:39:47 2008 > 33.99% done, estimate finish Sat May 31 00:39:49 2008 > 34.01% done, estimate finish Sat May 31 00:39:49 2008 > 34.03% done, estimate finish Sat May 31 00:39:48 2008 > 34.06% done, estimate finish Sat May 31 00:39:47 2008 > 34.08% done, estimate finish Sat May 31 00:39:47 2008 > 34.10% done, estimate finish Sat May 31 00:39:46 2008 > 34.12% done, estimate finish Sat May 31 00:39:48 2008 > 34.15% done, estimate finish Sat May 31 00:39:48 2008 > 34.17% done, estimate finish Sat May 31 00:39:47 2008 > 34.19% done, estimate finish Sat May 31 00:39:47 2008 > 34.21% done, estimate finish Sat May 31 00:39:46 2008 > 34.24% done, estimate finish Sat May 31 00:39:48 2008 > 34.26% done, estimate finish Sat May 31 00:39:48 2008 > 34.28% done, estimate finish Sat May 31 00:39:47 2008 > 34.31% done, estimate finish Sat May 31 00:39:46 2008 > 34.33% done, estimate finish Sat May 31 00:39:46 2008 > 34.35% done, estimate finish Sat May 31 00:39:48 2008 > 34.37% done, estimate finish Sat May 31 00:39:47 2008 > 34.40% done, estimate finish Sat May 31 00:39:47 2008 > 34.42% done, estimate finish Sat May 31 00:39:46 2008 > 34.44% done, estimate finish Sat May 31 00:39:46 2008 > 34.46% done, estimate finish Sat May 31 00:39:45 2008 > 34.49% done, estimate finish Sat May 31 00:39:47 2008 > 34.51% done, estimate finish Sat May 31 00:39:47 2008 > 34.53% done, estimate finish Sat May 31 00:39:46 2008 > 34.56% done, estimate finish Sat May 31 00:39:45 2008 > 34.58% done, estimate finish Sat May 31 00:39:45 2008 > 34.60% done, estimate finish Sat May 31 00:39:47 2008 > 34.62% done, estimate finish Sat May 31 00:39:46 2008 > 34.65% done, estimate finish Sat May 31 00:39:46 2008 > 34.67% done, estimate finish Sat May 31 00:39:45 2008 > 34.69% done, estimate finish Sat May 31 00:39:45 2008 > 34.71% done, estimate finish Sat May 31 00:39:44 2008 > 34.74% done, estimate finish Sat May 31 00:39:46 2008 > 34.76% done, estimate finish Sat May 31 00:39:46 2008 > 34.78% done, estimate finish Sat May 31 00:39:45 2008 > 34.81% done, estimate finish Sat May 31 00:39:45 2008 > 34.83% done, estimate finish Sat May 31 00:39:44 2008 > 34.85% done, estimate finish Sat May 31 00:39:46 2008 > 34.87% done, estimate finish Sat May 31 00:39:46 2008 > 34.90% done, estimate finish Sat May 31 00:39:45 2008 > 34.92% done, estimate finish Sat May 31 00:39:44 2008 > 34.94% done, estimate finish Sat May 31 00:39:44 2008 > 34.96% done, estimate finish Sat May 31 00:39:43 2008 > 34.99% done, estimate finish Sat May 31 00:39:45 2008 > 35.01% done, estimate finish Sat May 31 00:39:45 2008 > 35.03% done, estimate finish Sat May 31 00:39:44 2008 > 35.06% done, estimate finish Sat May 31 00:39:44 2008 > 35.08% done, estimate finish Sat May 31 00:39:43 2008 > 35.10% done, estimate finish Sat May 31 00:39:45 2008 > 35.12% done, estimate finish Sat May 31 00:39:45 2008 > 35.15% done, estimate finish Sat May 31 00:39:44 2008 > 35.17% done, estimate finish Sat May 31 00:39:43 2008 > 35.19% done, estimate finish Sat May 31 00:39:43 2008 > 35.21% done, estimate finish Sat May 31 00:39:42 2008 > 35.24% done, estimate finish Sat May 31 00:39:44 2008 > 35.26% done, estimate finish Sat May 31 00:39:44 2008 > 35.28% done, estimate finish Sat May 31 00:39:43 2008 > 35.31% done, estimate finish Sat May 31 00:39:43 2008 > 35.33% done, estimate finish Sat May 31 00:39:42 2008 > 35.35% done, estimate finish Sat May 31 00:39:44 2008 > 35.37% done, estimate finish Sat May 31 00:39:44 2008 > 35.40% done, estimate finish Sat May 31 00:39:43 2008 > 35.42% done, estimate finish Sat May 31 00:39:43 2008 > 35.44% done, estimate finish Sat May 31 00:39:42 2008 > 35.46% done, estimate finish Sat May 31 00:39:44 2008 > 35.49% done, estimate finish Sat May 31 00:39:44 2008 > 35.51% done, estimate finish Sat May 31 00:39:43 2008 > 35.53% done, estimate finish Sat May 31 00:39:42 2008 > 35.56% done, estimate finish Sat May 31 00:39:42 2008 > 35.58% done, estimate finish Sat May 31 00:39:41 2008 > 35.60% done, estimate finish Sat May 31 00:39:43 2008 > 35.62% done, estimate finish Sat May 31 00:39:43 2008 > 35.65% done, estimate finish Sat May 31 00:39:42 2008 > 35.67% done, estimate finish Sat May 31 00:39:42 2008 > 35.69% done, estimate finish Sat May 31 00:39:41 2008 > 35.71% done, estimate finish Sat May 31 00:39:43 2008 > 35.74% done, estimate finish Sat May 31 00:39:43 2008 > 35.76% done, estimate finish Sat May 31 00:39:42 2008 > 35.78% done, estimate finish Sat May 31 00:39:42 2008 > 35.81% done, estimate finish Sat May 31 00:39:41 2008 > 35.83% done, estimate finish Sat May 31 00:39:40 2008 > 35.85% done, estimate finish Sat May 31 00:39:43 2008 > 35.87% done, estimate finish Sat May 31 00:39:42 2008 > 35.90% done, estimate finish Sat May 31 00:39:44 2008 > 35.92% done, estimate finish Sat May 31 00:39:44 2008 > 35.94% done, estimate finish Sat May 31 00:39:43 2008 > 35.96% done, estimate finish Sat May 31 00:39:42 2008 > 35.99% done, estimate finish Sat May 31 00:39:45 2008 > 36.01% done, estimate finish Sat May 31 00:39:44 2008 > 36.03% done, estimate finish Sat May 31 00:39:43 2008 > 36.06% done, estimate finish Sat May 31 00:39:43 2008 > 36.08% done, estimate finish Sat May 31 00:39:42 2008 > 36.10% done, estimate finish Sat May 31 00:39:44 2008 > 36.12% done, estimate finish Sat May 31 00:39:44 2008 > 36.15% done, estimate finish Sat May 31 00:39:43 2008 > 36.17% done, estimate finish Sat May 31 00:39:43 2008 > 36.19% done, estimate finish Sat May 31 00:39:42 2008 > 36.21% done, estimate finish Sat May 31 00:39:42 2008 > 36.24% done, estimate finish Sat May 31 00:39:44 2008 > 36.26% done, estimate finish Sat May 31 00:39:43 2008 > 36.28% done, estimate finish Sat May 31 00:39:43 2008 > 36.30% done, estimate finish Sat May 31 00:39:42 2008 > 36.33% done, estimate finish Sat May 31 00:39:41 2008 > 36.35% done, estimate finish Sat May 31 00:39:44 2008 > 36.37% done, estimate finish Sat May 31 00:39:43 2008 > 36.40% done, estimate finish Sat May 31 00:39:42 2008 > 36.42% done, estimate finish Sat May 31 00:39:42 2008 > 36.44% done, estimate finish Sat May 31 00:39:41 2008 > 36.46% done, estimate finish Sat May 31 00:39:43 2008 > 36.49% done, estimate finish Sat May 31 00:39:43 2008 > 36.51% done, estimate finish Sat May 31 00:39:42 2008 > 36.53% done, estimate finish Sat May 31 00:39:42 2008 > 36.56% done, estimate finish Sat May 31 00:39:41 2008 > 36.58% done, estimate finish Sat May 31 00:39:41 2008 > 36.60% done, estimate finish Sat May 31 00:39:43 2008 > 36.62% done, estimate finish Sat May 31 00:39:42 2008 > 36.65% done, estimate finish Sat May 31 00:39:42 2008 > 36.67% done, estimate finish Sat May 31 00:39:41 2008 > 36.69% done, estimate finish Sat May 31 00:39:40 2008 > 36.71% done, estimate finish Sat May 31 00:39:43 2008 > 36.74% done, estimate finish Sat May 31 00:39:42 2008 > 36.76% done, estimate finish Sat May 31 00:39:41 2008 > 36.78% done, estimate finish Sat May 31 00:39:41 2008 > 36.81% done, estimate finish Sat May 31 00:39:40 2008 > 36.83% done, estimate finish Sat May 31 00:39:40 2008 > 36.85% done, estimate finish Sat May 31 00:39:42 2008 > 36.87% done, estimate finish Sat May 31 00:39:41 2008 > 36.90% done, estimate finish Sat May 31 00:39:41 2008 > 36.92% done, estimate finish Sat May 31 00:39:40 2008 > 36.94% done, estimate finish Sat May 31 00:39:40 2008 > 36.96% done, estimate finish Sat May 31 00:39:42 2008 > 36.99% done, estimate finish Sat May 31 00:39:41 2008 > 37.01% done, estimate finish Sat May 31 00:39:41 2008 > 37.03% done, estimate finish Sat May 31 00:39:40 2008 > 37.06% done, estimate finish Sat May 31 00:39:39 2008 > 37.08% done, estimate finish Sat May 31 00:39:39 2008 > 37.10% done, estimate finish Sat May 31 00:39:41 2008 > 37.12% done, estimate finish Sat May 31 00:39:40 2008 > 37.15% done, estimate finish Sat May 31 00:39:40 2008 > 37.17% done, estimate finish Sat May 31 00:39:39 2008 > 37.19% done, estimate finish Sat May 31 00:39:39 2008 > 37.21% done, estimate finish Sat May 31 00:39:41 2008 > 37.24% done, estimate finish Sat May 31 00:39:40 2008 > 37.26% done, estimate finish Sat May 31 00:39:40 2008 > 37.28% done, estimate finish Sat May 31 00:39:39 2008 > 37.30% done, estimate finish Sat May 31 00:39:39 2008 > 37.33% done, estimate finish Sat May 31 00:39:38 2008 > 37.35% done, estimate finish Sat May 31 00:39:40 2008 > 37.37% done, estimate finish Sat May 31 00:39:40 2008 > 37.40% done, estimate finish Sat May 31 00:39:39 2008 > 37.42% done, estimate finish Sat May 31 00:39:38 2008 > 37.44% done, estimate finish Sat May 31 00:39:38 2008 > 37.46% done, estimate finish Sat May 31 00:39:40 2008 > 37.49% done, estimate finish Sat May 31 00:39:40 2008 > 37.51% done, estimate finish Sat May 31 00:39:39 2008 > 37.53% done, estimate finish Sat May 31 00:39:38 2008 > 37.55% done, estimate finish Sat May 31 00:39:38 2008 > 37.58% done, estimate finish Sat May 31 00:39:40 2008 > 37.60% done, estimate finish Sat May 31 00:39:39 2008 > 37.62% done, estimate finish Sat May 31 00:39:39 2008 > 37.65% done, estimate finish Sat May 31 00:39:38 2008 > 37.67% done, estimate finish Sat May 31 00:39:38 2008 > 37.69% done, estimate finish Sat May 31 00:39:37 2008 > 37.71% done, estimate finish Sat May 31 00:39:39 2008 > 37.74% done, estimate finish Sat May 31 00:39:39 2008 > 37.76% done, estimate finish Sat May 31 00:39:38 2008 > 37.78% done, estimate finish Sat May 31 00:39:38 2008 > 37.80% done, estimate finish Sat May 31 00:39:37 2008 > 37.83% done, estimate finish Sat May 31 00:39:39 2008 > 37.85% done, estimate finish Sat May 31 00:39:39 2008 > 37.87% done, estimate finish Sat May 31 00:39:38 2008 > 37.90% done, estimate finish Sat May 31 00:39:37 2008 > 37.92% done, estimate finish Sat May 31 00:39:37 2008 > 37.94% done, estimate finish Sat May 31 00:39:36 2008 > 37.96% done, estimate finish Sat May 31 00:39:38 2008 > 37.99% done, estimate finish Sat May 31 00:39:38 2008 > 38.01% done, estimate finish Sat May 31 00:39:37 2008 > 38.03% done, estimate finish Sat May 31 00:39:37 2008 > 38.05% done, estimate finish Sat May 31 00:39:36 2008 > 38.08% done, estimate finish Sat May 31 00:39:38 2008 > 38.10% done, estimate finish Sat May 31 00:39:38 2008 > 38.12% done, estimate finish Sat May 31 00:39:37 2008 > 38.15% done, estimate finish Sat May 31 00:39:37 2008 > 38.17% done, estimate finish Sat May 31 00:39:36 2008 > 38.19% done, estimate finish Sat May 31 00:39:36 2008 > 38.21% done, estimate finish Sat May 31 00:39:38 2008 > 38.24% done, estimate finish Sat May 31 00:39:37 2008 > 38.26% done, estimate finish Sat May 31 00:39:37 2008 > 38.28% done, estimate finish Sat May 31 00:39:36 2008 > 38.30% done, estimate finish Sat May 31 00:39:35 2008 > 38.33% done, estimate finish Sat May 31 00:39:38 2008 > 38.35% done, estimate finish Sat May 31 00:39:37 2008 > 38.37% done, estimate finish Sat May 31 00:39:36 2008 > 38.40% done, estimate finish Sat May 31 00:39:36 2008 > 38.42% done, estimate finish Sat May 31 00:39:35 2008 > 38.44% done, estimate finish Sat May 31 00:39:35 2008 > 38.46% done, estimate finish Sat May 31 00:39:37 2008 > 38.49% done, estimate finish Sat May 31 00:39:36 2008 > 38.51% done, estimate finish Sat May 31 00:39:36 2008 > 38.53% done, estimate finish Sat May 31 00:39:35 2008 > 38.55% done, estimate finish Sat May 31 00:39:35 2008 > 38.58% done, estimate finish Sat May 31 00:39:37 2008 > 38.60% done, estimate finish Sat May 31 00:39:36 2008 > 38.62% done, estimate finish Sat May 31 00:39:36 2008 > 38.65% done, estimate finish Sat May 31 00:39:35 2008 > 38.67% done, estimate finish Sat May 31 00:39:35 2008 > 38.69% done, estimate finish Sat May 31 00:39:37 2008 > 38.71% done, estimate finish Sat May 31 00:39:36 2008 > 38.74% done, estimate finish Sat May 31 00:39:36 2008 > 38.76% done, estimate finish Sat May 31 00:39:35 2008 > 38.78% done, estimate finish Sat May 31 00:39:34 2008 > 38.80% done, estimate finish Sat May 31 00:39:34 2008 > 38.83% done, estimate finish Sat May 31 00:39:36 2008 > 38.85% done, estimate finish Sat May 31 00:39:35 2008 > 38.87% done, estimate finish Sat May 31 00:39:35 2008 > 38.90% done, estimate finish Sat May 31 00:39:34 2008 > 38.92% done, estimate finish Sat May 31 00:39:34 2008 > 38.94% done, estimate finish Sat May 31 00:39:36 2008 > 38.96% done, estimate finish Sat May 31 00:39:35 2008 > 38.99% done, estimate finish Sat May 31 00:39:35 2008 > 39.01% done, estimate finish Sat May 31 00:39:34 2008 > 39.03% done, estimate finish Sat May 31 00:39:34 2008 > 39.05% done, estimate finish Sat May 31 00:39:33 2008 > 39.08% done, estimate finish Sat May 31 00:39:35 2008 > 39.10% done, estimate finish Sat May 31 00:39:35 2008 > 39.12% done, estimate finish Sat May 31 00:39:34 2008 > 39.14% done, estimate finish Sat May 31 00:39:34 2008 > 39.17% done, estimate finish Sat May 31 00:39:33 2008 > 39.19% done, estimate finish Sat May 31 00:39:35 2008 > 39.21% done, estimate finish Sat May 31 00:39:35 2008 > 39.24% done, estimate finish Sat May 31 00:39:34 2008 > 39.26% done, estimate finish Sat May 31 00:39:33 2008 > 39.28% done, estimate finish Sat May 31 00:39:33 2008 > 39.30% done, estimate finish Sat May 31 00:39:32 2008 > 39.33% done, estimate finish Sat May 31 00:39:34 2008 > 39.35% done, estimate finish Sat May 31 00:39:34 2008 > 39.37% done, estimate finish Sat May 31 00:39:33 2008 > 39.39% done, estimate finish Sat May 31 00:39:33 2008 > 39.42% done, estimate finish Sat May 31 00:39:32 2008 > 39.44% done, estimate finish Sat May 31 00:39:34 2008 > 39.46% done, estimate finish Sat May 31 00:39:34 2008 > 39.49% done, estimate finish Sat May 31 00:39:33 2008 > 39.51% done, estimate finish Sat May 31 00:39:33 2008 > 39.53% done, estimate finish Sat May 31 00:39:32 2008 > 39.55% done, estimate finish Sat May 31 00:39:32 2008 > 39.58% done, estimate finish Sat May 31 00:39:34 2008 > 39.60% done, estimate finish Sat May 31 00:39:33 2008 > 39.62% done, estimate finish Sat May 31 00:39:33 2008 > 39.65% done, estimate finish Sat May 31 00:39:32 2008 > 39.67% done, estimate finish Sat May 31 00:39:32 2008 > 39.69% done, estimate finish Sat May 31 00:39:34 2008 > 39.71% done, estimate finish Sat May 31 00:39:33 2008 > 39.74% done, estimate finish Sat May 31 00:39:33 2008 > 39.76% done, estimate finish Sat May 31 00:39:32 2008 > 39.78% done, estimate finish Sat May 31 00:39:32 2008 > 39.80% done, estimate finish Sat May 31 00:39:31 2008 > 39.83% done, estimate finish Sat May 31 00:39:33 2008 > 39.85% done, estimate finish Sat May 31 00:39:32 2008 > 39.87% done, estimate finish Sat May 31 00:39:32 2008 > 39.90% done, estimate finish Sat May 31 00:39:31 2008 > 39.92% done, estimate finish Sat May 31 00:39:31 2008 > 39.94% done, estimate finish Sat May 31 00:39:33 2008 > 39.96% done, estimate finish Sat May 31 00:39:32 2008 > 39.99% done, estimate finish Sat May 31 00:39:32 2008 > 40.01% done, estimate finish Sat May 31 00:39:31 2008 > 40.03% done, estimate finish Sat May 31 00:39:31 2008 > 40.05% done, estimate finish Sat May 31 00:39:30 2008 > 40.08% done, estimate finish Sat May 31 00:39:32 2008 > 40.10% done, estimate finish Sat May 31 00:39:32 2008 > 40.12% done, estimate finish Sat May 31 00:39:31 2008 > 40.14% done, estimate finish Sat May 31 00:39:31 2008 > 40.17% done, estimate finish Sat May 31 00:39:30 2008 > 40.19% done, estimate finish Sat May 31 00:39:32 2008 > 40.21% done, estimate finish Sat May 31 00:39:32 2008 > 40.24% done, estimate finish Sat May 31 00:39:31 2008 > 40.26% done, estimate finish Sat May 31 00:39:31 2008 > 40.28% done, estimate finish Sat May 31 00:39:30 2008 > 40.30% done, estimate finish Sat May 31 00:39:32 2008 > 40.33% done, estimate finish Sat May 31 00:39:32 2008 > 40.35% done, estimate finish Sat May 31 00:39:31 2008 > 40.37% done, estimate finish Sat May 31 00:39:30 2008 > 40.39% done, estimate finish Sat May 31 00:39:30 2008 > 40.42% done, estimate finish Sat May 31 00:39:29 2008 > 40.44% done, estimate finish Sat May 31 00:39:31 2008 > 40.46% done, estimate finish Sat May 31 00:39:31 2008 > 40.49% done, estimate finish Sat May 31 00:39:30 2008 > 40.51% done, estimate finish Sat May 31 00:39:30 2008 > 40.53% done, estimate finish Sat May 31 00:39:29 2008 > 40.55% done, estimate finish Sat May 31 00:39:31 2008 > 40.58% done, estimate finish Sat May 31 00:39:31 2008 > 40.60% done, estimate finish Sat May 31 00:39:30 2008 > 40.62% done, estimate finish Sat May 31 00:39:30 2008 > 40.64% done, estimate finish Sat May 31 00:39:29 2008 > 40.67% done, estimate finish Sat May 31 00:39:29 2008 > 40.69% done, estimate finish Sat May 31 00:39:31 2008 > 40.71% done, estimate finish Sat May 31 00:39:30 2008 > 40.74% done, estimate finish Sat May 31 00:39:30 2008 > 40.76% done, estimate finish Sat May 31 00:39:29 2008 > 40.78% done, estimate finish Sat May 31 00:39:29 2008 > 40.80% done, estimate finish Sat May 31 00:39:31 2008 > 40.83% done, estimate finish Sat May 31 00:39:30 2008 > 40.85% done, estimate finish Sat May 31 00:39:30 2008 > 40.87% done, estimate finish Sat May 31 00:39:29 2008 > 40.89% done, estimate finish Sat May 31 00:39:29 2008 > 40.92% done, estimate finish Sat May 31 00:39:28 2008 > 40.94% done, estimate finish Sat May 31 00:39:30 2008 > 40.96% done, estimate finish Sat May 31 00:39:30 2008 > 40.99% done, estimate finish Sat May 31 00:39:29 2008 > 41.01% done, estimate finish Sat May 31 00:39:29 2008 > 41.03% done, estimate finish Sat May 31 00:39:28 2008 > 41.05% done, estimate finish Sat May 31 00:39:30 2008 > 41.08% done, estimate finish Sat May 31 00:39:29 2008 > 41.10% done, estimate finish Sat May 31 00:39:29 2008 > 41.12% done, estimate finish Sat May 31 00:39:28 2008 > 41.14% done, estimate finish Sat May 31 00:39:28 2008 > 41.17% done, estimate finish Sat May 31 00:39:30 2008 > 41.19% done, estimate finish Sat May 31 00:39:29 2008 > 41.21% done, estimate finish Sat May 31 00:39:29 2008 > 41.24% done, estimate finish Sat May 31 00:39:28 2008 > 41.26% done, estimate finish Sat May 31 00:39:28 2008 > 41.28% done, estimate finish Sat May 31 00:39:27 2008 > 41.30% done, estimate finish Sat May 31 00:39:29 2008 > 41.33% done, estimate finish Sat May 31 00:39:29 2008 > 41.35% done, estimate finish Sat May 31 00:39:28 2008 > 41.37% done, estimate finish Sat May 31 00:39:28 2008 > 41.39% done, estimate finish Sat May 31 00:39:27 2008 > 41.42% done, estimate finish Sat May 31 00:39:29 2008 > 41.44% done, estimate finish Sat May 31 00:39:29 2008 > 41.46% done, estimate finish Sat May 31 00:39:28 2008 > 41.49% done, estimate finish Sat May 31 00:39:28 2008 > 41.51% done, estimate finish Sat May 31 00:39:27 2008 > 41.53% done, estimate finish Sat May 31 00:39:27 2008 > 41.55% done, estimate finish Sat May 31 00:39:29 2008 > 41.58% done, estimate finish Sat May 31 00:39:28 2008 > 41.60% done, estimate finish Sat May 31 00:39:28 2008 > 41.62% done, estimate finish Sat May 31 00:39:27 2008 > 41.64% done, estimate finish Sat May 31 00:39:27 2008 > 41.67% done, estimate finish Sat May 31 00:39:28 2008 > 41.69% done, estimate finish Sat May 31 00:39:28 2008 > 41.71% done, estimate finish Sat May 31 00:39:27 2008 > 41.74% done, estimate finish Sat May 31 00:39:27 2008 > 41.76% done, estimate finish Sat May 31 00:39:27 2008 > 41.78% done, estimate finish Sat May 31 00:39:26 2008 > 41.80% done, estimate finish Sat May 31 00:39:28 2008 > 41.83% done, estimate finish Sat May 31 00:39:27 2008 > 41.85% done, estimate finish Sat May 31 00:39:27 2008 > 41.87% done, estimate finish Sat May 31 00:39:26 2008 > 41.89% done, estimate finish Sat May 31 00:39:26 2008 > 41.92% done, estimate finish Sat May 31 00:39:28 2008 > 41.94% done, estimate finish Sat May 31 00:39:27 2008 > 41.96% done, estimate finish Sat May 31 00:39:27 2008 > 41.99% done, estimate finish Sat May 31 00:39:26 2008 > 42.01% done, estimate finish Sat May 31 00:39:26 2008 > 42.03% done, estimate finish Sat May 31 00:39:25 2008 > 42.05% done, estimate finish Sat May 31 00:39:27 2008 > 42.08% done, estimate finish Sat May 31 00:39:27 2008 > 42.10% done, estimate finish Sat May 31 00:39:26 2008 > 42.12% done, estimate finish Sat May 31 00:39:26 2008 > 42.14% done, estimate finish Sat May 31 00:39:25 2008 > 42.17% done, estimate finish Sat May 31 00:39:27 2008 > 42.19% done, estimate finish Sat May 31 00:39:27 2008 > 42.21% done, estimate finish Sat May 31 00:39:26 2008 > 42.23% done, estimate finish Sat May 31 00:39:26 2008 > 42.26% done, estimate finish Sat May 31 00:39:25 2008 > 42.28% done, estimate finish Sat May 31 00:39:25 2008 > 42.30% done, estimate finish Sat May 31 00:39:27 2008 > 42.33% done, estimate finish Sat May 31 00:39:26 2008 > 42.35% done, estimate finish Sat May 31 00:39:26 2008 > 42.37% done, estimate finish Sat May 31 00:39:25 2008 > 42.39% done, estimate finish Sat May 31 00:39:25 2008 > 42.42% done, estimate finish Sat May 31 00:39:27 2008 > 42.44% done, estimate finish Sat May 31 00:39:26 2008 > 42.46% done, estimate finish Sat May 31 00:39:26 2008 > 42.48% done, estimate finish Sat May 31 00:39:25 2008 > 42.51% done, estimate finish Sat May 31 00:39:25 2008 > 42.53% done, estimate finish Sat May 31 00:39:26 2008 > 42.55% done, estimate finish Sat May 31 00:39:26 2008 > 42.58% done, estimate finish Sat May 31 00:39:25 2008 > 42.60% done, estimate finish Sat May 31 00:39:25 2008 > 42.62% done, estimate finish Sat May 31 00:39:24 2008 > 42.64% done, estimate finish Sat May 31 00:39:24 2008 > 42.67% done, estimate finish Sat May 31 00:39:26 2008 > 42.69% done, estimate finish Sat May 31 00:39:25 2008 > 42.71% done, estimate finish Sat May 31 00:39:25 2008 > 42.73% done, estimate finish Sat May 31 00:39:24 2008 > 42.76% done, estimate finish Sat May 31 00:39:24 2008 > 42.78% done, estimate finish Sat May 31 00:39:26 2008 > 42.80% done, estimate finish Sat May 31 00:39:28 2008 > 42.83% done, estimate finish Sat May 31 00:39:27 2008 > 42.85% done, estimate finish Sat May 31 00:39:27 2008 > 42.87% done, estimate finish Sat May 31 00:39:26 2008 > 42.89% done, estimate finish Sat May 31 00:39:26 2008 > 42.92% done, estimate finish Sat May 31 00:39:28 2008 > 42.94% done, estimate finish Sat May 31 00:39:27 2008 > 42.96% done, estimate finish Sat May 31 00:39:27 2008 > 42.98% done, estimate finish Sat May 31 00:39:26 2008 > 43.01% done, estimate finish Sat May 31 00:39:26 2008 > 43.03% done, estimate finish Sat May 31 00:39:27 2008 > 43.05% done, estimate finish Sat May 31 00:39:27 2008 > 43.08% done, estimate finish Sat May 31 00:39:27 2008 > 43.10% done, estimate finish Sat May 31 00:39:26 2008 > 43.12% done, estimate finish Sat May 31 00:39:26 2008 > 43.14% done, estimate finish Sat May 31 00:39:25 2008 > 43.17% done, estimate finish Sat May 31 00:39:27 2008 > 43.19% done, estimate finish Sat May 31 00:39:26 2008 > 43.21% done, estimate finish Sat May 31 00:39:26 2008 > 43.23% done, estimate finish Sat May 31 00:39:25 2008 > 43.26% done, estimate finish Sat May 31 00:39:25 2008 > 43.28% done, estimate finish Sat May 31 00:39:27 2008 > 43.30% done, estimate finish Sat May 31 00:39:26 2008 > 43.33% done, estimate finish Sat May 31 00:39:26 2008 > 43.35% done, estimate finish Sat May 31 00:39:25 2008 > 43.37% done, estimate finish Sat May 31 00:39:25 2008 > 43.39% done, estimate finish Sat May 31 00:39:24 2008 > 43.42% done, estimate finish Sat May 31 00:39:26 2008 > 43.44% done, estimate finish Sat May 31 00:39:26 2008 > 43.46% done, estimate finish Sat May 31 00:39:25 2008 > 43.48% done, estimate finish Sat May 31 00:39:25 2008 > 43.51% done, estimate finish Sat May 31 00:39:24 2008 > 43.53% done, estimate finish Sat May 31 00:39:26 2008 > 43.55% done, estimate finish Sat May 31 00:39:26 2008 > 43.58% done, estimate finish Sat May 31 00:39:25 2008 > 43.60% done, estimate finish Sat May 31 00:39:25 2008 > 43.62% done, estimate finish Sat May 31 00:39:24 2008 > 43.64% done, estimate finish Sat May 31 00:39:24 2008 > 43.67% done, estimate finish Sat May 31 00:39:26 2008 > 43.69% done, estimate finish Sat May 31 00:39:25 2008 > 43.71% done, estimate finish Sat May 31 00:39:25 2008 > 43.73% done, estimate finish Sat May 31 00:39:24 2008 > 43.76% done, estimate finish Sat May 31 00:39:24 2008 > 43.78% done, estimate finish Sat May 31 00:39:26 2008 > 43.80% done, estimate finish Sat May 31 00:39:25 2008 > 43.83% done, estimate finish Sat May 31 00:39:25 2008 > 43.85% done, estimate finish Sat May 31 00:39:24 2008 > 43.87% done, estimate finish Sat May 31 00:39:24 2008 > 43.89% done, estimate finish Sat May 31 00:39:23 2008 > 43.92% done, estimate finish Sat May 31 00:39:25 2008 > 43.94% done, estimate finish Sat May 31 00:39:25 2008 > 43.96% done, estimate finish Sat May 31 00:39:24 2008 > 43.98% done, estimate finish Sat May 31 00:39:24 2008 > 44.01% done, estimate finish Sat May 31 00:39:23 2008 > 44.03% done, estimate finish Sat May 31 00:39:25 2008 > 44.05% done, estimate finish Sat May 31 00:39:25 2008 > 44.08% done, estimate finish Sat May 31 00:39:24 2008 > 44.10% done, estimate finish Sat May 31 00:39:24 2008 > 44.12% done, estimate finish Sat May 31 00:39:23 2008 > 44.14% done, estimate finish Sat May 31 00:39:23 2008 > 44.17% done, estimate finish Sat May 31 00:39:24 2008 > 44.19% done, estimate finish Sat May 31 00:39:24 2008 > 44.21% done, estimate finish Sat May 31 00:39:24 2008 > 44.23% done, estimate finish Sat May 31 00:39:23 2008 > 44.26% done, estimate finish Sat May 31 00:39:23 2008 > 44.28% done, estimate finish Sat May 31 00:39:24 2008 > 44.30% done, estimate finish Sat May 31 00:39:24 2008 > 44.33% done, estimate finish Sat May 31 00:39:23 2008 > 44.35% done, estimate finish Sat May 31 00:39:23 2008 > 44.37% done, estimate finish Sat May 31 00:39:23 2008 > 44.39% done, estimate finish Sat May 31 00:39:24 2008 > 44.42% done, estimate finish Sat May 31 00:39:24 2008 > 44.44% done, estimate finish Sat May 31 00:39:23 2008 > 44.46% done, estimate finish Sat May 31 00:39:23 2008 > 44.48% done, estimate finish Sat May 31 00:39:22 2008 > 44.51% done, estimate finish Sat May 31 00:39:22 2008 > 44.53% done, estimate finish Sat May 31 00:39:24 2008 > 44.55% done, estimate finish Sat May 31 00:39:23 2008 > 44.57% done, estimate finish Sat May 31 00:39:23 2008 > 44.60% done, estimate finish Sat May 31 00:39:22 2008 > 44.62% done, estimate finish Sat May 31 00:39:22 2008 > 44.64% done, estimate finish Sat May 31 00:39:24 2008 > 44.67% done, estimate finish Sat May 31 00:39:23 2008 > 44.69% done, estimate finish Sat May 31 00:39:23 2008 > 44.71% done, estimate finish Sat May 31 00:39:22 2008 > 44.73% done, estimate finish Sat May 31 00:39:22 2008 > 44.76% done, estimate finish Sat May 31 00:39:21 2008 > 44.78% done, estimate finish Sat May 31 00:39:23 2008 > 44.80% done, estimate finish Sat May 31 00:39:23 2008 > 44.82% done, estimate finish Sat May 31 00:39:22 2008 > 44.85% done, estimate finish Sat May 31 00:39:22 2008 > 44.87% done, estimate finish Sat May 31 00:39:21 2008 > 44.89% done, estimate finish Sat May 31 00:39:23 2008 > 44.92% done, estimate finish Sat May 31 00:39:23 2008 > 44.94% done, estimate finish Sat May 31 00:39:22 2008 > 44.96% done, estimate finish Sat May 31 00:39:22 2008 > 44.98% done, estimate finish Sat May 31 00:39:21 2008 > 45.01% done, estimate finish Sat May 31 00:39:21 2008 > 45.03% done, estimate finish Sat May 31 00:39:23 2008 > 45.05% done, estimate finish Sat May 31 00:39:22 2008 > 45.07% done, estimate finish Sat May 31 00:39:22 2008 > 45.10% done, estimate finish Sat May 31 00:39:21 2008 > 45.12% done, estimate finish Sat May 31 00:39:21 2008 > 45.14% done, estimate finish Sat May 31 00:39:23 2008 > 45.17% done, estimate finish Sat May 31 00:39:22 2008 > 45.19% done, estimate finish Sat May 31 00:39:22 2008 > 45.21% done, estimate finish Sat May 31 00:39:21 2008 > 45.23% done, estimate finish Sat May 31 00:39:21 2008 > 45.26% done, estimate finish Sat May 31 00:39:20 2008 > 45.28% done, estimate finish Sat May 31 00:39:22 2008 > 45.30% done, estimate finish Sat May 31 00:39:22 2008 > 45.32% done, estimate finish Sat May 31 00:39:21 2008 > 45.35% done, estimate finish Sat May 31 00:39:21 2008 > 45.37% done, estimate finish Sat May 31 00:39:20 2008 > 45.39% done, estimate finish Sat May 31 00:39:22 2008 > 45.42% done, estimate finish Sat May 31 00:39:21 2008 > 45.44% done, estimate finish Sat May 31 00:39:21 2008 > 45.46% done, estimate finish Sat May 31 00:39:21 2008 > 45.48% done, estimate finish Sat May 31 00:39:20 2008 > 45.51% done, estimate finish Sat May 31 00:39:22 2008 > 45.53% done, estimate finish Sat May 31 00:39:21 2008 > 45.55% done, estimate finish Sat May 31 00:39:21 2008 > 45.57% done, estimate finish Sat May 31 00:39:21 2008 > 45.60% done, estimate finish Sat May 31 00:39:20 2008 > 45.62% done, estimate finish Sat May 31 00:39:20 2008 > 45.64% done, estimate finish Sat May 31 00:39:21 2008 > 45.67% done, estimate finish Sat May 31 00:39:21 2008 > 45.69% done, estimate finish Sat May 31 00:39:20 2008 > 45.71% done, estimate finish Sat May 31 00:39:20 2008 > 45.73% done, estimate finish Sat May 31 00:39:20 2008 > 45.76% done, estimate finish Sat May 31 00:39:21 2008 > 45.78% done, estimate finish Sat May 31 00:39:21 2008 > 45.80% done, estimate finish Sat May 31 00:39:20 2008 > 45.82% done, estimate finish Sat May 31 00:39:20 2008 > 45.85% done, estimate finish Sat May 31 00:39:20 2008 > 45.87% done, estimate finish Sat May 31 00:39:19 2008 > 45.89% done, estimate finish Sat May 31 00:39:21 2008 > 45.92% done, estimate finish Sat May 31 00:39:20 2008 > 45.94% done, estimate finish Sat May 31 00:39:20 2008 > 45.96% done, estimate finish Sat May 31 00:39:19 2008 > 45.98% done, estimate finish Sat May 31 00:39:19 2008 > 46.01% done, estimate finish Sat May 31 00:39:21 2008 > 46.03% done, estimate finish Sat May 31 00:39:20 2008 > 46.05% done, estimate finish Sat May 31 00:39:20 2008 > 46.07% done, estimate finish Sat May 31 00:39:19 2008 > 46.10% done, estimate finish Sat May 31 00:39:19 2008 > 46.12% done, estimate finish Sat May 31 00:39:19 2008 > 46.14% done, estimate finish Sat May 31 00:39:20 2008 > 46.17% done, estimate finish Sat May 31 00:39:20 2008 > 46.19% done, estimate finish Sat May 31 00:39:19 2008 > 46.21% done, estimate finish Sat May 31 00:39:19 2008 > 46.23% done, estimate finish Sat May 31 00:39:18 2008 > 46.26% done, estimate finish Sat May 31 00:39:20 2008 > 46.28% done, estimate finish Sat May 31 00:39:20 2008 > 46.30% done, estimate finish Sat May 31 00:39:19 2008 > 46.32% done, estimate finish Sat May 31 00:39:19 2008 > 46.35% done, estimate finish Sat May 31 00:39:18 2008 > 46.37% done, estimate finish Sat May 31 00:39:18 2008 > 46.39% done, estimate finish Sat May 31 00:39:20 2008 > 46.42% done, estimate finish Sat May 31 00:39:19 2008 > 46.44% done, estimate finish Sat May 31 00:39:19 2008 > 46.46% done, estimate finish Sat May 31 00:39:18 2008 > 46.48% done, estimate finish Sat May 31 00:39:18 2008 > 46.51% done, estimate finish Sat May 31 00:39:20 2008 > 46.53% done, estimate finish Sat May 31 00:39:19 2008 > 46.55% done, estimate finish Sat May 31 00:39:19 2008 > 46.57% done, estimate finish Sat May 31 00:39:18 2008 > 46.60% done, estimate finish Sat May 31 00:39:18 2008 > 46.62% done, estimate finish Sat May 31 00:39:20 2008 > 46.64% done, estimate finish Sat May 31 00:39:19 2008 > 46.66% done, estimate finish Sat May 31 00:39:19 2008 > 46.69% done, estimate finish Sat May 31 00:39:18 2008 > 46.71% done, estimate finish Sat May 31 00:39:18 2008 > 46.73% done, estimate finish Sat May 31 00:39:17 2008 > 46.76% done, estimate finish Sat May 31 00:39:19 2008 > 46.78% done, estimate finish Sat May 31 00:39:19 2008 > 46.80% done, estimate finish Sat May 31 00:39:18 2008 > 46.82% done, estimate finish Sat May 31 00:39:18 2008 > 46.85% done, estimate finish Sat May 31 00:39:17 2008 > 46.87% done, estimate finish Sat May 31 00:39:19 2008 > 46.89% done, estimate finish Sat May 31 00:39:19 2008 > 46.91% done, estimate finish Sat May 31 00:39:18 2008 > 46.94% done, estimate finish Sat May 31 00:39:18 2008 > 46.96% done, estimate finish Sat May 31 00:39:17 2008 > 46.98% done, estimate finish Sat May 31 00:39:17 2008 > 47.01% done, estimate finish Sat May 31 00:39:19 2008 > 47.03% done, estimate finish Sat May 31 00:39:18 2008 > 47.05% done, estimate finish Sat May 31 00:39:18 2008 > 47.07% done, estimate finish Sat May 31 00:39:17 2008 > 47.10% done, estimate finish Sat May 31 00:39:17 2008 > 47.12% done, estimate finish Sat May 31 00:39:18 2008 > 47.14% done, estimate finish Sat May 31 00:39:18 2008 > 47.17% done, estimate finish Sat May 31 00:39:18 2008 > 47.19% done, estimate finish Sat May 31 00:39:17 2008 > 47.21% done, estimate finish Sat May 31 00:39:17 2008 > 47.23% done, estimate finish Sat May 31 00:39:16 2008 > 47.26% done, estimate finish Sat May 31 00:39:18 2008 > 47.28% done, estimate finish Sat May 31 00:39:18 2008 > 47.30% done, estimate finish Sat May 31 00:39:17 2008 > 47.32% done, estimate finish Sat May 31 00:39:17 2008 > 47.35% done, estimate finish Sat May 31 00:39:16 2008 > 47.37% done, estimate finish Sat May 31 00:39:18 2008 > 47.39% done, estimate finish Sat May 31 00:39:17 2008 > 47.42% done, estimate finish Sat May 31 00:39:17 2008 > 47.44% done, estimate finish Sat May 31 00:39:17 2008 > 47.46% done, estimate finish Sat May 31 00:39:16 2008 > 47.48% done, estimate finish Sat May 31 00:39:16 2008 > 47.51% done, estimate finish Sat May 31 00:39:17 2008 > 47.53% done, estimate finish Sat May 31 00:39:17 2008 > 47.55% done, estimate finish Sat May 31 00:39:17 2008 > 47.57% done, estimate finish Sat May 31 00:39:16 2008 > 47.60% done, estimate finish Sat May 31 00:39:16 2008 > 47.62% done, estimate finish Sat May 31 00:39:17 2008 > 47.64% done, estimate finish Sat May 31 00:39:17 2008 > 47.66% done, estimate finish Sat May 31 00:39:17 2008 > 47.69% done, estimate finish Sat May 31 00:39:16 2008 > 47.71% done, estimate finish Sat May 31 00:39:16 2008 > 47.73% done, estimate finish Sat May 31 00:39:15 2008 > 47.76% done, estimate finish Sat May 31 00:39:17 2008 > 47.78% done, estimate finish Sat May 31 00:39:16 2008 > 47.80% done, estimate finish Sat May 31 00:39:16 2008 > 47.82% done, estimate finish Sat May 31 00:39:16 2008 > 47.85% done, estimate finish Sat May 31 00:39:15 2008 > 47.87% done, estimate finish Sat May 31 00:39:17 2008 > 47.89% done, estimate finish Sat May 31 00:39:16 2008 > 47.91% done, estimate finish Sat May 31 00:39:16 2008 > 47.94% done, estimate finish Sat May 31 00:39:16 2008 > 47.96% done, estimate finish Sat May 31 00:39:15 2008 > 47.98% done, estimate finish Sat May 31 00:39:17 2008 > 48.01% done, estimate finish Sat May 31 00:39:16 2008 > 48.03% done, estimate finish Sat May 31 00:39:16 2008 > 48.05% done, estimate finish Sat May 31 00:39:16 2008 > 48.07% done, estimate finish Sat May 31 00:39:15 2008 > 48.10% done, estimate finish Sat May 31 00:39:15 2008 > 48.12% done, estimate finish Sat May 31 00:39:16 2008 > 48.14% done, estimate finish Sat May 31 00:39:16 2008 > 48.16% done, estimate finish Sat May 31 00:39:16 2008 > 48.19% done, estimate finish Sat May 31 00:39:15 2008 > 48.21% done, estimate finish Sat May 31 00:39:15 2008 > 48.23% done, estimate finish Sat May 31 00:39:16 2008 > 48.26% done, estimate finish Sat May 31 00:39:16 2008 > 48.28% done, estimate finish Sat May 31 00:39:15 2008 > 48.30% done, estimate finish Sat May 31 00:39:15 2008 > 48.32% done, estimate finish Sat May 31 00:39:15 2008 > 48.35% done, estimate finish Sat May 31 00:39:14 2008 > 48.37% done, estimate finish Sat May 31 00:39:16 2008 > 48.39% done, estimate finish Sat May 31 00:39:15 2008 > 48.41% done, estimate finish Sat May 31 00:39:15 2008 > 48.44% done, estimate finish Sat May 31 00:39:15 2008 > 48.46% done, estimate finish Sat May 31 00:39:14 2008 > 48.48% done, estimate finish Sat May 31 00:39:16 2008 > 48.51% done, estimate finish Sat May 31 00:39:15 2008 > 48.53% done, estimate finish Sat May 31 00:39:15 2008 > 48.55% done, estimate finish Sat May 31 00:39:15 2008 > 48.57% done, estimate finish Sat May 31 00:39:14 2008 > 48.60% done, estimate finish Sat May 31 00:39:14 2008 > 48.62% done, estimate finish Sat May 31 00:39:15 2008 > 48.64% done, estimate finish Sat May 31 00:39:15 2008 > 48.66% done, estimate finish Sat May 31 00:39:14 2008 > 48.69% done, estimate finish Sat May 31 00:39:14 2008 > 48.71% done, estimate finish Sat May 31 00:39:14 2008 > 48.73% done, estimate finish Sat May 31 00:39:15 2008 > 48.75% done, estimate finish Sat May 31 00:39:15 2008 > 48.78% done, estimate finish Sat May 31 00:39:14 2008 > 48.80% done, estimate finish Sat May 31 00:39:14 2008 > 48.82% done, estimate finish Sat May 31 00:39:14 2008 > 48.85% done, estimate finish Sat May 31 00:39:13 2008 > 48.87% done, estimate finish Sat May 31 00:39:15 2008 > 48.89% done, estimate finish Sat May 31 00:39:14 2008 > 48.91% done, estimate finish Sat May 31 00:39:14 2008 > 48.94% done, estimate finish Sat May 31 00:39:14 2008 > 48.96% done, estimate finish Sat May 31 00:39:13 2008 > 48.98% done, estimate finish Sat May 31 00:39:15 2008 > 49.00% done, estimate finish Sat May 31 00:39:14 2008 > 49.03% done, estimate finish Sat May 31 00:39:14 2008 > 49.05% done, estimate finish Sat May 31 00:39:14 2008 > 49.07% done, estimate finish Sat May 31 00:39:13 2008 > 49.10% done, estimate finish Sat May 31 00:39:15 2008 > 49.12% done, estimate finish Sat May 31 00:39:14 2008 > 49.14% done, estimate finish Sat May 31 00:39:14 2008 > 49.16% done, estimate finish Sat May 31 00:39:13 2008 > 49.19% done, estimate finish Sat May 31 00:39:13 2008 > 49.21% done, estimate finish Sat May 31 00:39:13 2008 > 49.23% done, estimate finish Sat May 31 00:39:14 2008 > 49.26% done, estimate finish Sat May 31 00:39:14 2008 > 49.28% done, estimate finish Sat May 31 00:39:13 2008 > 49.30% done, estimate finish Sat May 31 00:39:13 2008 > 49.32% done, estimate finish Sat May 31 00:39:13 2008 > 49.35% done, estimate finish Sat May 31 00:39:14 2008 > 49.37% done, estimate finish Sat May 31 00:39:14 2008 > 49.39% done, estimate finish Sat May 31 00:39:13 2008 > 49.41% done, estimate finish Sat May 31 00:39:13 2008 > 49.44% done, estimate finish Sat May 31 00:39:13 2008 > 49.46% done, estimate finish Sat May 31 00:39:12 2008 > 49.48% done, estimate finish Sat May 31 00:39:14 2008 > 49.51% done, estimate finish Sat May 31 00:39:13 2008 > 49.53% done, estimate finish Sat May 31 00:39:13 2008 > 49.55% done, estimate finish Sat May 31 00:39:13 2008 > 49.57% done, estimate finish Sat May 31 00:39:12 2008 > 49.60% done, estimate finish Sat May 31 00:39:14 2008 > 49.62% done, estimate finish Sat May 31 00:39:13 2008 > 49.64% done, estimate finish Sat May 31 00:39:13 2008 > 49.66% done, estimate finish Sat May 31 00:39:15 2008 > 49.69% done, estimate finish Sat May 31 00:39:14 2008 > 49.71% done, estimate finish Sat May 31 00:39:14 2008 > 49.73% done, estimate finish Sat May 31 00:39:15 2008 > 49.75% done, estimate finish Sat May 31 00:39:15 2008 > 49.78% done, estimate finish Sat May 31 00:39:14 2008 > 49.80% done, estimate finish Sat May 31 00:39:14 2008 > 49.82% done, estimate finish Sat May 31 00:39:14 2008 > 49.85% done, estimate finish Sat May 31 00:39:15 2008 > 49.87% done, estimate finish Sat May 31 00:39:15 2008 > 49.89% done, estimate finish Sat May 31 00:39:14 2008 > 49.91% done, estimate finish Sat May 31 00:39:14 2008 > 49.94% done, estimate finish Sat May 31 00:39:14 2008 > 49.96% done, estimate finish Sat May 31 00:39:13 2008 > 49.98% done, estimate finish Sat May 31 00:39:15 2008 > 50.00% done, estimate finish Sat May 31 00:39:14 2008 > 50.03% done, estimate finish Sat May 31 00:39:14 2008 > 50.05% done, estimate finish Sat May 31 00:39:14 2008 > 50.07% done, estimate finish Sat May 31 00:39:13 2008 > 50.10% done, estimate finish Sat May 31 00:39:15 2008 > 50.12% done, estimate finish Sat May 31 00:39:14 2008 > 50.14% done, estimate finish Sat May 31 00:39:14 2008 > 50.16% done, estimate finish Sat May 31 00:39:14 2008 > 50.19% done, estimate finish Sat May 31 00:39:13 2008 > 50.21% done, estimate finish Sat May 31 00:39:13 2008 > 50.23% done, estimate finish Sat May 31 00:39:14 2008 > 50.25% done, estimate finish Sat May 31 00:39:14 2008 > 50.28% done, estimate finish Sat May 31 00:39:14 2008 > 50.30% done, estimate finish Sat May 31 00:39:13 2008 > 50.32% done, estimate finish Sat May 31 00:39:13 2008 > 50.35% done, estimate finish Sat May 31 00:39:14 2008 > 50.37% done, estimate finish Sat May 31 00:39:14 2008 > 50.39% done, estimate finish Sat May 31 00:39:13 2008 > 50.41% done, estimate finish Sat May 31 00:39:13 2008 > 50.44% done, estimate finish Sat May 31 00:39:13 2008 > 50.46% done, estimate finish Sat May 31 00:39:12 2008 > 50.48% done, estimate finish Sat May 31 00:39:14 2008 > 50.50% done, estimate finish Sat May 31 00:39:13 2008 > 50.53% done, estimate finish Sat May 31 00:39:13 2008 > 50.55% done, estimate finish Sat May 31 00:39:13 2008 > 50.57% done, estimate finish Sat May 31 00:39:12 2008 > 50.60% done, estimate finish Sat May 31 00:39:14 2008 > 50.62% done, estimate finish Sat May 31 00:39:13 2008 > 50.64% done, estimate finish Sat May 31 00:39:13 2008 > 50.66% done, estimate finish Sat May 31 00:39:13 2008 > 50.69% done, estimate finish Sat May 31 00:39:12 2008 > 50.71% done, estimate finish Sat May 31 00:39:12 2008 > 50.73% done, estimate finish Sat May 31 00:39:13 2008 > 50.75% done, estimate finish Sat May 31 00:39:13 2008 > 50.78% done, estimate finish Sat May 31 00:39:13 2008 > 50.80% done, estimate finish Sat May 31 00:39:12 2008 > 50.82% done, estimate finish Sat May 31 00:39:12 2008 > 50.85% done, estimate finish Sat May 31 00:39:13 2008 > 50.87% done, estimate finish Sat May 31 00:39:13 2008 > 50.89% done, estimate finish Sat May 31 00:39:13 2008 > 50.91% done, estimate finish Sat May 31 00:39:12 2008 > 50.94% done, estimate finish Sat May 31 00:39:12 2008 > 50.96% done, estimate finish Sat May 31 00:39:13 2008 > 50.98% done, estimate finish Sat May 31 00:39:13 2008 > 51.00% done, estimate finish Sat May 31 00:39:13 2008 > 51.03% done, estimate finish Sat May 31 00:39:12 2008 > 51.05% done, estimate finish Sat May 31 00:39:12 2008 > 51.07% done, estimate finish Sat May 31 00:39:11 2008 > 51.10% done, estimate finish Sat May 31 00:39:13 2008 > 51.12% done, estimate finish Sat May 31 00:39:12 2008 > 51.14% done, estimate finish Sat May 31 00:39:12 2008 > 51.16% done, estimate finish Sat May 31 00:39:12 2008 > 51.19% done, estimate finish Sat May 31 00:39:11 2008 > 51.21% done, estimate finish Sat May 31 00:39:13 2008 > 51.23% done, estimate finish Sat May 31 00:39:12 2008 > 51.25% done, estimate finish Sat May 31 00:39:12 2008 > 51.28% done, estimate finish Sat May 31 00:39:12 2008 > 51.30% done, estimate finish Sat May 31 00:39:11 2008 > 51.32% done, estimate finish Sat May 31 00:39:11 2008 > 51.34% done, estimate finish Sat May 31 00:39:12 2008 > 51.37% done, estimate finish Sat May 31 00:39:12 2008 > 51.39% done, estimate finish Sat May 31 00:39:12 2008 > 51.41% done, estimate finish Sat May 31 00:39:11 2008 > 51.44% done, estimate finish Sat May 31 00:39:11 2008 > 51.46% done, estimate finish Sat May 31 00:39:12 2008 > 51.48% done, estimate finish Sat May 31 00:39:12 2008 > 51.50% done, estimate finish Sat May 31 00:39:12 2008 > 51.53% done, estimate finish Sat May 31 00:39:11 2008 > 51.55% done, estimate finish Sat May 31 00:39:11 2008 > 51.57% done, estimate finish Sat May 31 00:39:10 2008 > 51.60% done, estimate finish Sat May 31 00:39:12 2008 > 51.62% done, estimate finish Sat May 31 00:39:12 2008 > 51.64% done, estimate finish Sat May 31 00:39:11 2008 > 51.66% done, estimate finish Sat May 31 00:39:11 2008 > 51.69% done, estimate finish Sat May 31 00:39:10 2008 > 51.71% done, estimate finish Sat May 31 00:39:12 2008 > 51.73% done, estimate finish Sat May 31 00:39:12 2008 > 51.75% done, estimate finish Sat May 31 00:39:11 2008 > 51.78% done, estimate finish Sat May 31 00:39:11 2008 > 51.80% done, estimate finish Sat May 31 00:39:10 2008 > 51.82% done, estimate finish Sat May 31 00:39:10 2008 > 51.85% done, estimate finish Sat May 31 00:39:11 2008 > 51.87% done, estimate finish Sat May 31 00:39:11 2008 > 51.89% done, estimate finish Sat May 31 00:39:11 2008 > 51.91% done, estimate finish Sat May 31 00:39:10 2008 > 51.94% done, estimate finish Sat May 31 00:39:10 2008 > 51.96% done, estimate finish Sat May 31 00:39:11 2008 > 51.98% done, estimate finish Sat May 31 00:39:11 2008 > 52.00% done, estimate finish Sat May 31 00:39:11 2008 > 52.03% done, estimate finish Sat May 31 00:39:10 2008 > 52.05% done, estimate finish Sat May 31 00:39:10 2008 > 52.07% done, estimate finish Sat May 31 00:39:09 2008 > 52.10% done, estimate finish Sat May 31 00:39:11 2008 > 52.12% done, estimate finish Sat May 31 00:39:11 2008 > 52.14% done, estimate finish Sat May 31 00:39:10 2008 > 52.16% done, estimate finish Sat May 31 00:39:10 2008 > 52.19% done, estimate finish Sat May 31 00:39:09 2008 > 52.21% done, estimate finish Sat May 31 00:39:11 2008 > 52.23% done, estimate finish Sat May 31 00:39:11 2008 > 52.25% done, estimate finish Sat May 31 00:39:10 2008 > 52.28% done, estimate finish Sat May 31 00:39:10 2008 > 52.30% done, estimate finish Sat May 31 00:39:09 2008 > 52.32% done, estimate finish Sat May 31 00:39:11 2008 > 52.34% done, estimate finish Sat May 31 00:39:11 2008 > 52.37% done, estimate finish Sat May 31 00:39:10 2008 > 52.39% done, estimate finish Sat May 31 00:39:10 2008 > 52.41% done, estimate finish Sat May 31 00:39:09 2008 > 52.44% done, estimate finish Sat May 31 00:39:09 2008 > 52.46% done, estimate finish Sat May 31 00:39:11 2008 > 52.48% done, estimate finish Sat May 31 00:39:10 2008 > 52.50% done, estimate finish Sat May 31 00:39:10 2008 > 52.53% done, estimate finish Sat May 31 00:39:09 2008 > 52.55% done, estimate finish Sat May 31 00:39:09 2008 > 52.57% done, estimate finish Sat May 31 00:39:11 2008 > 52.59% done, estimate finish Sat May 31 00:39:10 2008 > 52.62% done, estimate finish Sat May 31 00:39:10 2008 > 52.64% done, estimate finish Sat May 31 00:39:09 2008 > 52.66% done, estimate finish Sat May 31 00:39:09 2008 > 52.69% done, estimate finish Sat May 31 00:39:09 2008 > 52.71% done, estimate finish Sat May 31 00:39:10 2008 > 52.73% done, estimate finish Sat May 31 00:39:10 2008 > 52.75% done, estimate finish Sat May 31 00:39:09 2008 > 52.78% done, estimate finish Sat May 31 00:39:09 2008 > 52.80% done, estimate finish Sat May 31 00:39:09 2008 > 52.82% done, estimate finish Sat May 31 00:39:10 2008 > 52.84% done, estimate finish Sat May 31 00:39:10 2008 > 52.87% done, estimate finish Sat May 31 00:39:09 2008 > 52.89% done, estimate finish Sat May 31 00:39:09 2008 > 52.91% done, estimate finish Sat May 31 00:39:09 2008 > 52.94% done, estimate finish Sat May 31 00:39:08 2008 > 52.96% done, estimate finish Sat May 31 00:39:10 2008 > 52.98% done, estimate finish Sat May 31 00:39:09 2008 > 53.00% done, estimate finish Sat May 31 00:39:09 2008 > 53.03% done, estimate finish Sat May 31 00:39:09 2008 > 53.05% done, estimate finish Sat May 31 00:39:08 2008 > 53.07% done, estimate finish Sat May 31 00:39:10 2008 > 53.09% done, estimate finish Sat May 31 00:39:09 2008 > 53.12% done, estimate finish Sat May 31 00:39:09 2008 > 53.14% done, estimate finish Sat May 31 00:39:08 2008 > 53.16% done, estimate finish Sat May 31 00:39:08 2008 > 53.19% done, estimate finish Sat May 31 00:39:10 2008 > 53.21% done, estimate finish Sat May 31 00:39:09 2008 > 53.23% done, estimate finish Sat May 31 00:39:09 2008 > 53.25% done, estimate finish Sat May 31 00:39:08 2008 > 53.28% done, estimate finish Sat May 31 00:39:08 2008 > 53.30% done, estimate finish Sat May 31 00:39:08 2008 > 53.32% done, estimate finish Sat May 31 00:39:09 2008 > 53.34% done, estimate finish Sat May 31 00:39:09 2008 > 53.37% done, estimate finish Sat May 31 00:39:08 2008 > 53.39% done, estimate finish Sat May 31 00:39:08 2008 > 53.41% done, estimate finish Sat May 31 00:39:08 2008 > 53.44% done, estimate finish Sat May 31 00:39:09 2008 > 53.46% done, estimate finish Sat May 31 00:39:09 2008 > 53.48% done, estimate finish Sat May 31 00:39:08 2008 > 53.50% done, estimate finish Sat May 31 00:39:08 2008 > 53.53% done, estimate finish Sat May 31 00:39:08 2008 > 53.55% done, estimate finish Sat May 31 00:39:07 2008 > 53.57% done, estimate finish Sat May 31 00:39:09 2008 > 53.59% done, estimate finish Sat May 31 00:39:08 2008 > 53.62% done, estimate finish Sat May 31 00:39:08 2008 > 53.64% done, estimate finish Sat May 31 00:39:08 2008 > 53.66% done, estimate finish Sat May 31 00:39:07 2008 > 53.69% done, estimate finish Sat May 31 00:39:09 2008 > 53.71% done, estimate finish Sat May 31 00:39:08 2008 > 53.73% done, estimate finish Sat May 31 00:39:08 2008 > 53.75% done, estimate finish Sat May 31 00:39:08 2008 > 53.78% done, estimate finish Sat May 31 00:39:07 2008 > 53.80% done, estimate finish Sat May 31 00:39:07 2008 > 53.82% done, estimate finish Sat May 31 00:39:08 2008 > 53.84% done, estimate finish Sat May 31 00:39:08 2008 > 53.87% done, estimate finish Sat May 31 00:39:08 2008 > 53.89% done, estimate finish Sat May 31 00:39:07 2008 > 53.91% done, estimate finish Sat May 31 00:39:07 2008 > 53.93% done, estimate finish Sat May 31 00:39:08 2008 > 53.96% done, estimate finish Sat May 31 00:39:08 2008 > 53.98% done, estimate finish Sat May 31 00:39:08 2008 > 54.00% done, estimate finish Sat May 31 00:39:07 2008 > 54.03% done, estimate finish Sat May 31 00:39:07 2008 > 54.05% done, estimate finish Sat May 31 00:39:06 2008 > 54.07% done, estimate finish Sat May 31 00:39:08 2008 > 54.09% done, estimate finish Sat May 31 00:39:08 2008 > 54.12% done, estimate finish Sat May 31 00:39:07 2008 > 54.14% done, estimate finish Sat May 31 00:39:07 2008 > 54.16% done, estimate finish Sat May 31 00:39:06 2008 > 54.18% done, estimate finish Sat May 31 00:39:08 2008 > 54.21% done, estimate finish Sat May 31 00:39:08 2008 > 54.23% done, estimate finish Sat May 31 00:39:07 2008 > 54.25% done, estimate finish Sat May 31 00:39:07 2008 > 54.28% done, estimate finish Sat May 31 00:39:06 2008 > 54.30% done, estimate finish Sat May 31 00:39:06 2008 > 54.32% done, estimate finish Sat May 31 00:39:07 2008 > 54.34% done, estimate finish Sat May 31 00:39:07 2008 > 54.37% done, estimate finish Sat May 31 00:39:07 2008 > 54.39% done, estimate finish Sat May 31 00:39:06 2008 > 54.41% done, estimate finish Sat May 31 00:39:06 2008 > 54.43% done, estimate finish Sat May 31 00:39:07 2008 > 54.46% done, estimate finish Sat May 31 00:39:07 2008 > 54.48% done, estimate finish Sat May 31 00:39:07 2008 > 54.50% done, estimate finish Sat May 31 00:39:06 2008 > 54.53% done, estimate finish Sat May 31 00:39:06 2008 > 54.55% done, estimate finish Sat May 31 00:39:07 2008 > 54.57% done, estimate finish Sat May 31 00:39:07 2008 > 54.59% done, estimate finish Sat May 31 00:39:07 2008 > 54.62% done, estimate finish Sat May 31 00:39:06 2008 > 54.64% done, estimate finish Sat May 31 00:39:06 2008 > 54.66% done, estimate finish Sat May 31 00:39:06 2008 > 54.69% done, estimate finish Sat May 31 00:39:07 2008 > 54.71% done, estimate finish Sat May 31 00:39:07 2008 > 54.73% done, estimate finish Sat May 31 00:39:06 2008 > 54.75% done, estimate finish Sat May 31 00:39:06 2008 > 54.78% done, estimate finish Sat May 31 00:39:06 2008 > 54.80% done, estimate finish Sat May 31 00:39:07 2008 > 54.82% done, estimate finish Sat May 31 00:39:07 2008 > 54.84% done, estimate finish Sat May 31 00:39:06 2008 > 54.87% done, estimate finish Sat May 31 00:39:06 2008 > 54.89% done, estimate finish Sat May 31 00:39:06 2008 > 54.91% done, estimate finish Sat May 31 00:39:05 2008 > 54.93% done, estimate finish Sat May 31 00:39:07 2008 > 54.96% done, estimate finish Sat May 31 00:39:06 2008 > 54.98% done, estimate finish Sat May 31 00:39:06 2008 > 55.00% done, estimate finish Sat May 31 00:39:06 2008 > 55.03% done, estimate finish Sat May 31 00:39:05 2008 > 55.05% done, estimate finish Sat May 31 00:39:07 2008 > 55.07% done, estimate finish Sat May 31 00:39:06 2008 > 55.09% done, estimate finish Sat May 31 00:39:06 2008 > 55.12% done, estimate finish Sat May 31 00:39:06 2008 > 55.14% done, estimate finish Sat May 31 00:39:05 2008 > 55.16% done, estimate finish Sat May 31 00:39:05 2008 > 55.18% done, estimate finish Sat May 31 00:39:06 2008 > 55.21% done, estimate finish Sat May 31 00:39:06 2008 > 55.23% done, estimate finish Sat May 31 00:39:06 2008 > 55.25% done, estimate finish Sat May 31 00:39:05 2008 > 55.28% done, estimate finish Sat May 31 00:39:05 2008 > 55.30% done, estimate finish Sat May 31 00:39:06 2008 > 55.32% done, estimate finish Sat May 31 00:39:06 2008 > 55.34% done, estimate finish Sat May 31 00:39:05 2008 > 55.37% done, estimate finish Sat May 31 00:39:05 2008 > 55.39% done, estimate finish Sat May 31 00:39:05 2008 > 55.41% done, estimate finish Sat May 31 00:39:04 2008 > 55.43% done, estimate finish Sat May 31 00:39:06 2008 > 55.46% done, estimate finish Sat May 31 00:39:05 2008 > 55.48% done, estimate finish Sat May 31 00:39:05 2008 > 55.50% done, estimate finish Sat May 31 00:39:05 2008 > 55.53% done, estimate finish Sat May 31 00:39:04 2008 > 55.55% done, estimate finish Sat May 31 00:39:06 2008 > 55.57% done, estimate finish Sat May 31 00:39:05 2008 > 55.59% done, estimate finish Sat May 31 00:39:05 2008 > 55.62% done, estimate finish Sat May 31 00:39:05 2008 > 55.64% done, estimate finish Sat May 31 00:39:04 2008 > 55.66% done, estimate finish Sat May 31 00:39:04 2008 > 55.68% done, estimate finish Sat May 31 00:39:05 2008 > 55.71% done, estimate finish Sat May 31 00:39:05 2008 > 55.73% done, estimate finish Sat May 31 00:39:05 2008 > 55.75% done, estimate finish Sat May 31 00:39:04 2008 > 55.78% done, estimate finish Sat May 31 00:39:04 2008 > 55.80% done, estimate finish Sat May 31 00:39:05 2008 > 55.82% done, estimate finish Sat May 31 00:39:05 2008 > 55.84% done, estimate finish Sat May 31 00:39:05 2008 > 55.87% done, estimate finish Sat May 31 00:39:04 2008 > 55.89% done, estimate finish Sat May 31 00:39:04 2008 > 55.91% done, estimate finish Sat May 31 00:39:05 2008 > 55.93% done, estimate finish Sat May 31 00:39:05 2008 > 55.96% done, estimate finish Sat May 31 00:39:05 2008 > 55.98% done, estimate finish Sat May 31 00:39:04 2008 > 56.00% done, estimate finish Sat May 31 00:39:04 2008 > 56.02% done, estimate finish Sat May 31 00:39:04 2008 > 56.05% done, estimate finish Sat May 31 00:39:05 2008 > 56.07% done, estimate finish Sat May 31 00:39:05 2008 > 56.09% done, estimate finish Sat May 31 00:39:04 2008 > 56.12% done, estimate finish Sat May 31 00:39:04 2008 > 56.14% done, estimate finish Sat May 31 00:39:04 2008 > 56.16% done, estimate finish Sat May 31 00:39:05 2008 > 56.18% done, estimate finish Sat May 31 00:39:05 2008 > 56.21% done, estimate finish Sat May 31 00:39:04 2008 > 56.23% done, estimate finish Sat May 31 00:39:04 2008 > 56.25% done, estimate finish Sat May 31 00:39:04 2008 > 56.28% done, estimate finish Sat May 31 00:39:03 2008 > 56.30% done, estimate finish Sat May 31 00:39:05 2008 > 56.32% done, estimate finish Sat May 31 00:39:04 2008 > 56.34% done, estimate finish Sat May 31 00:39:04 2008 > 56.37% done, estimate finish Sat May 31 00:39:04 2008 > 56.39% done, estimate finish Sat May 31 00:39:03 2008 > 56.41% done, estimate finish Sat May 31 00:39:05 2008 > 56.43% done, estimate finish Sat May 31 00:39:04 2008 > 56.46% done, estimate finish Sat May 31 00:39:04 2008 > 56.48% done, estimate finish Sat May 31 00:39:04 2008 > 56.50% done, estimate finish Sat May 31 00:39:03 2008 > 56.53% done, estimate finish Sat May 31 00:39:05 2008 > 56.55% done, estimate finish Sat May 31 00:39:06 2008 > 56.57% done, estimate finish Sat May 31 00:39:06 2008 > 56.59% done, estimate finish Sat May 31 00:39:05 2008 > 56.62% done, estimate finish Sat May 31 00:39:05 2008 > 56.64% done, estimate finish Sat May 31 00:39:05 2008 > 56.66% done, estimate finish Sat May 31 00:39:06 2008 > 56.68% done, estimate finish Sat May 31 00:39:06 2008 > 56.71% done, estimate finish Sat May 31 00:39:05 2008 > 56.73% done, estimate finish Sat May 31 00:39:05 2008 > 56.75% done, estimate finish Sat May 31 00:39:05 2008 > 56.78% done, estimate finish Sat May 31 00:39:04 2008 > 56.80% done, estimate finish Sat May 31 00:39:06 2008 > 56.82% done, estimate finish Sat May 31 00:39:05 2008 > 56.84% done, estimate finish Sat May 31 00:39:05 2008 > 56.87% done, estimate finish Sat May 31 00:39:05 2008 > 56.89% done, estimate finish Sat May 31 00:39:04 2008 > 56.91% done, estimate finish Sat May 31 00:39:06 2008 > 56.93% done, estimate finish Sat May 31 00:39:05 2008 > 56.96% done, estimate finish Sat May 31 00:39:05 2008 > 56.98% done, estimate finish Sat May 31 00:39:05 2008 > 57.00% done, estimate finish Sat May 31 00:39:04 2008 > 57.03% done, estimate finish Sat May 31 00:39:04 2008 > 57.05% done, estimate finish Sat May 31 00:39:05 2008 > 57.07% done, estimate finish Sat May 31 00:39:05 2008 > 57.09% done, estimate finish Sat May 31 00:39:05 2008 > 57.12% done, estimate finish Sat May 31 00:39:04 2008 > 57.14% done, estimate finish Sat May 31 00:39:04 2008 > 57.16% done, estimate finish Sat May 31 00:39:05 2008 > 57.18% done, estimate finish Sat May 31 00:39:05 2008 > 57.21% done, estimate finish Sat May 31 00:39:05 2008 > 57.23% done, estimate finish Sat May 31 00:39:04 2008 > 57.25% done, estimate finish Sat May 31 00:39:04 2008 > 57.27% done, estimate finish Sat May 31 00:39:03 2008 > 57.30% done, estimate finish Sat May 31 00:39:05 2008 > 57.32% done, estimate finish Sat May 31 00:39:04 2008 > 57.34% done, estimate finish Sat May 31 00:39:04 2008 > 57.37% done, estimate finish Sat May 31 00:39:04 2008 > 57.39% done, estimate finish Sat May 31 00:39:03 2008 > 57.41% done, estimate finish Sat May 31 00:39:05 2008 > 57.43% done, estimate finish Sat May 31 00:39:04 2008 > 57.46% done, estimate finish Sat May 31 00:39:04 2008 > 57.48% done, estimate finish Sat May 31 00:39:04 2008 > 57.50% done, estimate finish Sat May 31 00:39:03 2008 > 57.52% done, estimate finish Sat May 31 00:39:05 2008 > 57.55% done, estimate finish Sat May 31 00:39:04 2008 > 57.57% done, estimate finish Sat May 31 00:39:04 2008 > 57.59% done, estimate finish Sat May 31 00:39:04 2008 > 57.62% done, estimate finish Sat May 31 00:39:03 2008 > 57.64% done, estimate finish Sat May 31 00:39:03 2008 > 57.66% done, estimate finish Sat May 31 00:39:04 2008 > 57.68% done, estimate finish Sat May 31 00:39:04 2008 > 57.71% done, estimate finish Sat May 31 00:39:04 2008 > 57.73% done, estimate finish Sat May 31 00:39:03 2008 > 57.75% done, estimate finish Sat May 31 00:39:03 2008 > 57.77% done, estimate finish Sat May 31 00:39:04 2008 > 57.80% done, estimate finish Sat May 31 00:39:04 2008 > 57.82% done, estimate finish Sat May 31 00:39:04 2008 > 57.84% done, estimate finish Sat May 31 00:39:03 2008 > 57.87% done, estimate finish Sat May 31 00:39:03 2008 > 57.89% done, estimate finish Sat May 31 00:39:03 2008 > 57.91% done, estimate finish Sat May 31 00:39:04 2008 > 57.93% done, estimate finish Sat May 31 00:39:04 2008 > 57.96% done, estimate finish Sat May 31 00:39:03 2008 > 57.98% done, estimate finish Sat May 31 00:39:03 2008 > 58.00% done, estimate finish Sat May 31 00:39:03 2008 > 58.02% done, estimate finish Sat May 31 00:39:04 2008 > 58.05% done, estimate finish Sat May 31 00:39:04 2008 > 58.07% done, estimate finish Sat May 31 00:39:03 2008 > 58.09% done, estimate finish Sat May 31 00:39:03 2008 > 58.12% done, estimate finish Sat May 31 00:39:03 2008 > 58.14% done, estimate finish Sat May 31 00:39:02 2008 > 58.16% done, estimate finish Sat May 31 00:39:04 2008 > 58.18% done, estimate finish Sat May 31 00:39:03 2008 > 58.21% done, estimate finish Sat May 31 00:39:03 2008 > 58.23% done, estimate finish Sat May 31 00:39:03 2008 > 58.25% done, estimate finish Sat May 31 00:39:02 2008 > 58.27% done, estimate finish Sat May 31 00:39:04 2008 > 58.30% done, estimate finish Sat May 31 00:39:03 2008 > 58.32% done, estimate finish Sat May 31 00:39:03 2008 > 58.34% done, estimate finish Sat May 31 00:39:03 2008 > 58.37% done, estimate finish Sat May 31 00:39:02 2008 > 58.39% done, estimate finish Sat May 31 00:39:02 2008 > 58.41% done, estimate finish Sat May 31 00:39:03 2008 > 58.43% done, estimate finish Sat May 31 00:39:03 2008 > 58.46% done, estimate finish Sat May 31 00:39:03 2008 > 58.48% done, estimate finish Sat May 31 00:39:02 2008 > 58.50% done, estimate finish Sat May 31 00:39:02 2008 > 58.52% done, estimate finish Sat May 31 00:39:03 2008 > 58.55% done, estimate finish Sat May 31 00:39:03 2008 > 58.57% done, estimate finish Sat May 31 00:39:03 2008 > 58.59% done, estimate finish Sat May 31 00:39:02 2008 > 58.62% done, estimate finish Sat May 31 00:39:02 2008 > 58.64% done, estimate finish Sat May 31 00:39:02 2008 > 58.66% done, estimate finish Sat May 31 00:39:03 2008 > 58.68% done, estimate finish Sat May 31 00:39:03 2008 > 58.71% done, estimate finish Sat May 31 00:39:02 2008 > 58.73% done, estimate finish Sat May 31 00:39:02 2008 > 58.75% done, estimate finish Sat May 31 00:39:02 2008 > 58.77% done, estimate finish Sat May 31 00:39:03 2008 > 58.80% done, estimate finish Sat May 31 00:39:03 2008 > 58.82% done, estimate finish Sat May 31 00:39:02 2008 > 58.84% done, estimate finish Sat May 31 00:39:02 2008 > 58.87% done, estimate finish Sat May 31 00:39:02 2008 > 58.89% done, estimate finish Sat May 31 00:39:03 2008 > 58.91% done, estimate finish Sat May 31 00:39:03 2008 > 58.93% done, estimate finish Sat May 31 00:39:02 2008 > 58.96% done, estimate finish Sat May 31 00:39:02 2008 > 58.98% done, estimate finish Sat May 31 00:39:02 2008 > 59.00% done, estimate finish Sat May 31 00:39:01 2008 > 59.02% done, estimate finish Sat May 31 00:39:03 2008 > 59.05% done, estimate finish Sat May 31 00:39:02 2008 > 59.07% done, estimate finish Sat May 31 00:39:02 2008 > 59.09% done, estimate finish Sat May 31 00:39:02 2008 > 59.12% done, estimate finish Sat May 31 00:39:01 2008 > 59.14% done, estimate finish Sat May 31 00:39:03 2008 > 59.16% done, estimate finish Sat May 31 00:39:02 2008 > 59.18% done, estimate finish Sat May 31 00:39:02 2008 > 59.21% done, estimate finish Sat May 31 00:39:02 2008 > 59.23% done, estimate finish Sat May 31 00:39:01 2008 > 59.25% done, estimate finish Sat May 31 00:39:01 2008 > 59.27% done, estimate finish Sat May 31 00:39:02 2008 > 59.30% done, estimate finish Sat May 31 00:39:02 2008 > 59.32% done, estimate finish Sat May 31 00:39:02 2008 > 59.34% done, estimate finish Sat May 31 00:39:01 2008 > 59.36% done, estimate finish Sat May 31 00:39:01 2008 > 59.39% done, estimate finish Sat May 31 00:39:02 2008 > 59.41% done, estimate finish Sat May 31 00:39:02 2008 > 59.43% done, estimate finish Sat May 31 00:39:02 2008 > 59.46% done, estimate finish Sat May 31 00:39:01 2008 > 59.48% done, estimate finish Sat May 31 00:39:01 2008 > 59.50% done, estimate finish Sat May 31 00:39:01 2008 > 59.52% done, estimate finish Sat May 31 00:39:02 2008 > 59.55% done, estimate finish Sat May 31 00:39:02 2008 > 59.57% done, estimate finish Sat May 31 00:39:01 2008 > 59.59% done, estimate finish Sat May 31 00:39:01 2008 > 59.61% done, estimate finish Sat May 31 00:39:01 2008 > 59.64% done, estimate finish Sat May 31 00:39:02 2008 > 59.66% done, estimate finish Sat May 31 00:39:02 2008 > 59.68% done, estimate finish Sat May 31 00:39:01 2008 > 59.71% done, estimate finish Sat May 31 00:39:01 2008 > 59.73% done, estimate finish Sat May 31 00:39:01 2008 > 59.75% done, estimate finish Sat May 31 00:39:00 2008 > 59.77% done, estimate finish Sat May 31 00:39:02 2008 > 59.80% done, estimate finish Sat May 31 00:39:01 2008 > 59.82% done, estimate finish Sat May 31 00:39:01 2008 > 59.84% done, estimate finish Sat May 31 00:39:00 2008 > 59.86% done, estimate finish Sat May 31 00:39:00 2008 > 59.89% done, estimate finish Sat May 31 00:39:01 2008 > 59.91% done, estimate finish Sat May 31 00:39:01 2008 > 59.93% done, estimate finish Sat May 31 00:39:01 2008 > 59.96% done, estimate finish Sat May 31 00:39:00 2008 > 59.98% done, estimate finish Sat May 31 00:39:00 2008 > 60.00% done, estimate finish Sat May 31 00:39:01 2008 > 60.02% done, estimate finish Sat May 31 00:39:01 2008 > 60.05% done, estimate finish Sat May 31 00:39:01 2008 > 60.07% done, estimate finish Sat May 31 00:39:00 2008 > 60.09% done, estimate finish Sat May 31 00:39:00 2008 > 60.11% done, estimate finish Sat May 31 00:39:00 2008 > 60.14% done, estimate finish Sat May 31 00:39:01 2008 > 60.16% done, estimate finish Sat May 31 00:39:01 2008 > 60.18% done, estimate finish Sat May 31 00:39:00 2008 > 60.21% done, estimate finish Sat May 31 00:39:00 2008 > 60.23% done, estimate finish Sat May 31 00:39:00 2008 > 60.25% done, estimate finish Sat May 31 00:39:01 2008 > 60.27% done, estimate finish Sat May 31 00:39:01 2008 > 60.30% done, estimate finish Sat May 31 00:39:00 2008 > 60.32% done, estimate finish Sat May 31 00:39:00 2008 > 60.34% done, estimate finish Sat May 31 00:39:00 2008 > 60.36% done, estimate finish Sat May 31 00:38:59 2008 > 60.39% done, estimate finish Sat May 31 00:39:01 2008 > 60.41% done, estimate finish Sat May 31 00:39:00 2008 > 60.43% done, estimate finish Sat May 31 00:39:00 2008 > 60.46% done, estimate finish Sat May 31 00:39:00 2008 > 60.48% done, estimate finish Sat May 31 00:38:59 2008 > 60.50% done, estimate finish Sat May 31 00:39:01 2008 > 60.52% done, estimate finish Sat May 31 00:39:00 2008 > 60.55% done, estimate finish Sat May 31 00:39:00 2008 > 60.57% done, estimate finish Sat May 31 00:39:00 2008 > 60.59% done, estimate finish Sat May 31 00:38:59 2008 > 60.61% done, estimate finish Sat May 31 00:38:59 2008 > 60.64% done, estimate finish Sat May 31 00:39:00 2008 > 60.66% done, estimate finish Sat May 31 00:39:00 2008 > 60.68% done, estimate finish Sat May 31 00:39:00 2008 > 60.71% done, estimate finish Sat May 31 00:38:59 2008 > 60.73% done, estimate finish Sat May 31 00:38:59 2008 > 60.75% done, estimate finish Sat May 31 00:39:00 2008 > 60.77% done, estimate finish Sat May 31 00:39:00 2008 > 60.80% done, estimate finish Sat May 31 00:39:00 2008 > 60.82% done, estimate finish Sat May 31 00:38:59 2008 > 60.84% done, estimate finish Sat May 31 00:38:59 2008 > 60.86% done, estimate finish Sat May 31 00:38:59 2008 > 60.89% done, estimate finish Sat May 31 00:39:00 2008 > 60.91% done, estimate finish Sat May 31 00:39:00 2008 > 60.93% done, estimate finish Sat May 31 00:38:59 2008 > 60.96% done, estimate finish Sat May 31 00:38:59 2008 > 60.98% done, estimate finish Sat May 31 00:38:59 2008 > 61.00% done, estimate finish Sat May 31 00:39:00 2008 > 61.02% done, estimate finish Sat May 31 00:39:00 2008 > 61.05% done, estimate finish Sat May 31 00:38:59 2008 > 61.07% done, estimate finish Sat May 31 00:38:59 2008 > 61.09% done, estimate finish Sat May 31 00:38:59 2008 > 61.11% done, estimate finish Sat May 31 00:39:00 2008 > 61.14% done, estimate finish Sat May 31 00:39:00 2008 > 61.16% done, estimate finish Sat May 31 00:38:59 2008 > 61.18% done, estimate finish Sat May 31 00:38:59 2008 > 61.21% done, estimate finish Sat May 31 00:38:59 2008 > 61.23% done, estimate finish Sat May 31 00:38:58 2008 > 61.25% done, estimate finish Sat May 31 00:39:00 2008 > 61.27% done, estimate finish Sat May 31 00:38:59 2008 > 61.30% done, estimate finish Sat May 31 00:38:59 2008 > 61.32% done, estimate finish Sat May 31 00:38:59 2008 > 61.34% done, estimate finish Sat May 31 00:38:58 2008 > 61.36% done, estimate finish Sat May 31 00:39:00 2008 > 61.39% done, estimate finish Sat May 31 00:38:59 2008 > 61.41% done, estimate finish Sat May 31 00:38:59 2008 > 61.43% done, estimate finish Sat May 31 00:38:59 2008 > 61.46% done, estimate finish Sat May 31 00:38:58 2008 > 61.48% done, estimate finish Sat May 31 00:38:58 2008 > 61.50% done, estimate finish Sat May 31 00:38:59 2008 > 61.52% done, estimate finish Sat May 31 00:38:59 2008 > 61.55% done, estimate finish Sat May 31 00:38:59 2008 > 61.57% done, estimate finish Sat May 31 00:38:58 2008 > 61.59% done, estimate finish Sat May 31 00:38:58 2008 > 61.61% done, estimate finish Sat May 31 00:38:59 2008 > 61.64% done, estimate finish Sat May 31 00:38:59 2008 > 61.66% done, estimate finish Sat May 31 00:38:59 2008 > 61.68% done, estimate finish Sat May 31 00:38:58 2008 > 61.70% done, estimate finish Sat May 31 00:38:58 2008 > 61.73% done, estimate finish Sat May 31 00:38:58 2008 > 61.75% done, estimate finish Sat May 31 00:38:59 2008 > 61.77% done, estimate finish Sat May 31 00:38:59 2008 > 61.80% done, estimate finish Sat May 31 00:38:58 2008 > 61.82% done, estimate finish Sat May 31 00:38:58 2008 > 61.84% done, estimate finish Sat May 31 00:38:58 2008 > 61.86% done, estimate finish Sat May 31 00:38:59 2008 > 61.89% done, estimate finish Sat May 31 00:38:59 2008 > 61.91% done, estimate finish Sat May 31 00:38:58 2008 > 61.93% done, estimate finish Sat May 31 00:38:58 2008 > 61.95% done, estimate finish Sat May 31 00:38:58 2008 > 61.98% done, estimate finish Sat May 31 00:38:57 2008 > 62.00% done, estimate finish Sat May 31 00:38:59 2008 > 62.02% done, estimate finish Sat May 31 00:38:58 2008 > 62.05% done, estimate finish Sat May 31 00:38:58 2008 > 62.07% done, estimate finish Sat May 31 00:38:58 2008 > 62.09% done, estimate finish Sat May 31 00:38:57 2008 > 62.11% done, estimate finish Sat May 31 00:38:59 2008 > 62.14% done, estimate finish Sat May 31 00:38:58 2008 > 62.16% done, estimate finish Sat May 31 00:38:58 2008 > 62.18% done, estimate finish Sat May 31 00:38:58 2008 > 62.20% done, estimate finish Sat May 31 00:38:57 2008 > 62.23% done, estimate finish Sat May 31 00:38:59 2008 > 62.25% done, estimate finish Sat May 31 00:38:58 2008 > 62.27% done, estimate finish Sat May 31 00:38:58 2008 > 62.30% done, estimate finish Sat May 31 00:38:58 2008 > 62.32% done, estimate finish Sat May 31 00:38:57 2008 > 62.34% done, estimate finish Sat May 31 00:38:57 2008 > 62.36% done, estimate finish Sat May 31 00:38:58 2008 > 62.39% done, estimate finish Sat May 31 00:38:58 2008 > 62.41% done, estimate finish Sat May 31 00:38:58 2008 > 62.43% done, estimate finish Sat May 31 00:38:57 2008 > 62.45% done, estimate finish Sat May 31 00:38:57 2008 > 62.48% done, estimate finish Sat May 31 00:38:58 2008 > 62.50% done, estimate finish Sat May 31 00:38:58 2008 > 62.52% done, estimate finish Sat May 31 00:38:58 2008 > 62.55% done, estimate finish Sat May 31 00:38:57 2008 > 62.57% done, estimate finish Sat May 31 00:38:57 2008 > 62.59% done, estimate finish Sat May 31 00:38:57 2008 > 62.61% done, estimate finish Sat May 31 00:38:58 2008 > 62.64% done, estimate finish Sat May 31 00:38:58 2008 > 62.66% done, estimate finish Sat May 31 00:38:57 2008 > 62.68% done, estimate finish Sat May 31 00:38:57 2008 > 62.70% done, estimate finish Sat May 31 00:38:57 2008 > 62.73% done, estimate finish Sat May 31 00:38:58 2008 > 62.75% done, estimate finish Sat May 31 00:38:58 2008 > 62.77% done, estimate finish Sat May 31 00:38:57 2008 > 62.80% done, estimate finish Sat May 31 00:38:57 2008 > 62.82% done, estimate finish Sat May 31 00:38:57 2008 > 62.84% done, estimate finish Sat May 31 00:38:56 2008 > 62.86% done, estimate finish Sat May 31 00:38:58 2008 > 62.89% done, estimate finish Sat May 31 00:38:57 2008 > 62.91% done, estimate finish Sat May 31 00:38:57 2008 > 62.93% done, estimate finish Sat May 31 00:38:57 2008 > 62.95% done, estimate finish Sat May 31 00:38:57 2008 > 62.98% done, estimate finish Sat May 31 00:38:58 2008 > 63.00% done, estimate finish Sat May 31 00:38:57 2008 > 63.02% done, estimate finish Sat May 31 00:38:57 2008 > 63.05% done, estimate finish Sat May 31 00:38:57 2008 > 63.07% done, estimate finish Sat May 31 00:38:57 2008 > 63.09% done, estimate finish Sat May 31 00:38:56 2008 > 63.11% done, estimate finish Sat May 31 00:38:57 2008 > 63.14% done, estimate finish Sat May 31 00:38:57 2008 > 63.16% done, estimate finish Sat May 31 00:38:57 2008 > 63.18% done, estimate finish Sat May 31 00:38:56 2008 > 63.20% done, estimate finish Sat May 31 00:38:56 2008 > 63.23% done, estimate finish Sat May 31 00:38:57 2008 > 63.25% done, estimate finish Sat May 31 00:38:57 2008 > 63.27% done, estimate finish Sat May 31 00:38:57 2008 > 63.30% done, estimate finish Sat May 31 00:38:57 2008 > 63.32% done, estimate finish Sat May 31 00:38:56 2008 > 63.34% done, estimate finish Sat May 31 00:38:56 2008 > 63.36% done, estimate finish Sat May 31 00:38:57 2008 > 63.39% done, estimate finish Sat May 31 00:38:57 2008 > 63.41% done, estimate finish Sat May 31 00:38:57 2008 > 63.43% done, estimate finish Sat May 31 00:38:58 2008 > 63.45% done, estimate finish Sat May 31 00:38:57 2008 > 63.48% done, estimate finish Sat May 31 00:38:59 2008 > 63.50% done, estimate finish Sat May 31 00:38:58 2008 > 63.52% done, estimate finish Sat May 31 00:38:58 2008 > 63.55% done, estimate finish Sat May 31 00:38:58 2008 > 63.57% done, estimate finish Sat May 31 00:38:57 2008 > 63.59% done, estimate finish Sat May 31 00:38:57 2008 > 63.61% done, estimate finish Sat May 31 00:38:58 2008 > 63.64% done, estimate finish Sat May 31 00:38:58 2008 > 63.66% done, estimate finish Sat May 31 00:38:58 2008 > 63.68% done, estimate finish Sat May 31 00:38:57 2008 > 63.70% done, estimate finish Sat May 31 00:38:57 2008 > 63.73% done, estimate finish Sat May 31 00:38:58 2008 > 63.75% done, estimate finish Sat May 31 00:38:58 2008 > 63.77% done, estimate finish Sat May 31 00:38:58 2008 > 63.79% done, estimate finish Sat May 31 00:38:57 2008 > 63.82% done, estimate finish Sat May 31 00:38:57 2008 > 63.84% done, estimate finish Sat May 31 00:38:57 2008 > 63.86% done, estimate finish Sat May 31 00:38:58 2008 > 63.89% done, estimate finish Sat May 31 00:38:58 2008 > 63.91% done, estimate finish Sat May 31 00:38:57 2008 > 63.93% done, estimate finish Sat May 31 00:38:57 2008 > 63.95% done, estimate finish Sat May 31 00:38:57 2008 > 63.98% done, estimate finish Sat May 31 00:38:58 2008 > 64.00% done, estimate finish Sat May 31 00:38:58 2008 > 64.02% done, estimate finish Sat May 31 00:38:57 2008 > 64.04% done, estimate finish Sat May 31 00:38:57 2008 > 64.07% done, estimate finish Sat May 31 00:38:57 2008 > 64.09% done, estimate finish Sat May 31 00:38:57 2008 > 64.11% done, estimate finish Sat May 31 00:38:58 2008 > 64.14% done, estimate finish Sat May 31 00:38:57 2008 > 64.16% done, estimate finish Sat May 31 00:38:57 2008 > 64.18% done, estimate finish Sat May 31 00:38:57 2008 > 64.20% done, estimate finish Sat May 31 00:38:57 2008 > 64.23% done, estimate finish Sat May 31 00:38:58 2008 > 64.25% done, estimate finish Sat May 31 00:38:57 2008 > 64.27% done, estimate finish Sat May 31 00:38:57 2008 > 64.30% done, estimate finish Sat May 31 00:38:57 2008 > 64.32% done, estimate finish Sat May 31 00:38:57 2008 > 64.34% done, estimate finish Sat May 31 00:38:56 2008 > 64.36% done, estimate finish Sat May 31 00:38:57 2008 > 64.39% done, estimate finish Sat May 31 00:38:57 2008 > 64.41% done, estimate finish Sat May 31 00:38:57 2008 > 64.43% done, estimate finish Sat May 31 00:38:57 2008 > 64.45% done, estimate finish Sat May 31 00:38:56 2008 > 64.48% done, estimate finish Sat May 31 00:38:57 2008 > 64.50% done, estimate finish Sat May 31 00:38:57 2008 > 64.52% done, estimate finish Sat May 31 00:38:57 2008 > 64.54% done, estimate finish Sat May 31 00:38:57 2008 > 64.57% done, estimate finish Sat May 31 00:38:56 2008 > 64.59% done, estimate finish Sat May 31 00:38:57 2008 > 64.61% done, estimate finish Sat May 31 00:38:57 2008 > 64.64% done, estimate finish Sat May 31 00:38:57 2008 > 64.66% done, estimate finish Sat May 31 00:38:57 2008 > 64.68% done, estimate finish Sat May 31 00:38:56 2008 > 64.70% done, estimate finish Sat May 31 00:38:56 2008 > 64.73% done, estimate finish Sat May 31 00:38:57 2008 > 64.75% done, estimate finish Sat May 31 00:38:57 2008 > 64.77% done, estimate finish Sat May 31 00:38:57 2008 > 64.79% done, estimate finish Sat May 31 00:38:56 2008 > 64.82% done, estimate finish Sat May 31 00:38:56 2008 > 64.84% done, estimate finish Sat May 31 00:38:57 2008 > 64.86% done, estimate finish Sat May 31 00:38:57 2008 > 64.89% done, estimate finish Sat May 31 00:38:57 2008 > 64.91% done, estimate finish Sat May 31 00:38:56 2008 > 64.93% done, estimate finish Sat May 31 00:38:56 2008 > 64.95% done, estimate finish Sat May 31 00:38:56 2008 > 64.98% done, estimate finish Sat May 31 00:38:57 2008 > 65.00% done, estimate finish Sat May 31 00:38:57 2008 > 65.02% done, estimate finish Sat May 31 00:38:56 2008 > 65.04% done, estimate finish Sat May 31 00:38:56 2008 > 65.07% done, estimate finish Sat May 31 00:38:56 2008 > 65.09% done, estimate finish Sat May 31 00:38:57 2008 > 65.11% done, estimate finish Sat May 31 00:38:57 2008 > 65.14% done, estimate finish Sat May 31 00:38:56 2008 > 65.16% done, estimate finish Sat May 31 00:38:56 2008 > 65.18% done, estimate finish Sat May 31 00:38:56 2008 > 65.20% done, estimate finish Sat May 31 00:38:55 2008 > 65.23% done, estimate finish Sat May 31 00:38:57 2008 > 65.25% done, estimate finish Sat May 31 00:38:56 2008 > 65.27% done, estimate finish Sat May 31 00:38:56 2008 > 65.29% done, estimate finish Sat May 31 00:38:56 2008 > 65.32% done, estimate finish Sat May 31 00:38:55 2008 > 65.34% done, estimate finish Sat May 31 00:38:57 2008 > 65.36% done, estimate finish Sat May 31 00:38:56 2008 > 65.39% done, estimate finish Sat May 31 00:38:56 2008 > 65.41% done, estimate finish Sat May 31 00:38:56 2008 > 65.43% done, estimate finish Sat May 31 00:38:55 2008 > 65.45% done, estimate finish Sat May 31 00:38:55 2008 > 65.48% done, estimate finish Sat May 31 00:38:56 2008 > 65.50% done, estimate finish Sat May 31 00:38:56 2008 > 65.52% done, estimate finish Sat May 31 00:38:56 2008 > 65.54% done, estimate finish Sat May 31 00:38:55 2008 > 65.57% done, estimate finish Sat May 31 00:38:55 2008 > 65.59% done, estimate finish Sat May 31 00:38:56 2008 > 65.61% done, estimate finish Sat May 31 00:38:56 2008 > 65.64% done, estimate finish Sat May 31 00:38:56 2008 > 65.66% done, estimate finish Sat May 31 00:38:55 2008 > 65.68% done, estimate finish Sat May 31 00:38:55 2008 > 65.70% done, estimate finish Sat May 31 00:38:55 2008 > 65.73% done, estimate finish Sat May 31 00:38:56 2008 > 65.75% done, estimate finish Sat May 31 00:38:56 2008 > 65.77% done, estimate finish Sat May 31 00:38:55 2008 > 65.79% done, estimate finish Sat May 31 00:38:55 2008 > 65.82% done, estimate finish Sat May 31 00:38:55 2008 > 65.84% done, estimate finish Sat May 31 00:38:56 2008 > 65.86% done, estimate finish Sat May 31 00:38:56 2008 > 65.89% done, estimate finish Sat May 31 00:38:55 2008 > 65.91% done, estimate finish Sat May 31 00:38:55 2008 > 65.93% done, estimate finish Sat May 31 00:38:55 2008 > 65.95% done, estimate finish Sat May 31 00:38:56 2008 > 65.98% done, estimate finish Sat May 31 00:38:56 2008 > 66.00% done, estimate finish Sat May 31 00:38:55 2008 > 66.02% done, estimate finish Sat May 31 00:38:55 2008 > 66.04% done, estimate finish Sat May 31 00:38:55 2008 > 66.07% done, estimate finish Sat May 31 00:38:54 2008 > 66.09% done, estimate finish Sat May 31 00:38:56 2008 > 66.11% done, estimate finish Sat May 31 00:38:55 2008 > 66.14% done, estimate finish Sat May 31 00:38:55 2008 > 66.16% done, estimate finish Sat May 31 00:38:55 2008 > 66.18% done, estimate finish Sat May 31 00:38:54 2008 > 66.20% done, estimate finish Sat May 31 00:38:56 2008 > 66.23% done, estimate finish Sat May 31 00:38:55 2008 > 66.25% done, estimate finish Sat May 31 00:38:55 2008 > 66.27% done, estimate finish Sat May 31 00:38:55 2008 > 66.29% done, estimate finish Sat May 31 00:38:54 2008 > 66.32% done, estimate finish Sat May 31 00:38:54 2008 > 66.34% done, estimate finish Sat May 31 00:38:55 2008 > 66.36% done, estimate finish Sat May 31 00:38:55 2008 > 66.39% done, estimate finish Sat May 31 00:38:55 2008 > 66.41% done, estimate finish Sat May 31 00:38:54 2008 > 66.43% done, estimate finish Sat May 31 00:38:54 2008 > 66.45% done, estimate finish Sat May 31 00:38:55 2008 > 66.48% done, estimate finish Sat May 31 00:38:55 2008 > 66.50% done, estimate finish Sat May 31 00:38:55 2008 > 66.52% done, estimate finish Sat May 31 00:38:54 2008 > 66.54% done, estimate finish Sat May 31 00:38:54 2008 > 66.57% done, estimate finish Sat May 31 00:38:54 2008 > 66.59% done, estimate finish Sat May 31 00:38:55 2008 > 66.61% done, estimate finish Sat May 31 00:38:55 2008 > 66.64% done, estimate finish Sat May 31 00:38:54 2008 > 66.66% done, estimate finish Sat May 31 00:38:54 2008 > 66.68% done, estimate finish Sat May 31 00:38:54 2008 > 66.70% done, estimate finish Sat May 31 00:38:55 2008 > 66.73% done, estimate finish Sat May 31 00:38:55 2008 > 66.75% done, estimate finish Sat May 31 00:38:54 2008 > 66.77% done, estimate finish Sat May 31 00:38:54 2008 > 66.79% done, estimate finish Sat May 31 00:38:54 2008 > 66.82% done, estimate finish Sat May 31 00:38:54 2008 > 66.84% done, estimate finish Sat May 31 00:38:55 2008 > 66.86% done, estimate finish Sat May 31 00:38:54 2008 > 66.88% done, estimate finish Sat May 31 00:38:54 2008 > 66.91% done, estimate finish Sat May 31 00:38:54 2008 > 66.93% done, estimate finish Sat May 31 00:38:54 2008 > 66.95% done, estimate finish Sat May 31 00:38:55 2008 > 66.98% done, estimate finish Sat May 31 00:38:54 2008 > 67.00% done, estimate finish Sat May 31 00:38:54 2008 > 67.02% done, estimate finish Sat May 31 00:38:54 2008 > 67.04% done, estimate finish Sat May 31 00:38:54 2008 > 67.07% done, estimate finish Sat May 31 00:38:55 2008 > 67.09% done, estimate finish Sat May 31 00:38:54 2008 > 67.11% done, estimate finish Sat May 31 00:38:54 2008 > 67.13% done, estimate finish Sat May 31 00:38:54 2008 > 67.16% done, estimate finish Sat May 31 00:38:54 2008 > 67.18% done, estimate finish Sat May 31 00:38:53 2008 > 67.20% done, estimate finish Sat May 31 00:38:54 2008 > 67.23% done, estimate finish Sat May 31 00:38:54 2008 > 67.25% done, estimate finish Sat May 31 00:38:54 2008 > 67.27% done, estimate finish Sat May 31 00:38:54 2008 > 67.29% done, estimate finish Sat May 31 00:38:53 2008 > 67.32% done, estimate finish Sat May 31 00:38:54 2008 > 67.34% done, estimate finish Sat May 31 00:38:54 2008 > 67.36% done, estimate finish Sat May 31 00:38:54 2008 > 67.39% done, estimate finish Sat May 31 00:38:54 2008 > 67.41% done, estimate finish Sat May 31 00:38:53 2008 > 67.43% done, estimate finish Sat May 31 00:38:53 2008 > 67.45% done, estimate finish Sat May 31 00:38:54 2008 > 67.48% done, estimate finish Sat May 31 00:38:54 2008 > 67.50% done, estimate finish Sat May 31 00:38:54 2008 > 67.52% done, estimate finish Sat May 31 00:38:53 2008 > 67.54% done, estimate finish Sat May 31 00:38:53 2008 > 67.57% done, estimate finish Sat May 31 00:38:54 2008 > 67.59% done, estimate finish Sat May 31 00:38:54 2008 > 67.61% done, estimate finish Sat May 31 00:38:54 2008 > 67.63% done, estimate finish Sat May 31 00:38:53 2008 > 67.66% done, estimate finish Sat May 31 00:38:53 2008 > 67.68% done, estimate finish Sat May 31 00:38:53 2008 > 67.70% done, estimate finish Sat May 31 00:38:54 2008 > 67.73% done, estimate finish Sat May 31 00:38:54 2008 > 67.75% done, estimate finish Sat May 31 00:38:53 2008 > 67.77% done, estimate finish Sat May 31 00:38:53 2008 > 67.79% done, estimate finish Sat May 31 00:38:53 2008 > 67.82% done, estimate finish Sat May 31 00:38:54 2008 > 67.84% done, estimate finish Sat May 31 00:38:54 2008 > 67.86% done, estimate finish Sat May 31 00:38:53 2008 > 67.88% done, estimate finish Sat May 31 00:38:53 2008 > 67.91% done, estimate finish Sat May 31 00:38:53 2008 > 67.93% done, estimate finish Sat May 31 00:38:52 2008 > 67.95% done, estimate finish Sat May 31 00:38:54 2008 > 67.98% done, estimate finish Sat May 31 00:38:53 2008 > 68.00% done, estimate finish Sat May 31 00:38:53 2008 > 68.02% done, estimate finish Sat May 31 00:38:53 2008 > 68.04% done, estimate finish Sat May 31 00:38:52 2008 > 68.07% done, estimate finish Sat May 31 00:38:54 2008 > 68.09% done, estimate finish Sat May 31 00:38:53 2008 > 68.11% done, estimate finish Sat May 31 00:38:53 2008 > 68.13% done, estimate finish Sat May 31 00:38:53 2008 > 68.16% done, estimate finish Sat May 31 00:38:52 2008 > 68.18% done, estimate finish Sat May 31 00:38:54 2008 > 68.20% done, estimate finish Sat May 31 00:38:53 2008 > 68.23% done, estimate finish Sat May 31 00:38:53 2008 > 68.25% done, estimate finish Sat May 31 00:38:53 2008 > 68.27% done, estimate finish Sat May 31 00:38:52 2008 > 68.29% done, estimate finish Sat May 31 00:38:52 2008 > 68.32% done, estimate finish Sat May 31 00:38:53 2008 > 68.34% done, estimate finish Sat May 31 00:38:53 2008 > 68.36% done, estimate finish Sat May 31 00:38:53 2008 > 68.38% done, estimate finish Sat May 31 00:38:52 2008 > 68.41% done, estimate finish Sat May 31 00:38:52 2008 > 68.43% done, estimate finish Sat May 31 00:38:53 2008 > 68.45% done, estimate finish Sat May 31 00:38:53 2008 > 68.47% done, estimate finish Sat May 31 00:38:53 2008 > 68.50% done, estimate finish Sat May 31 00:38:52 2008 > 68.52% done, estimate finish Sat May 31 00:38:52 2008 > 68.54% done, estimate finish Sat May 31 00:38:52 2008 > 68.57% done, estimate finish Sat May 31 00:38:53 2008 > 68.59% done, estimate finish Sat May 31 00:38:53 2008 > 68.61% done, estimate finish Sat May 31 00:38:52 2008 > 68.63% done, estimate finish Sat May 31 00:38:52 2008 > 68.66% done, estimate finish Sat May 31 00:38:52 2008 > 68.68% done, estimate finish Sat May 31 00:38:53 2008 > 68.70% done, estimate finish Sat May 31 00:38:53 2008 > 68.73% done, estimate finish Sat May 31 00:38:52 2008 > 68.75% done, estimate finish Sat May 31 00:38:52 2008 > 68.77% done, estimate finish Sat May 31 00:38:52 2008 > 68.79% done, estimate finish Sat May 31 00:38:52 2008 > 68.82% done, estimate finish Sat May 31 00:38:53 2008 > 68.84% done, estimate finish Sat May 31 00:38:52 2008 > 68.86% done, estimate finish Sat May 31 00:38:52 2008 > 68.88% done, estimate finish Sat May 31 00:38:52 2008 > 68.91% done, estimate finish Sat May 31 00:38:52 2008 > 68.93% done, estimate finish Sat May 31 00:38:53 2008 > 68.95% done, estimate finish Sat May 31 00:38:52 2008 > 68.98% done, estimate finish Sat May 31 00:38:52 2008 > 69.00% done, estimate finish Sat May 31 00:38:52 2008 > 69.02% done, estimate finish Sat May 31 00:38:52 2008 > 69.04% done, estimate finish Sat May 31 00:38:51 2008 > 69.07% done, estimate finish Sat May 31 00:38:52 2008 > 69.09% done, estimate finish Sat May 31 00:38:52 2008 > 69.11% done, estimate finish Sat May 31 00:38:52 2008 > 69.13% done, estimate finish Sat May 31 00:38:52 2008 > 69.16% done, estimate finish Sat May 31 00:38:51 2008 > 69.18% done, estimate finish Sat May 31 00:38:52 2008 > 69.20% done, estimate finish Sat May 31 00:38:52 2008 > 69.22% done, estimate finish Sat May 31 00:38:52 2008 > 69.25% done, estimate finish Sat May 31 00:38:52 2008 > 69.27% done, estimate finish Sat May 31 00:38:51 2008 > 69.29% done, estimate finish Sat May 31 00:38:52 2008 > 69.32% done, estimate finish Sat May 31 00:38:52 2008 > 69.34% done, estimate finish Sat May 31 00:38:52 2008 > 69.36% done, estimate finish Sat May 31 00:38:52 2008 > 69.38% done, estimate finish Sat May 31 00:38:51 2008 > 69.41% done, estimate finish Sat May 31 00:38:51 2008 > 69.43% done, estimate finish Sat May 31 00:38:52 2008 > 69.45% done, estimate finish Sat May 31 00:38:52 2008 > 69.47% done, estimate finish Sat May 31 00:38:52 2008 > 69.50% done, estimate finish Sat May 31 00:38:51 2008 > 69.52% done, estimate finish Sat May 31 00:38:51 2008 > 69.54% done, estimate finish Sat May 31 00:38:52 2008 > 69.57% done, estimate finish Sat May 31 00:38:52 2008 > 69.59% done, estimate finish Sat May 31 00:38:52 2008 > 69.61% done, estimate finish Sat May 31 00:38:51 2008 > 69.63% done, estimate finish Sat May 31 00:38:51 2008 > 69.66% done, estimate finish Sat May 31 00:38:51 2008 > 69.68% done, estimate finish Sat May 31 00:38:52 2008 > 69.70% done, estimate finish Sat May 31 00:38:52 2008 > 69.72% done, estimate finish Sat May 31 00:38:51 2008 > 69.75% done, estimate finish Sat May 31 00:38:51 2008 > 69.77% done, estimate finish Sat May 31 00:38:51 2008 > 69.79% done, estimate finish Sat May 31 00:38:52 2008 > 69.82% done, estimate finish Sat May 31 00:38:52 2008 > 69.84% done, estimate finish Sat May 31 00:38:51 2008 > 69.86% done, estimate finish Sat May 31 00:38:51 2008 > 69.88% done, estimate finish Sat May 31 00:38:51 2008 > 69.91% done, estimate finish Sat May 31 00:38:51 2008 > 69.93% done, estimate finish Sat May 31 00:38:52 2008 > 69.95% done, estimate finish Sat May 31 00:38:51 2008 > 69.97% done, estimate finish Sat May 31 00:38:51 2008 > 70.00% done, estimate finish Sat May 31 00:38:51 2008 > 70.02% done, estimate finish Sat May 31 00:38:51 2008 > 70.04% done, estimate finish Sat May 31 00:38:52 2008 > 70.07% done, estimate finish Sat May 31 00:38:51 2008 > 70.09% done, estimate finish Sat May 31 00:38:51 2008 > 70.11% done, estimate finish Sat May 31 00:38:51 2008 > 70.13% done, estimate finish Sat May 31 00:38:51 2008 > 70.16% done, estimate finish Sat May 31 00:38:50 2008 > 70.18% done, estimate finish Sat May 31 00:38:51 2008 > 70.20% done, estimate finish Sat May 31 00:38:51 2008 > 70.22% done, estimate finish Sat May 31 00:38:51 2008 > 70.25% done, estimate finish Sat May 31 00:38:51 2008 > 70.27% done, estimate finish Sat May 31 00:38:50 2008 > 70.29% done, estimate finish Sat May 31 00:38:51 2008 > 70.32% done, estimate finish Sat May 31 00:38:53 2008 > 70.34% done, estimate finish Sat May 31 00:38:52 2008 > 70.36% done, estimate finish Sat May 31 00:38:52 2008 > 70.38% done, estimate finish Sat May 31 00:38:52 2008 > 70.41% done, estimate finish Sat May 31 00:38:51 2008 > 70.43% done, estimate finish Sat May 31 00:38:53 2008 > 70.45% done, estimate finish Sat May 31 00:38:52 2008 > 70.47% done, estimate finish Sat May 31 00:38:52 2008 > 70.50% done, estimate finish Sat May 31 00:38:52 2008 > 70.52% done, estimate finish Sat May 31 00:38:51 2008 > 70.54% done, estimate finish Sat May 31 00:38:53 2008 > 70.57% done, estimate finish Sat May 31 00:38:52 2008 > 70.59% done, estimate finish Sat May 31 00:38:52 2008 > 70.61% done, estimate finish Sat May 31 00:38:52 2008 > 70.63% done, estimate finish Sat May 31 00:38:51 2008 > 70.66% done, estimate finish Sat May 31 00:38:51 2008 > 70.68% done, estimate finish Sat May 31 00:38:52 2008 > 70.70% done, estimate finish Sat May 31 00:38:52 2008 > 70.72% done, estimate finish Sat May 31 00:38:52 2008 > 70.75% done, estimate finish Sat May 31 00:38:51 2008 > 70.77% done, estimate finish Sat May 31 00:38:51 2008 > 70.79% done, estimate finish Sat May 31 00:38:52 2008 > 70.82% done, estimate finish Sat May 31 00:38:52 2008 > 70.84% done, estimate finish Sat May 31 00:38:52 2008 > 70.86% done, estimate finish Sat May 31 00:38:51 2008 > 70.88% done, estimate finish Sat May 31 00:38:51 2008 > 70.91% done, estimate finish Sat May 31 00:38:51 2008 > 70.93% done, estimate finish Sat May 31 00:38:52 2008 > 70.95% done, estimate finish Sat May 31 00:38:52 2008 > 70.97% done, estimate finish Sat May 31 00:38:51 2008 > 71.00% done, estimate finish Sat May 31 00:38:51 2008 > 71.02% done, estimate finish Sat May 31 00:38:51 2008 > 71.04% done, estimate finish Sat May 31 00:38:52 2008 > 71.07% done, estimate finish Sat May 31 00:38:52 2008 > 71.09% done, estimate finish Sat May 31 00:38:51 2008 > 71.11% done, estimate finish Sat May 31 00:38:51 2008 > 71.13% done, estimate finish Sat May 31 00:38:51 2008 > 71.16% done, estimate finish Sat May 31 00:38:51 2008 > 71.18% done, estimate finish Sat May 31 00:38:52 2008 > 71.20% done, estimate finish Sat May 31 00:38:51 2008 > 71.22% done, estimate finish Sat May 31 00:38:51 2008 > 71.25% done, estimate finish Sat May 31 00:38:51 2008 > 71.27% done, estimate finish Sat May 31 00:38:51 2008 > 71.29% done, estimate finish Sat May 31 00:38:52 2008 > 71.32% done, estimate finish Sat May 31 00:38:51 2008 > 71.34% done, estimate finish Sat May 31 00:38:51 2008 > 71.36% done, estimate finish Sat May 31 00:38:51 2008 > 71.38% done, estimate finish Sat May 31 00:38:51 2008 > 71.41% done, estimate finish Sat May 31 00:38:52 2008 > 71.43% done, estimate finish Sat May 31 00:38:51 2008 > 71.45% done, estimate finish Sat May 31 00:38:51 2008 > 71.47% done, estimate finish Sat May 31 00:38:51 2008 > 71.50% done, estimate finish Sat May 31 00:38:51 2008 > 71.52% done, estimate finish Sat May 31 00:38:50 2008 > 71.54% done, estimate finish Sat May 31 00:38:52 2008 > 71.56% done, estimate finish Sat May 31 00:38:51 2008 > 71.59% done, estimate finish Sat May 31 00:38:51 2008 > 71.61% done, estimate finish Sat May 31 00:38:51 2008 > 71.63% done, estimate finish Sat May 31 00:38:50 2008 > 71.66% done, estimate finish Sat May 31 00:38:52 2008 > 71.68% done, estimate finish Sat May 31 00:38:51 2008 > 71.70% done, estimate finish Sat May 31 00:38:51 2008 > 71.72% done, estimate finish Sat May 31 00:38:51 2008 > 71.75% done, estimate finish Sat May 31 00:38:50 2008 > 71.77% done, estimate finish Sat May 31 00:38:50 2008 > 71.79% done, estimate finish Sat May 31 00:38:51 2008 > 71.82% done, estimate finish Sat May 31 00:38:51 2008 > 71.84% done, estimate finish Sat May 31 00:38:51 2008 > 71.86% done, estimate finish Sat May 31 00:38:50 2008 > 71.88% done, estimate finish Sat May 31 00:38:50 2008 > 71.91% done, estimate finish Sat May 31 00:38:51 2008 > 71.93% done, estimate finish Sat May 31 00:38:51 2008 > 71.95% done, estimate finish Sat May 31 00:38:51 2008 > 71.97% done, estimate finish Sat May 31 00:38:50 2008 > 72.00% done, estimate finish Sat May 31 00:38:50 2008 > 72.02% done, estimate finish Sat May 31 00:38:51 2008 > 72.04% done, estimate finish Sat May 31 00:38:51 2008 > 72.06% done, estimate finish Sat May 31 00:38:51 2008 > 72.09% done, estimate finish Sat May 31 00:38:50 2008 > 72.11% done, estimate finish Sat May 31 00:38:50 2008 > 72.13% done, estimate finish Sat May 31 00:38:50 2008 > 72.16% done, estimate finish Sat May 31 00:38:51 2008 > 72.18% done, estimate finish Sat May 31 00:38:51 2008 > 72.20% done, estimate finish Sat May 31 00:38:50 2008 > 72.22% done, estimate finish Sat May 31 00:38:50 2008 > 72.25% done, estimate finish Sat May 31 00:38:50 2008 > 72.27% done, estimate finish Sat May 31 00:38:51 2008 > 72.29% done, estimate finish Sat May 31 00:38:51 2008 > 72.31% done, estimate finish Sat May 31 00:38:50 2008 > 72.34% done, estimate finish Sat May 31 00:38:50 2008 > 72.36% done, estimate finish Sat May 31 00:38:50 2008 > 72.38% done, estimate finish Sat May 31 00:38:50 2008 > 72.41% done, estimate finish Sat May 31 00:38:51 2008 > 72.43% done, estimate finish Sat May 31 00:38:50 2008 > 72.45% done, estimate finish Sat May 31 00:38:50 2008 > 72.47% done, estimate finish Sat May 31 00:38:50 2008 > 72.50% done, estimate finish Sat May 31 00:38:50 2008 > 72.52% done, estimate finish Sat May 31 00:38:51 2008 > 72.54% done, estimate finish Sat May 31 00:38:50 2008 > 72.56% done, estimate finish Sat May 31 00:38:50 2008 > 72.59% done, estimate finish Sat May 31 00:38:50 2008 > 72.61% done, estimate finish Sat May 31 00:38:50 2008 > 72.63% done, estimate finish Sat May 31 00:38:49 2008 > 72.66% done, estimate finish Sat May 31 00:38:50 2008 > 72.68% done, estimate finish Sat May 31 00:38:50 2008 > 72.70% done, estimate finish Sat May 31 00:38:50 2008 > 72.72% done, estimate finish Sat May 31 00:38:50 2008 > 72.75% done, estimate finish Sat May 31 00:38:49 2008 > 72.77% done, estimate finish Sat May 31 00:38:50 2008 > 72.79% done, estimate finish Sat May 31 00:38:50 2008 > 72.81% done, estimate finish Sat May 31 00:38:50 2008 > 72.84% done, estimate finish Sat May 31 00:38:50 2008 > 72.86% done, estimate finish Sat May 31 00:38:49 2008 > 72.88% done, estimate finish Sat May 31 00:38:49 2008 > 72.91% done, estimate finish Sat May 31 00:38:50 2008 > 72.93% done, estimate finish Sat May 31 00:38:50 2008 > 72.95% done, estimate finish Sat May 31 00:38:50 2008 > 72.97% done, estimate finish Sat May 31 00:38:49 2008 > 73.00% done, estimate finish Sat May 31 00:38:49 2008 > 73.02% done, estimate finish Sat May 31 00:38:50 2008 > 73.04% done, estimate finish Sat May 31 00:38:50 2008 > 73.06% done, estimate finish Sat May 31 00:38:50 2008 > 73.09% done, estimate finish Sat May 31 00:38:49 2008 > 73.11% done, estimate finish Sat May 31 00:38:49 2008 > 73.13% done, estimate finish Sat May 31 00:38:49 2008 > 73.16% done, estimate finish Sat May 31 00:38:50 2008 > 73.18% done, estimate finish Sat May 31 00:38:50 2008 > 73.20% done, estimate finish Sat May 31 00:38:49 2008 > 73.22% done, estimate finish Sat May 31 00:38:49 2008 > 73.25% done, estimate finish Sat May 31 00:38:49 2008 > 73.27% done, estimate finish Sat May 31 00:38:50 2008 > 73.29% done, estimate finish Sat May 31 00:38:50 2008 > 73.31% done, estimate finish Sat May 31 00:38:49 2008 > 73.34% done, estimate finish Sat May 31 00:38:49 2008 > 73.36% done, estimate finish Sat May 31 00:38:49 2008 > 73.38% done, estimate finish Sat May 31 00:38:49 2008 > 73.41% done, estimate finish Sat May 31 00:38:50 2008 > 73.43% done, estimate finish Sat May 31 00:38:49 2008 > 73.45% done, estimate finish Sat May 31 00:38:49 2008 > 73.47% done, estimate finish Sat May 31 00:38:49 2008 > 73.50% done, estimate finish Sat May 31 00:38:49 2008 > 73.52% done, estimate finish Sat May 31 00:38:50 2008 > 73.54% done, estimate finish Sat May 31 00:38:49 2008 > 73.56% done, estimate finish Sat May 31 00:38:49 2008 > 73.59% done, estimate finish Sat May 31 00:38:49 2008 > 73.61% done, estimate finish Sat May 31 00:38:49 2008 > 73.63% done, estimate finish Sat May 31 00:38:50 2008 > 73.65% done, estimate finish Sat May 31 00:38:49 2008 > 73.68% done, estimate finish Sat May 31 00:38:49 2008 > 73.70% done, estimate finish Sat May 31 00:38:49 2008 > 73.72% done, estimate finish Sat May 31 00:38:49 2008 > 73.75% done, estimate finish Sat May 31 00:38:48 2008 > 73.77% done, estimate finish Sat May 31 00:38:49 2008 > 73.79% done, estimate finish Sat May 31 00:38:49 2008 > 73.81% done, estimate finish Sat May 31 00:38:49 2008 > 73.84% done, estimate finish Sat May 31 00:38:49 2008 > 73.86% done, estimate finish Sat May 31 00:38:48 2008 > 73.88% done, estimate finish Sat May 31 00:38:50 2008 > 73.90% done, estimate finish Sat May 31 00:38:49 2008 > 73.93% done, estimate finish Sat May 31 00:38:49 2008 > 73.95% done, estimate finish Sat May 31 00:38:49 2008 > 73.97% done, estimate finish Sat May 31 00:38:48 2008 > 74.00% done, estimate finish Sat May 31 00:38:48 2008 > 74.02% done, estimate finish Sat May 31 00:38:49 2008 > 74.04% done, estimate finish Sat May 31 00:38:49 2008 > 74.06% done, estimate finish Sat May 31 00:38:49 2008 > 74.09% done, estimate finish Sat May 31 00:38:48 2008 > 74.11% done, estimate finish Sat May 31 00:38:48 2008 > 74.13% done, estimate finish Sat May 31 00:38:49 2008 > 74.16% done, estimate finish Sat May 31 00:38:49 2008 > 74.18% done, estimate finish Sat May 31 00:38:49 2008 > 74.20% done, estimate finish Sat May 31 00:38:48 2008 > 74.22% done, estimate finish Sat May 31 00:38:48 2008 > 74.25% done, estimate finish Sat May 31 00:38:48 2008 > 74.27% done, estimate finish Sat May 31 00:38:49 2008 > 74.29% done, estimate finish Sat May 31 00:38:49 2008 > 74.31% done, estimate finish Sat May 31 00:38:48 2008 > 74.34% done, estimate finish Sat May 31 00:38:48 2008 > 74.36% done, estimate finish Sat May 31 00:38:48 2008 > 74.38% done, estimate finish Sat May 31 00:38:49 2008 > 74.41% done, estimate finish Sat May 31 00:38:49 2008 > 74.43% done, estimate finish Sat May 31 00:38:48 2008 > 74.45% done, estimate finish Sat May 31 00:38:48 2008 > 74.47% done, estimate finish Sat May 31 00:38:48 2008 > 74.50% done, estimate finish Sat May 31 00:38:48 2008 > 74.52% done, estimate finish Sat May 31 00:38:49 2008 > 74.54% done, estimate finish Sat May 31 00:38:49 2008 > 74.56% done, estimate finish Sat May 31 00:38:48 2008 > 74.59% done, estimate finish Sat May 31 00:38:48 2008 > 74.61% done, estimate finish Sat May 31 00:38:48 2008 > 74.63% done, estimate finish Sat May 31 00:38:49 2008 > 74.65% done, estimate finish Sat May 31 00:38:49 2008 > 74.68% done, estimate finish Sat May 31 00:38:48 2008 > 74.70% done, estimate finish Sat May 31 00:38:48 2008 > 74.72% done, estimate finish Sat May 31 00:38:48 2008 > 74.75% done, estimate finish Sat May 31 00:38:49 2008 > 74.77% done, estimate finish Sat May 31 00:38:49 2008 > 74.79% done, estimate finish Sat May 31 00:38:48 2008 > 74.81% done, estimate finish Sat May 31 00:38:48 2008 > 74.84% done, estimate finish Sat May 31 00:38:48 2008 > 74.86% done, estimate finish Sat May 31 00:38:47 2008 > 74.88% done, estimate finish Sat May 31 00:38:49 2008 > 74.90% done, estimate finish Sat May 31 00:38:48 2008 > 74.93% done, estimate finish Sat May 31 00:38:48 2008 > 74.95% done, estimate finish Sat May 31 00:38:48 2008 > 74.97% done, estimate finish Sat May 31 00:38:47 2008 > 75.00% done, estimate finish Sat May 31 00:38:49 2008 > 75.02% done, estimate finish Sat May 31 00:38:48 2008 > 75.04% done, estimate finish Sat May 31 00:38:48 2008 > 75.06% done, estimate finish Sat May 31 00:38:48 2008 > 75.09% done, estimate finish Sat May 31 00:38:47 2008 > 75.11% done, estimate finish Sat May 31 00:38:47 2008 > 75.13% done, estimate finish Sat May 31 00:38:48 2008 > 75.15% done, estimate finish Sat May 31 00:38:48 2008 > 75.18% done, estimate finish Sat May 31 00:38:48 2008 > 75.20% done, estimate finish Sat May 31 00:38:48 2008 > 75.22% done, estimate finish Sat May 31 00:38:47 2008 > 75.25% done, estimate finish Sat May 31 00:38:48 2008 > 75.27% done, estimate finish Sat May 31 00:38:48 2008 > 75.29% done, estimate finish Sat May 31 00:38:48 2008 > 75.31% done, estimate finish Sat May 31 00:38:48 2008 > 75.34% done, estimate finish Sat May 31 00:38:47 2008 > 75.36% done, estimate finish Sat May 31 00:38:47 2008 > 75.38% done, estimate finish Sat May 31 00:38:48 2008 > 75.40% done, estimate finish Sat May 31 00:38:48 2008 > 75.43% done, estimate finish Sat May 31 00:38:48 2008 > 75.45% done, estimate finish Sat May 31 00:38:47 2008 > 75.47% done, estimate finish Sat May 31 00:38:47 2008 > 75.50% done, estimate finish Sat May 31 00:38:48 2008 > 75.52% done, estimate finish Sat May 31 00:38:48 2008 > 75.54% done, estimate finish Sat May 31 00:38:48 2008 > 75.56% done, estimate finish Sat May 31 00:38:47 2008 > 75.59% done, estimate finish Sat May 31 00:38:47 2008 > 75.61% done, estimate finish Sat May 31 00:38:47 2008 > 75.63% done, estimate finish Sat May 31 00:38:48 2008 > 75.65% done, estimate finish Sat May 31 00:38:48 2008 > 75.68% done, estimate finish Sat May 31 00:38:47 2008 > 75.70% done, estimate finish Sat May 31 00:38:47 2008 > 75.72% done, estimate finish Sat May 31 00:38:47 2008 > 75.75% done, estimate finish Sat May 31 00:38:48 2008 > 75.77% done, estimate finish Sat May 31 00:38:48 2008 > 75.79% done, estimate finish Sat May 31 00:38:47 2008 > 75.81% done, estimate finish Sat May 31 00:38:47 2008 > 75.84% done, estimate finish Sat May 31 00:38:47 2008 > 75.86% done, estimate finish Sat May 31 00:38:48 2008 > 75.88% done, estimate finish Sat May 31 00:38:48 2008 > 75.90% done, estimate finish Sat May 31 00:38:47 2008 > 75.93% done, estimate finish Sat May 31 00:38:47 2008 > 75.95% done, estimate finish Sat May 31 00:38:47 2008 > 75.97% done, estimate finish Sat May 31 00:38:47 2008 > 76.00% done, estimate finish Sat May 31 00:38:48 2008 > 76.02% done, estimate finish Sat May 31 00:38:47 2008 > 76.04% done, estimate finish Sat May 31 00:38:47 2008 > 76.06% done, estimate finish Sat May 31 00:38:47 2008 > 76.09% done, estimate finish Sat May 31 00:38:47 2008 > 76.11% done, estimate finish Sat May 31 00:38:48 2008 > 76.13% done, estimate finish Sat May 31 00:38:47 2008 > 76.15% done, estimate finish Sat May 31 00:38:47 2008 > 76.18% done, estimate finish Sat May 31 00:38:47 2008 > 76.20% done, estimate finish Sat May 31 00:38:47 2008 > 76.22% done, estimate finish Sat May 31 00:38:46 2008 > 76.25% done, estimate finish Sat May 31 00:38:47 2008 > 76.27% done, estimate finish Sat May 31 00:38:47 2008 > 76.29% done, estimate finish Sat May 31 00:38:47 2008 > 76.31% done, estimate finish Sat May 31 00:38:47 2008 > 76.34% done, estimate finish Sat May 31 00:38:46 2008 > 76.36% done, estimate finish Sat May 31 00:38:47 2008 > 76.38% done, estimate finish Sat May 31 00:38:47 2008 > 76.40% done, estimate finish Sat May 31 00:38:47 2008 > 76.43% done, estimate finish Sat May 31 00:38:47 2008 > 76.45% done, estimate finish Sat May 31 00:38:46 2008 > 76.47% done, estimate finish Sat May 31 00:38:46 2008 > 76.50% done, estimate finish Sat May 31 00:38:47 2008 > 76.52% done, estimate finish Sat May 31 00:38:47 2008 > 76.54% done, estimate finish Sat May 31 00:38:47 2008 > 76.56% done, estimate finish Sat May 31 00:38:46 2008 > 76.59% done, estimate finish Sat May 31 00:38:46 2008 > 76.61% done, estimate finish Sat May 31 00:38:47 2008 > 76.63% done, estimate finish Sat May 31 00:38:47 2008 > 76.65% done, estimate finish Sat May 31 00:38:47 2008 > 76.68% done, estimate finish Sat May 31 00:38:46 2008 > 76.70% done, estimate finish Sat May 31 00:38:46 2008 > 76.72% done, estimate finish Sat May 31 00:38:46 2008 > 76.74% done, estimate finish Sat May 31 00:38:47 2008 > 76.77% done, estimate finish Sat May 31 00:38:47 2008 > 76.79% done, estimate finish Sat May 31 00:38:46 2008 > 76.81% done, estimate finish Sat May 31 00:38:46 2008 > 76.84% done, estimate finish Sat May 31 00:38:46 2008 > 76.86% done, estimate finish Sat May 31 00:38:47 2008 > 76.88% done, estimate finish Sat May 31 00:38:47 2008 > 76.90% done, estimate finish Sat May 31 00:38:46 2008 > 76.93% done, estimate finish Sat May 31 00:38:46 2008 > 76.95% done, estimate finish Sat May 31 00:38:46 2008 > 76.97% done, estimate finish Sat May 31 00:38:47 2008 > 76.99% done, estimate finish Sat May 31 00:38:47 2008 > 77.02% done, estimate finish Sat May 31 00:38:46 2008 > 77.04% done, estimate finish Sat May 31 00:38:46 2008 > 77.06% done, estimate finish Sat May 31 00:38:46 2008 > 77.09% done, estimate finish Sat May 31 00:38:46 2008 > 77.11% done, estimate finish Sat May 31 00:38:47 2008 > 77.13% done, estimate finish Sat May 31 00:38:46 2008 > 77.15% done, estimate finish Sat May 31 00:38:46 2008 > 77.18% done, estimate finish Sat May 31 00:38:46 2008 > 77.20% done, estimate finish Sat May 31 00:38:47 2008 > 77.22% done, estimate finish Sat May 31 00:38:47 2008 > 77.24% done, estimate finish Sat May 31 00:38:48 2008 > 77.27% done, estimate finish Sat May 31 00:38:48 2008 > 77.29% done, estimate finish Sat May 31 00:38:47 2008 > 77.31% done, estimate finish Sat May 31 00:38:47 2008 > 77.34% done, estimate finish Sat May 31 00:38:47 2008 > 77.36% done, estimate finish Sat May 31 00:38:48 2008 > 77.38% done, estimate finish Sat May 31 00:38:48 2008 > 77.40% done, estimate finish Sat May 31 00:38:47 2008 > 77.43% done, estimate finish Sat May 31 00:38:47 2008 > 77.45% done, estimate finish Sat May 31 00:38:47 2008 > 77.47% done, estimate finish Sat May 31 00:38:46 2008 > 77.49% done, estimate finish Sat May 31 00:38:48 2008 > 77.52% done, estimate finish Sat May 31 00:38:47 2008 > 77.54% done, estimate finish Sat May 31 00:38:47 2008 > 77.56% done, estimate finish Sat May 31 00:38:47 2008 > 77.59% done, estimate finish Sat May 31 00:38:47 2008 > 77.61% done, estimate finish Sat May 31 00:38:48 2008 > 77.63% done, estimate finish Sat May 31 00:38:47 2008 > 77.65% done, estimate finish Sat May 31 00:38:47 2008 > 77.68% done, estimate finish Sat May 31 00:38:47 2008 > 77.70% done, estimate finish Sat May 31 00:38:47 2008 > 77.72% done, estimate finish Sat May 31 00:38:46 2008 > 77.74% done, estimate finish Sat May 31 00:38:47 2008 > 77.77% done, estimate finish Sat May 31 00:38:47 2008 > 77.79% done, estimate finish Sat May 31 00:38:47 2008 > 77.81% done, estimate finish Sat May 31 00:38:47 2008 > 77.84% done, estimate finish Sat May 31 00:38:46 2008 > 77.86% done, estimate finish Sat May 31 00:38:47 2008 > 77.88% done, estimate finish Sat May 31 00:38:47 2008 > 77.90% done, estimate finish Sat May 31 00:38:47 2008 > 77.93% done, estimate finish Sat May 31 00:38:47 2008 > 77.95% done, estimate finish Sat May 31 00:38:46 2008 > 77.97% done, estimate finish Sat May 31 00:38:47 2008 > 77.99% done, estimate finish Sat May 31 00:38:47 2008 > 78.02% done, estimate finish Sat May 31 00:38:47 2008 > 78.04% done, estimate finish Sat May 31 00:38:47 2008 > 78.06% done, estimate finish Sat May 31 00:38:46 2008 > 78.09% done, estimate finish Sat May 31 00:38:46 2008 > 78.11% done, estimate finish Sat May 31 00:38:47 2008 > 78.13% done, estimate finish Sat May 31 00:38:47 2008 > 78.15% done, estimate finish Sat May 31 00:38:47 2008 > 78.18% done, estimate finish Sat May 31 00:38:46 2008 > 78.20% done, estimate finish Sat May 31 00:38:46 2008 > 78.22% done, estimate finish Sat May 31 00:38:47 2008 > 78.24% done, estimate finish Sat May 31 00:38:47 2008 > 78.27% done, estimate finish Sat May 31 00:38:47 2008 > 78.29% done, estimate finish Sat May 31 00:38:46 2008 > 78.31% done, estimate finish Sat May 31 00:38:46 2008 > 78.34% done, estimate finish Sat May 31 00:38:46 2008 > 78.36% done, estimate finish Sat May 31 00:38:47 2008 > 78.38% done, estimate finish Sat May 31 00:38:47 2008 > 78.40% done, estimate finish Sat May 31 00:38:46 2008 > 78.43% done, estimate finish Sat May 31 00:38:46 2008 > 78.45% done, estimate finish Sat May 31 00:38:46 2008 > 78.47% done, estimate finish Sat May 31 00:38:47 2008 > 78.49% done, estimate finish Sat May 31 00:38:47 2008 > 78.52% done, estimate finish Sat May 31 00:38:46 2008 > 78.54% done, estimate finish Sat May 31 00:38:46 2008 > 78.56% done, estimate finish Sat May 31 00:38:46 2008 > 78.59% done, estimate finish Sat May 31 00:38:46 2008 > 78.61% done, estimate finish Sat May 31 00:38:47 2008 > 78.63% done, estimate finish Sat May 31 00:38:46 2008 > 78.65% done, estimate finish Sat May 31 00:38:46 2008 > 78.68% done, estimate finish Sat May 31 00:38:46 2008 > 78.70% done, estimate finish Sat May 31 00:38:46 2008 > 78.72% done, estimate finish Sat May 31 00:38:47 2008 > 78.74% done, estimate finish Sat May 31 00:38:46 2008 > 78.77% done, estimate finish Sat May 31 00:38:46 2008 > 78.79% done, estimate finish Sat May 31 00:38:46 2008 > 78.81% done, estimate finish Sat May 31 00:38:46 2008 > 78.83% done, estimate finish Sat May 31 00:38:45 2008 > 78.86% done, estimate finish Sat May 31 00:38:46 2008 > 78.88% done, estimate finish Sat May 31 00:38:46 2008 > 78.90% done, estimate finish Sat May 31 00:38:46 2008 > 78.93% done, estimate finish Sat May 31 00:38:46 2008 > 78.95% done, estimate finish Sat May 31 00:38:45 2008 > 78.97% done, estimate finish Sat May 31 00:38:46 2008 > 78.99% done, estimate finish Sat May 31 00:38:46 2008 > 79.02% done, estimate finish Sat May 31 00:38:46 2008 > 79.04% done, estimate finish Sat May 31 00:38:46 2008 > 79.06% done, estimate finish Sat May 31 00:38:45 2008 > 79.08% done, estimate finish Sat May 31 00:38:46 2008 > 79.11% done, estimate finish Sat May 31 00:38:46 2008 > 79.13% done, estimate finish Sat May 31 00:38:46 2008 > 79.15% done, estimate finish Sat May 31 00:38:46 2008 > 79.18% done, estimate finish Sat May 31 00:38:45 2008 > 79.20% done, estimate finish Sat May 31 00:38:45 2008 > 79.22% done, estimate finish Sat May 31 00:38:46 2008 > 79.24% done, estimate finish Sat May 31 00:38:46 2008 > 79.27% done, estimate finish Sat May 31 00:38:46 2008 > 79.29% done, estimate finish Sat May 31 00:38:45 2008 > 79.31% done, estimate finish Sat May 31 00:38:45 2008 > 79.33% done, estimate finish Sat May 31 00:38:46 2008 > 79.36% done, estimate finish Sat May 31 00:38:46 2008 > 79.38% done, estimate finish Sat May 31 00:38:46 2008 > 79.40% done, estimate finish Sat May 31 00:38:45 2008 > 79.43% done, estimate finish Sat May 31 00:38:45 2008 > 79.45% done, estimate finish Sat May 31 00:38:45 2008 > 79.47% done, estimate finish Sat May 31 00:38:46 2008 > 79.49% done, estimate finish Sat May 31 00:38:46 2008 > 79.52% done, estimate finish Sat May 31 00:38:45 2008 > 79.54% done, estimate finish Sat May 31 00:38:45 2008 > 79.56% done, estimate finish Sat May 31 00:38:45 2008 > 79.59% done, estimate finish Sat May 31 00:38:46 2008 > 79.61% done, estimate finish Sat May 31 00:38:46 2008 > 79.63% done, estimate finish Sat May 31 00:38:46 2008 > 79.65% done, estimate finish Sat May 31 00:38:45 2008 > 79.68% done, estimate finish Sat May 31 00:38:45 2008 > 79.70% done, estimate finish Sat May 31 00:38:45 2008 > 79.72% done, estimate finish Sat May 31 00:38:46 2008 > 79.74% done, estimate finish Sat May 31 00:38:46 2008 > 79.77% done, estimate finish Sat May 31 00:38:45 2008 > 79.79% done, estimate finish Sat May 31 00:38:45 2008 > 79.81% done, estimate finish Sat May 31 00:38:45 2008 > 79.83% done, estimate finish Sat May 31 00:38:46 2008 > 79.86% done, estimate finish Sat May 31 00:38:46 2008 > 79.88% done, estimate finish Sat May 31 00:38:45 2008 > 79.90% done, estimate finish Sat May 31 00:38:45 2008 > 79.93% done, estimate finish Sat May 31 00:38:45 2008 > 79.95% done, estimate finish Sat May 31 00:38:46 2008 > 79.97% done, estimate finish Sat May 31 00:38:46 2008 > 79.99% done, estimate finish Sat May 31 00:38:45 2008 > 80.02% done, estimate finish Sat May 31 00:38:45 2008 > 80.04% done, estimate finish Sat May 31 00:38:45 2008 > 80.06% done, estimate finish Sat May 31 00:38:45 2008 > 80.08% done, estimate finish Sat May 31 00:38:46 2008 > 80.11% done, estimate finish Sat May 31 00:38:45 2008 > 80.13% done, estimate finish Sat May 31 00:38:45 2008 > 80.15% done, estimate finish Sat May 31 00:38:45 2008 > 80.18% done, estimate finish Sat May 31 00:38:45 2008 > 80.20% done, estimate finish Sat May 31 00:38:44 2008 > 80.22% done, estimate finish Sat May 31 00:38:45 2008 > 80.24% done, estimate finish Sat May 31 00:38:45 2008 > 80.27% done, estimate finish Sat May 31 00:38:45 2008 > 80.29% done, estimate finish Sat May 31 00:38:45 2008 > 80.31% done, estimate finish Sat May 31 00:38:44 2008 > 80.33% done, estimate finish Sat May 31 00:38:45 2008 > 80.36% done, estimate finish Sat May 31 00:38:45 2008 > 80.38% done, estimate finish Sat May 31 00:38:45 2008 > 80.40% done, estimate finish Sat May 31 00:38:45 2008 > 80.43% done, estimate finish Sat May 31 00:38:44 2008 > 80.45% done, estimate finish Sat May 31 00:38:45 2008 > 80.47% done, estimate finish Sat May 31 00:38:45 2008 > 80.49% done, estimate finish Sat May 31 00:38:45 2008 > 80.52% done, estimate finish Sat May 31 00:38:45 2008 > 80.54% done, estimate finish Sat May 31 00:38:44 2008 > 80.56% done, estimate finish Sat May 31 00:38:44 2008 > 80.58% done, estimate finish Sat May 31 00:38:45 2008 > 80.61% done, estimate finish Sat May 31 00:38:45 2008 > 80.63% done, estimate finish Sat May 31 00:38:45 2008 > 80.65% done, estimate finish Sat May 31 00:38:44 2008 > 80.68% done, estimate finish Sat May 31 00:38:44 2008 > 80.70% done, estimate finish Sat May 31 00:38:45 2008 > 80.72% done, estimate finish Sat May 31 00:38:45 2008 > 80.74% done, estimate finish Sat May 31 00:38:45 2008 > 80.77% done, estimate finish Sat May 31 00:38:44 2008 > 80.79% done, estimate finish Sat May 31 00:38:44 2008 > 80.81% done, estimate finish Sat May 31 00:38:44 2008 > 80.83% done, estimate finish Sat May 31 00:38:45 2008 > 80.86% done, estimate finish Sat May 31 00:38:45 2008 > 80.88% done, estimate finish Sat May 31 00:38:44 2008 > 80.90% done, estimate finish Sat May 31 00:38:44 2008 > 80.93% done, estimate finish Sat May 31 00:38:44 2008 > 80.95% done, estimate finish Sat May 31 00:38:45 2008 > 80.97% done, estimate finish Sat May 31 00:38:45 2008 > 80.99% done, estimate finish Sat May 31 00:38:44 2008 > 81.02% done, estimate finish Sat May 31 00:38:44 2008 > 81.04% done, estimate finish Sat May 31 00:38:44 2008 > 81.06% done, estimate finish Sat May 31 00:38:44 2008 > 81.08% done, estimate finish Sat May 31 00:38:45 2008 > 81.11% done, estimate finish Sat May 31 00:38:44 2008 > 81.13% done, estimate finish Sat May 31 00:38:44 2008 > 81.15% done, estimate finish Sat May 31 00:38:44 2008 > 81.18% done, estimate finish Sat May 31 00:38:44 2008 > 81.20% done, estimate finish Sat May 31 00:38:45 2008 > 81.22% done, estimate finish Sat May 31 00:38:45 2008 > 81.24% done, estimate finish Sat May 31 00:38:44 2008 > 81.27% done, estimate finish Sat May 31 00:38:44 2008 > 81.29% done, estimate finish Sat May 31 00:38:44 2008 > 81.31% done, estimate finish Sat May 31 00:38:44 2008 > 81.33% done, estimate finish Sat May 31 00:38:45 2008 > 81.36% done, estimate finish Sat May 31 00:38:44 2008 > 81.38% done, estimate finish Sat May 31 00:38:44 2008 > 81.40% done, estimate finish Sat May 31 00:38:44 2008 > 81.43% done, estimate finish Sat May 31 00:38:44 2008 > 81.45% done, estimate finish Sat May 31 00:38:45 2008 > 81.47% done, estimate finish Sat May 31 00:38:44 2008 > 81.49% done, estimate finish Sat May 31 00:38:44 2008 > 81.52% done, estimate finish Sat May 31 00:38:44 2008 > 81.54% done, estimate finish Sat May 31 00:38:44 2008 > 81.56% done, estimate finish Sat May 31 00:38:45 2008 > 81.58% done, estimate finish Sat May 31 00:38:44 2008 > 81.61% done, estimate finish Sat May 31 00:38:44 2008 > 81.63% done, estimate finish Sat May 31 00:38:44 2008 > 81.65% done, estimate finish Sat May 31 00:38:44 2008 > 81.68% done, estimate finish Sat May 31 00:38:43 2008 > 81.70% done, estimate finish Sat May 31 00:38:44 2008 > 81.72% done, estimate finish Sat May 31 00:38:44 2008 > 81.74% done, estimate finish Sat May 31 00:38:44 2008 > 81.77% done, estimate finish Sat May 31 00:38:44 2008 > 81.79% done, estimate finish Sat May 31 00:38:43 2008 > 81.81% done, estimate finish Sat May 31 00:38:44 2008 > 81.83% done, estimate finish Sat May 31 00:38:44 2008 > 81.86% done, estimate finish Sat May 31 00:38:44 2008 > 81.88% done, estimate finish Sat May 31 00:38:44 2008 > 81.90% done, estimate finish Sat May 31 00:38:43 2008 > 81.92% done, estimate finish Sat May 31 00:38:43 2008 > 81.95% done, estimate finish Sat May 31 00:38:44 2008 > 81.97% done, estimate finish Sat May 31 00:38:44 2008 > 81.99% done, estimate finish Sat May 31 00:38:44 2008 > 82.02% done, estimate finish Sat May 31 00:38:43 2008 > 82.04% done, estimate finish Sat May 31 00:38:43 2008 > 82.06% done, estimate finish Sat May 31 00:38:44 2008 > 82.08% done, estimate finish Sat May 31 00:38:44 2008 > 82.11% done, estimate finish Sat May 31 00:38:44 2008 > 82.13% done, estimate finish Sat May 31 00:38:43 2008 > 82.15% done, estimate finish Sat May 31 00:38:43 2008 > 82.17% done, estimate finish Sat May 31 00:38:43 2008 > 82.20% done, estimate finish Sat May 31 00:38:44 2008 > 82.22% done, estimate finish Sat May 31 00:38:44 2008 > 82.24% done, estimate finish Sat May 31 00:38:43 2008 > 82.27% done, estimate finish Sat May 31 00:38:43 2008 > 82.29% done, estimate finish Sat May 31 00:38:43 2008 > 82.31% done, estimate finish Sat May 31 00:38:44 2008 > 82.33% done, estimate finish Sat May 31 00:38:44 2008 > 82.36% done, estimate finish Sat May 31 00:38:43 2008 > 82.38% done, estimate finish Sat May 31 00:38:43 2008 > 82.40% done, estimate finish Sat May 31 00:38:43 2008 > 82.42% done, estimate finish Sat May 31 00:38:43 2008 > 82.45% done, estimate finish Sat May 31 00:38:44 2008 > 82.47% done, estimate finish Sat May 31 00:38:43 2008 > 82.49% done, estimate finish Sat May 31 00:38:43 2008 > 82.52% done, estimate finish Sat May 31 00:38:43 2008 > 82.54% done, estimate finish Sat May 31 00:38:43 2008 > 82.56% done, estimate finish Sat May 31 00:38:44 2008 > 82.58% done, estimate finish Sat May 31 00:38:43 2008 > 82.61% done, estimate finish Sat May 31 00:38:43 2008 > 82.63% done, estimate finish Sat May 31 00:38:43 2008 > 82.65% done, estimate finish Sat May 31 00:38:43 2008 > 82.67% done, estimate finish Sat May 31 00:38:44 2008 > 82.70% done, estimate finish Sat May 31 00:38:44 2008 > 82.72% done, estimate finish Sat May 31 00:38:43 2008 > 82.74% done, estimate finish Sat May 31 00:38:43 2008 > 82.77% done, estimate finish Sat May 31 00:38:43 2008 > 82.79% done, estimate finish Sat May 31 00:38:43 2008 > 82.81% done, estimate finish Sat May 31 00:38:44 2008 > 82.83% done, estimate finish Sat May 31 00:38:43 2008 > 82.86% done, estimate finish Sat May 31 00:38:43 2008 > 82.88% done, estimate finish Sat May 31 00:38:43 2008 > 82.90% done, estimate finish Sat May 31 00:38:43 2008 > 82.92% done, estimate finish Sat May 31 00:38:44 2008 > 82.95% done, estimate finish Sat May 31 00:38:43 2008 > 82.97% done, estimate finish Sat May 31 00:38:43 2008 > 82.99% done, estimate finish Sat May 31 00:38:43 2008 > 83.02% done, estimate finish Sat May 31 00:38:43 2008 > 83.04% done, estimate finish Sat May 31 00:38:42 2008 > 83.06% done, estimate finish Sat May 31 00:38:43 2008 > 83.08% done, estimate finish Sat May 31 00:38:43 2008 > 83.11% done, estimate finish Sat May 31 00:38:43 2008 > 83.13% done, estimate finish Sat May 31 00:38:43 2008 > 83.15% done, estimate finish Sat May 31 00:38:42 2008 > 83.17% done, estimate finish Sat May 31 00:38:43 2008 > 83.20% done, estimate finish Sat May 31 00:38:43 2008 > 83.22% done, estimate finish Sat May 31 00:38:43 2008 > 83.24% done, estimate finish Sat May 31 00:38:43 2008 > 83.27% done, estimate finish Sat May 31 00:38:42 2008 > 83.29% done, estimate finish Sat May 31 00:38:42 2008 > 83.31% done, estimate finish Sat May 31 00:38:43 2008 > 83.33% done, estimate finish Sat May 31 00:38:43 2008 > 83.36% done, estimate finish Sat May 31 00:38:43 2008 > 83.38% done, estimate finish Sat May 31 00:38:42 2008 > 83.40% done, estimate finish Sat May 31 00:38:42 2008 > 83.42% done, estimate finish Sat May 31 00:38:43 2008 > 83.45% done, estimate finish Sat May 31 00:38:43 2008 > 83.47% done, estimate finish Sat May 31 00:38:43 2008 > 83.49% done, estimate finish Sat May 31 00:38:42 2008 > 83.52% done, estimate finish Sat May 31 00:38:42 2008 > 83.54% done, estimate finish Sat May 31 00:38:42 2008 > 83.56% done, estimate finish Sat May 31 00:38:43 2008 > 83.58% done, estimate finish Sat May 31 00:38:43 2008 > 83.61% done, estimate finish Sat May 31 00:38:42 2008 > 83.63% done, estimate finish Sat May 31 00:38:42 2008 > 83.65% done, estimate finish Sat May 31 00:38:42 2008 > 83.67% done, estimate finish Sat May 31 00:38:43 2008 > 83.70% done, estimate finish Sat May 31 00:38:43 2008 > 83.72% done, estimate finish Sat May 31 00:38:42 2008 > 83.74% done, estimate finish Sat May 31 00:38:42 2008 > 83.77% done, estimate finish Sat May 31 00:38:42 2008 > 83.79% done, estimate finish Sat May 31 00:38:43 2008 > 83.81% done, estimate finish Sat May 31 00:38:43 2008 > 83.83% done, estimate finish Sat May 31 00:38:43 2008 > 83.86% done, estimate finish Sat May 31 00:38:42 2008 > 83.88% done, estimate finish Sat May 31 00:38:42 2008 > 83.90% done, estimate finish Sat May 31 00:38:42 2008 > 83.92% done, estimate finish Sat May 31 00:38:43 2008 > 83.95% done, estimate finish Sat May 31 00:38:43 2008 > 83.97% done, estimate finish Sat May 31 00:38:42 2008 > 83.99% done, estimate finish Sat May 31 00:38:42 2008 > 84.01% done, estimate finish Sat May 31 00:38:42 2008 > 84.04% done, estimate finish Sat May 31 00:38:43 2008 > 84.06% done, estimate finish Sat May 31 00:38:43 2008 > 84.08% done, estimate finish Sat May 31 00:38:43 2008 > 84.11% done, estimate finish Sat May 31 00:38:43 2008 > 84.13% done, estimate finish Sat May 31 00:38:43 2008 > 84.15% done, estimate finish Sat May 31 00:38:43 2008 > 84.17% done, estimate finish Sat May 31 00:38:44 2008 > 84.20% done, estimate finish Sat May 31 00:38:44 2008 > 84.22% done, estimate finish Sat May 31 00:38:43 2008 > 84.24% done, estimate finish Sat May 31 00:38:43 2008 > 84.27% done, estimate finish Sat May 31 00:38:43 2008 > 84.29% done, estimate finish Sat May 31 00:38:43 2008 > 84.31% done, estimate finish Sat May 31 00:38:44 2008 > 84.33% done, estimate finish Sat May 31 00:38:43 2008 > 84.36% done, estimate finish Sat May 31 00:38:43 2008 > 84.38% done, estimate finish Sat May 31 00:38:43 2008 > 84.40% done, estimate finish Sat May 31 00:38:43 2008 > 84.42% done, estimate finish Sat May 31 00:38:44 2008 > 84.45% done, estimate finish Sat May 31 00:38:43 2008 > 84.47% done, estimate finish Sat May 31 00:38:43 2008 > 84.49% done, estimate finish Sat May 31 00:38:43 2008 > 84.52% done, estimate finish Sat May 31 00:38:43 2008 > 84.54% done, estimate finish Sat May 31 00:38:44 2008 > 84.56% done, estimate finish Sat May 31 00:38:43 2008 > 84.58% done, estimate finish Sat May 31 00:38:43 2008 > 84.61% done, estimate finish Sat May 31 00:38:43 2008 > 84.63% done, estimate finish Sat May 31 00:38:43 2008 > 84.65% done, estimate finish Sat May 31 00:38:42 2008 > 84.67% done, estimate finish Sat May 31 00:38:43 2008 > 84.70% done, estimate finish Sat May 31 00:38:43 2008 > 84.72% done, estimate finish Sat May 31 00:38:43 2008 > 84.74% done, estimate finish Sat May 31 00:38:43 2008 > 84.76% done, estimate finish Sat May 31 00:38:42 2008 > 84.79% done, estimate finish Sat May 31 00:38:43 2008 > 84.81% done, estimate finish Sat May 31 00:38:43 2008 > 84.83% done, estimate finish Sat May 31 00:38:43 2008 > 84.86% done, estimate finish Sat May 31 00:38:43 2008 > 84.88% done, estimate finish Sat May 31 00:38:42 2008 > 84.90% done, estimate finish Sat May 31 00:38:42 2008 > 84.92% done, estimate finish Sat May 31 00:38:43 2008 > 84.95% done, estimate finish Sat May 31 00:38:43 2008 > 84.97% done, estimate finish Sat May 31 00:38:43 2008 > 84.99% done, estimate finish Sat May 31 00:38:42 2008 > 85.01% done, estimate finish Sat May 31 00:38:42 2008 > 85.04% done, estimate finish Sat May 31 00:38:43 2008 > 85.06% done, estimate finish Sat May 31 00:38:43 2008 > 85.08% done, estimate finish Sat May 31 00:38:43 2008 > 85.11% done, estimate finish Sat May 31 00:38:42 2008 > 85.13% done, estimate finish Sat May 31 00:38:42 2008 > 85.15% done, estimate finish Sat May 31 00:38:42 2008 > 85.17% done, estimate finish Sat May 31 00:38:43 2008 > 85.20% done, estimate finish Sat May 31 00:38:43 2008 > 85.22% done, estimate finish Sat May 31 00:38:43 2008 > 85.24% done, estimate finish Sat May 31 00:38:42 2008 > 85.26% done, estimate finish Sat May 31 00:38:42 2008 > 85.29% done, estimate finish Sat May 31 00:38:43 2008 > 85.31% done, estimate finish Sat May 31 00:38:43 2008 > 85.33% done, estimate finish Sat May 31 00:38:43 2008 > 85.36% done, estimate finish Sat May 31 00:38:42 2008 > 85.38% done, estimate finish Sat May 31 00:38:42 2008 > 85.40% done, estimate finish Sat May 31 00:38:42 2008 > 85.42% done, estimate finish Sat May 31 00:38:43 2008 > 85.45% done, estimate finish Sat May 31 00:38:43 2008 > 85.47% done, estimate finish Sat May 31 00:38:42 2008 > 85.49% done, estimate finish Sat May 31 00:38:42 2008 > 85.51% done, estimate finish Sat May 31 00:38:42 2008 > 85.54% done, estimate finish Sat May 31 00:38:43 2008 > 85.56% done, estimate finish Sat May 31 00:38:43 2008 > 85.58% done, estimate finish Sat May 31 00:38:42 2008 > 85.61% done, estimate finish Sat May 31 00:38:42 2008 > 85.63% done, estimate finish Sat May 31 00:38:42 2008 > 85.65% done, estimate finish Sat May 31 00:38:43 2008 > 85.67% done, estimate finish Sat May 31 00:38:43 2008 > 85.70% done, estimate finish Sat May 31 00:38:42 2008 > 85.72% done, estimate finish Sat May 31 00:38:42 2008 > 85.74% done, estimate finish Sat May 31 00:38:42 2008 > 85.76% done, estimate finish Sat May 31 00:38:42 2008 > 85.79% done, estimate finish Sat May 31 00:38:43 2008 > 85.81% done, estimate finish Sat May 31 00:38:42 2008 > 85.83% done, estimate finish Sat May 31 00:38:42 2008 > 85.85% done, estimate finish Sat May 31 00:38:42 2008 > 85.88% done, estimate finish Sat May 31 00:38:42 2008 > 85.90% done, estimate finish Sat May 31 00:38:43 2008 > 85.92% done, estimate finish Sat May 31 00:38:42 2008 > 85.95% done, estimate finish Sat May 31 00:38:42 2008 > 85.97% done, estimate finish Sat May 31 00:38:42 2008 > 85.99% done, estimate finish Sat May 31 00:38:42 2008 > 86.01% done, estimate finish Sat May 31 00:38:41 2008 > 86.04% done, estimate finish Sat May 31 00:38:42 2008 > 86.06% done, estimate finish Sat May 31 00:38:42 2008 > 86.08% done, estimate finish Sat May 31 00:38:42 2008 > 86.11% done, estimate finish Sat May 31 00:38:42 2008 > 86.13% done, estimate finish Sat May 31 00:38:41 2008 > 86.15% done, estimate finish Sat May 31 00:38:42 2008 > 86.17% done, estimate finish Sat May 31 00:38:42 2008 > 86.20% done, estimate finish Sat May 31 00:38:42 2008 > 86.22% done, estimate finish Sat May 31 00:38:42 2008 > 86.24% done, estimate finish Sat May 31 00:38:42 2008 > 86.26% done, estimate finish Sat May 31 00:38:41 2008 > 86.29% done, estimate finish Sat May 31 00:38:42 2008 > 86.31% done, estimate finish Sat May 31 00:38:42 2008 > 86.33% done, estimate finish Sat May 31 00:38:42 2008 > 86.36% done, estimate finish Sat May 31 00:38:42 2008 > 86.38% done, estimate finish Sat May 31 00:38:41 2008 > 86.40% done, estimate finish Sat May 31 00:38:42 2008 > 86.42% done, estimate finish Sat May 31 00:38:42 2008 > 86.45% done, estimate finish Sat May 31 00:38:42 2008 > 86.47% done, estimate finish Sat May 31 00:38:42 2008 > 86.49% done, estimate finish Sat May 31 00:38:41 2008 > 86.51% done, estimate finish Sat May 31 00:38:42 2008 > 86.54% done, estimate finish Sat May 31 00:38:42 2008 > 86.56% done, estimate finish Sat May 31 00:38:42 2008 > 86.58% done, estimate finish Sat May 31 00:38:42 2008 > 86.61% done, estimate finish Sat May 31 00:38:41 2008 > 86.63% done, estimate finish Sat May 31 00:38:41 2008 > 86.65% done, estimate finish Sat May 31 00:38:42 2008 > 86.67% done, estimate finish Sat May 31 00:38:42 2008 > 86.70% done, estimate finish Sat May 31 00:38:42 2008 > 86.72% done, estimate finish Sat May 31 00:38:41 2008 > 86.74% done, estimate finish Sat May 31 00:38:41 2008 > 86.76% done, estimate finish Sat May 31 00:38:42 2008 > 86.79% done, estimate finish Sat May 31 00:38:42 2008 > 86.81% done, estimate finish Sat May 31 00:38:42 2008 > 86.83% done, estimate finish Sat May 31 00:38:41 2008 > 86.85% done, estimate finish Sat May 31 00:38:41 2008 > 86.88% done, estimate finish Sat May 31 00:38:41 2008 > 86.90% done, estimate finish Sat May 31 00:38:42 2008 > 86.92% done, estimate finish Sat May 31 00:38:42 2008 > 86.95% done, estimate finish Sat May 31 00:38:41 2008 > 86.97% done, estimate finish Sat May 31 00:38:41 2008 > 86.99% done, estimate finish Sat May 31 00:38:41 2008 > 87.01% done, estimate finish Sat May 31 00:38:42 2008 > 87.04% done, estimate finish Sat May 31 00:38:42 2008 > 87.06% done, estimate finish Sat May 31 00:38:41 2008 > 87.08% done, estimate finish Sat May 31 00:38:41 2008 > 87.10% done, estimate finish Sat May 31 00:38:41 2008 > 87.13% done, estimate finish Sat May 31 00:38:41 2008 > 87.15% done, estimate finish Sat May 31 00:38:42 2008 > 87.17% done, estimate finish Sat May 31 00:38:41 2008 > 87.20% done, estimate finish Sat May 31 00:38:41 2008 > 87.22% done, estimate finish Sat May 31 00:38:41 2008 > 87.24% done, estimate finish Sat May 31 00:38:41 2008 > 87.26% done, estimate finish Sat May 31 00:38:42 2008 > 87.29% done, estimate finish Sat May 31 00:38:41 2008 > 87.31% done, estimate finish Sat May 31 00:38:41 2008 > 87.33% done, estimate finish Sat May 31 00:38:41 2008 > 87.35% done, estimate finish Sat May 31 00:38:41 2008 > 87.38% done, estimate finish Sat May 31 00:38:41 2008 > 87.40% done, estimate finish Sat May 31 00:38:41 2008 > 87.42% done, estimate finish Sat May 31 00:38:41 2008 > 87.45% done, estimate finish Sat May 31 00:38:41 2008 > 87.47% done, estimate finish Sat May 31 00:38:41 2008 > 87.49% done, estimate finish Sat May 31 00:38:41 2008 > 87.51% done, estimate finish Sat May 31 00:38:42 2008 > 87.54% done, estimate finish Sat May 31 00:38:41 2008 > 87.56% done, estimate finish Sat May 31 00:38:41 2008 > 87.58% done, estimate finish Sat May 31 00:38:41 2008 > 87.60% done, estimate finish Sat May 31 00:38:41 2008 > 87.63% done, estimate finish Sat May 31 00:38:40 2008 > 87.65% done, estimate finish Sat May 31 00:38:41 2008 > 87.67% done, estimate finish Sat May 31 00:38:41 2008 > 87.70% done, estimate finish Sat May 31 00:38:41 2008 > 87.72% done, estimate finish Sat May 31 00:38:41 2008 > 87.74% done, estimate finish Sat May 31 00:38:40 2008 > 87.76% done, estimate finish Sat May 31 00:38:41 2008 > 87.79% done, estimate finish Sat May 31 00:38:41 2008 > 87.81% done, estimate finish Sat May 31 00:38:41 2008 > 87.83% done, estimate finish Sat May 31 00:38:41 2008 > 87.85% done, estimate finish Sat May 31 00:38:40 2008 > 87.88% done, estimate finish Sat May 31 00:38:41 2008 > 87.90% done, estimate finish Sat May 31 00:38:41 2008 > 87.92% done, estimate finish Sat May 31 00:38:41 2008 > 87.95% done, estimate finish Sat May 31 00:38:41 2008 > 87.97% done, estimate finish Sat May 31 00:38:40 2008 > 87.99% done, estimate finish Sat May 31 00:38:40 2008 > 88.01% done, estimate finish Sat May 31 00:38:41 2008 > 88.04% done, estimate finish Sat May 31 00:38:41 2008 > 88.06% done, estimate finish Sat May 31 00:38:41 2008 > 88.08% done, estimate finish Sat May 31 00:38:40 2008 > 88.10% done, estimate finish Sat May 31 00:38:40 2008 > 88.13% done, estimate finish Sat May 31 00:38:41 2008 > 88.15% done, estimate finish Sat May 31 00:38:41 2008 > 88.17% done, estimate finish Sat May 31 00:38:41 2008 > 88.20% done, estimate finish Sat May 31 00:38:40 2008 > 88.22% done, estimate finish Sat May 31 00:38:40 2008 > 88.24% done, estimate finish Sat May 31 00:38:40 2008 > 88.26% done, estimate finish Sat May 31 00:38:41 2008 > 88.29% done, estimate finish Sat May 31 00:38:41 2008 > 88.31% done, estimate finish Sat May 31 00:38:41 2008 > 88.33% done, estimate finish Sat May 31 00:38:40 2008 > 88.35% done, estimate finish Sat May 31 00:38:40 2008 > 88.38% done, estimate finish Sat May 31 00:38:41 2008 > 88.40% done, estimate finish Sat May 31 00:38:41 2008 > 88.42% done, estimate finish Sat May 31 00:38:41 2008 > 88.45% done, estimate finish Sat May 31 00:38:40 2008 > 88.47% done, estimate finish Sat May 31 00:38:40 2008 > 88.49% done, estimate finish Sat May 31 00:38:40 2008 > 88.51% done, estimate finish Sat May 31 00:38:41 2008 > 88.54% done, estimate finish Sat May 31 00:38:41 2008 > 88.56% done, estimate finish Sat May 31 00:38:40 2008 > 88.58% done, estimate finish Sat May 31 00:38:40 2008 > 88.60% done, estimate finish Sat May 31 00:38:40 2008 > 88.63% done, estimate finish Sat May 31 00:38:41 2008 > 88.65% done, estimate finish Sat May 31 00:38:41 2008 > 88.67% done, estimate finish Sat May 31 00:38:40 2008 > 88.70% done, estimate finish Sat May 31 00:38:40 2008 > 88.72% done, estimate finish Sat May 31 00:38:40 2008 > 88.74% done, estimate finish Sat May 31 00:38:40 2008 > 88.76% done, estimate finish Sat May 31 00:38:41 2008 > 88.79% done, estimate finish Sat May 31 00:38:40 2008 > 88.81% done, estimate finish Sat May 31 00:38:40 2008 > 88.83% done, estimate finish Sat May 31 00:38:40 2008 > 88.85% done, estimate finish Sat May 31 00:38:40 2008 > 88.88% done, estimate finish Sat May 31 00:38:41 2008 > 88.90% done, estimate finish Sat May 31 00:38:40 2008 > 88.92% done, estimate finish Sat May 31 00:38:40 2008 > 88.94% done, estimate finish Sat May 31 00:38:40 2008 > 88.97% done, estimate finish Sat May 31 00:38:40 2008 > 88.99% done, estimate finish Sat May 31 00:38:40 2008 > 89.01% done, estimate finish Sat May 31 00:38:40 2008 > 89.04% done, estimate finish Sat May 31 00:38:40 2008 > 89.06% done, estimate finish Sat May 31 00:38:40 2008 > 89.08% done, estimate finish Sat May 31 00:38:40 2008 > 89.10% done, estimate finish Sat May 31 00:38:40 2008 > 89.13% done, estimate finish Sat May 31 00:38:40 2008 > 89.15% done, estimate finish Sat May 31 00:38:40 2008 > 89.17% done, estimate finish Sat May 31 00:38:40 2008 > 89.19% done, estimate finish Sat May 31 00:38:40 2008 > 89.22% done, estimate finish Sat May 31 00:38:40 2008 > 89.24% done, estimate finish Sat May 31 00:38:39 2008 > 89.26% done, estimate finish Sat May 31 00:38:40 2008 > 89.29% done, estimate finish Sat May 31 00:38:40 2008 > 89.31% done, estimate finish Sat May 31 00:38:40 2008 > 89.33% done, estimate finish Sat May 31 00:38:40 2008 > 89.35% done, estimate finish Sat May 31 00:38:39 2008 > 89.38% done, estimate finish Sat May 31 00:38:40 2008 > 89.40% done, estimate finish Sat May 31 00:38:40 2008 > 89.42% done, estimate finish Sat May 31 00:38:40 2008 > 89.44% done, estimate finish Sat May 31 00:38:40 2008 > 89.47% done, estimate finish Sat May 31 00:38:39 2008 > 89.49% done, estimate finish Sat May 31 00:38:40 2008 > 89.51% done, estimate finish Sat May 31 00:38:40 2008 > 89.54% done, estimate finish Sat May 31 00:38:40 2008 > 89.56% done, estimate finish Sat May 31 00:38:40 2008 > 89.58% done, estimate finish Sat May 31 00:38:39 2008 > 89.60% done, estimate finish Sat May 31 00:38:39 2008 > 89.63% done, estimate finish Sat May 31 00:38:40 2008 > 89.65% done, estimate finish Sat May 31 00:38:40 2008 > 89.67% done, estimate finish Sat May 31 00:38:40 2008 > 89.70% done, estimate finish Sat May 31 00:38:39 2008 > 89.72% done, estimate finish Sat May 31 00:38:39 2008 > 89.74% done, estimate finish Sat May 31 00:38:40 2008 > 89.76% done, estimate finish Sat May 31 00:38:40 2008 > 89.79% done, estimate finish Sat May 31 00:38:40 2008 > 89.81% done, estimate finish Sat May 31 00:38:39 2008 > 89.83% done, estimate finish Sat May 31 00:38:39 2008 > 89.85% done, estimate finish Sat May 31 00:38:39 2008 > 89.88% done, estimate finish Sat May 31 00:38:40 2008 > 89.90% done, estimate finish Sat May 31 00:38:40 2008 > 89.92% done, estimate finish Sat May 31 00:38:39 2008 > 89.94% done, estimate finish Sat May 31 00:38:39 2008 > 89.97% done, estimate finish Sat May 31 00:38:39 2008 > 89.99% done, estimate finish Sat May 31 00:38:40 2008 > 90.01% done, estimate finish Sat May 31 00:38:40 2008 > 90.04% done, estimate finish Sat May 31 00:38:39 2008 > 90.06% done, estimate finish Sat May 31 00:38:39 2008 > 90.08% done, estimate finish Sat May 31 00:38:39 2008 > 90.10% done, estimate finish Sat May 31 00:38:39 2008 > 90.13% done, estimate finish Sat May 31 00:38:40 2008 > 90.15% done, estimate finish Sat May 31 00:38:40 2008 > 90.17% done, estimate finish Sat May 31 00:38:39 2008 > 90.19% done, estimate finish Sat May 31 00:38:39 2008 > 90.22% done, estimate finish Sat May 31 00:38:39 2008 > 90.24% done, estimate finish Sat May 31 00:38:40 2008 > 90.26% done, estimate finish Sat May 31 00:38:40 2008 > 90.29% done, estimate finish Sat May 31 00:38:39 2008 > 90.31% done, estimate finish Sat May 31 00:38:39 2008 > 90.33% done, estimate finish Sat May 31 00:38:39 2008 > 90.35% done, estimate finish Sat May 31 00:38:40 2008 > 90.38% done, estimate finish Sat May 31 00:38:40 2008 > 90.40% done, estimate finish Sat May 31 00:38:39 2008 > 90.42% done, estimate finish Sat May 31 00:38:39 2008 > 90.44% done, estimate finish Sat May 31 00:38:39 2008 > 90.47% done, estimate finish Sat May 31 00:38:39 2008 > 90.49% done, estimate finish Sat May 31 00:38:40 2008 > 90.51% done, estimate finish Sat May 31 00:38:39 2008 > 90.54% done, estimate finish Sat May 31 00:38:39 2008 > 90.56% done, estimate finish Sat May 31 00:38:39 2008 > 90.58% done, estimate finish Sat May 31 00:38:39 2008 > 90.60% done, estimate finish Sat May 31 00:38:40 2008 > 90.63% done, estimate finish Sat May 31 00:38:39 2008 > 90.65% done, estimate finish Sat May 31 00:38:39 2008 > 90.67% done, estimate finish Sat May 31 00:38:39 2008 > 90.69% done, estimate finish Sat May 31 00:38:39 2008 > 90.72% done, estimate finish Sat May 31 00:38:39 2008 > 90.74% done, estimate finish Sat May 31 00:38:39 2008 > 90.76% done, estimate finish Sat May 31 00:38:39 2008 > 90.79% done, estimate finish Sat May 31 00:38:39 2008 > 90.81% done, estimate finish Sat May 31 00:38:39 2008 > 90.83% done, estimate finish Sat May 31 00:38:39 2008 > 90.85% done, estimate finish Sat May 31 00:38:39 2008 > 90.88% done, estimate finish Sat May 31 00:38:39 2008 > 90.90% done, estimate finish Sat May 31 00:38:39 2008 > 90.92% done, estimate finish Sat May 31 00:38:39 2008 > 90.94% done, estimate finish Sat May 31 00:38:39 2008 > 90.97% done, estimate finish Sat May 31 00:38:39 2008 > 90.99% done, estimate finish Sat May 31 00:38:40 2008 > 91.01% done, estimate finish Sat May 31 00:38:40 2008 > 91.03% done, estimate finish Sat May 31 00:38:40 2008 > 91.06% done, estimate finish Sat May 31 00:38:40 2008 > 91.08% done, estimate finish Sat May 31 00:38:39 2008 > 91.10% done, estimate finish Sat May 31 00:38:40 2008 > 91.13% done, estimate finish Sat May 31 00:38:40 2008 > 91.15% done, estimate finish Sat May 31 00:38:40 2008 > 91.17% done, estimate finish Sat May 31 00:38:40 2008 > 91.19% done, estimate finish Sat May 31 00:38:39 2008 > 91.22% done, estimate finish Sat May 31 00:38:39 2008 > 91.24% done, estimate finish Sat May 31 00:38:40 2008 > 91.26% done, estimate finish Sat May 31 00:38:40 2008 > 91.29% done, estimate finish Sat May 31 00:38:40 2008 > 91.31% done, estimate finish Sat May 31 00:38:40 2008 > 91.33% done, estimate finish Sat May 31 00:38:39 2008 > 91.35% done, estimate finish Sat May 31 00:38:40 2008 > 91.38% done, estimate finish Sat May 31 00:38:40 2008 > 91.40% done, estimate finish Sat May 31 00:38:40 2008 > 91.42% done, estimate finish Sat May 31 00:38:40 2008 > 91.44% done, estimate finish Sat May 31 00:38:39 2008 > 91.47% done, estimate finish Sat May 31 00:38:39 2008 > 91.49% done, estimate finish Sat May 31 00:38:40 2008 > 91.51% done, estimate finish Sat May 31 00:38:40 2008 > 91.54% done, estimate finish Sat May 31 00:38:40 2008 > 91.56% done, estimate finish Sat May 31 00:38:39 2008 > 91.58% done, estimate finish Sat May 31 00:38:39 2008 > 91.60% done, estimate finish Sat May 31 00:38:40 2008 > 91.63% done, estimate finish Sat May 31 00:38:40 2008 > 91.65% done, estimate finish Sat May 31 00:38:40 2008 > 91.67% done, estimate finish Sat May 31 00:38:39 2008 > 91.69% done, estimate finish Sat May 31 00:38:39 2008 > 91.72% done, estimate finish Sat May 31 00:38:39 2008 > 91.74% done, estimate finish Sat May 31 00:38:40 2008 > 91.76% done, estimate finish Sat May 31 00:38:40 2008 > 91.79% done, estimate finish Sat May 31 00:38:39 2008 > 91.81% done, estimate finish Sat May 31 00:38:39 2008 > 91.83% done, estimate finish Sat May 31 00:38:39 2008 > 91.85% done, estimate finish Sat May 31 00:38:40 2008 > 91.88% done, estimate finish Sat May 31 00:38:40 2008 > 91.90% done, estimate finish Sat May 31 00:38:39 2008 > 91.92% done, estimate finish Sat May 31 00:38:39 2008 > 91.94% done, estimate finish Sat May 31 00:38:39 2008 > 91.97% done, estimate finish Sat May 31 00:38:40 2008 > 91.99% done, estimate finish Sat May 31 00:38:40 2008 > 92.01% done, estimate finish Sat May 31 00:38:39 2008 > 92.03% done, estimate finish Sat May 31 00:38:39 2008 > 92.06% done, estimate finish Sat May 31 00:38:39 2008 > 92.08% done, estimate finish Sat May 31 00:38:39 2008 > 92.10% done, estimate finish Sat May 31 00:38:40 2008 > 92.13% done, estimate finish Sat May 31 00:38:39 2008 > 92.15% done, estimate finish Sat May 31 00:38:39 2008 > 92.17% done, estimate finish Sat May 31 00:38:39 2008 > 92.19% done, estimate finish Sat May 31 00:38:39 2008 > 92.22% done, estimate finish Sat May 31 00:38:40 2008 > 92.24% done, estimate finish Sat May 31 00:38:39 2008 > 92.26% done, estimate finish Sat May 31 00:38:39 2008 > 92.28% done, estimate finish Sat May 31 00:38:39 2008 > 92.31% done, estimate finish Sat May 31 00:38:39 2008 > 92.33% done, estimate finish Sat May 31 00:38:39 2008 > 92.35% done, estimate finish Sat May 31 00:38:39 2008 > 92.38% done, estimate finish Sat May 31 00:38:39 2008 > 92.40% done, estimate finish Sat May 31 00:38:39 2008 > 92.42% done, estimate finish Sat May 31 00:38:39 2008 > 92.44% done, estimate finish Sat May 31 00:38:39 2008 > 92.47% done, estimate finish Sat May 31 00:38:40 2008 > 92.49% done, estimate finish Sat May 31 00:38:39 2008 > 92.51% done, estimate finish Sat May 31 00:38:39 2008 > 92.53% done, estimate finish Sat May 31 00:38:39 2008 > 92.56% done, estimate finish Sat May 31 00:38:39 2008 > 92.58% done, estimate finish Sat May 31 00:38:38 2008 > 92.60% done, estimate finish Sat May 31 00:38:39 2008 > 92.63% done, estimate finish Sat May 31 00:38:39 2008 > 92.65% done, estimate finish Sat May 31 00:38:39 2008 > 92.67% done, estimate finish Sat May 31 00:38:39 2008 > 92.69% done, estimate finish Sat May 31 00:38:38 2008 > 92.72% done, estimate finish Sat May 31 00:38:39 2008 > 92.74% done, estimate finish Sat May 31 00:38:39 2008 > 92.76% done, estimate finish Sat May 31 00:38:39 2008 > 92.78% done, estimate finish Sat May 31 00:38:39 2008 > 92.81% done, estimate finish Sat May 31 00:38:39 2008 > 92.83% done, estimate finish Sat May 31 00:38:38 2008 > 92.85% done, estimate finish Sat May 31 00:38:39 2008 > 92.88% done, estimate finish Sat May 31 00:38:39 2008 > 92.90% done, estimate finish Sat May 31 00:38:39 2008 > 92.92% done, estimate finish Sat May 31 00:38:39 2008 > 92.94% done, estimate finish Sat May 31 00:38:38 2008 > 92.97% done, estimate finish Sat May 31 00:38:39 2008 > 92.99% done, estimate finish Sat May 31 00:38:39 2008 > 93.01% done, estimate finish Sat May 31 00:38:39 2008 > 93.03% done, estimate finish Sat May 31 00:38:39 2008 > 93.06% done, estimate finish Sat May 31 00:38:38 2008 > 93.08% done, estimate finish Sat May 31 00:38:38 2008 > 93.10% done, estimate finish Sat May 31 00:38:39 2008 > 93.13% done, estimate finish Sat May 31 00:38:39 2008 > 93.15% done, estimate finish Sat May 31 00:38:39 2008 > 93.17% done, estimate finish Sat May 31 00:38:38 2008 > 93.19% done, estimate finish Sat May 31 00:38:38 2008 > 93.22% done, estimate finish Sat May 31 00:38:39 2008 > 93.24% done, estimate finish Sat May 31 00:38:39 2008 > 93.26% done, estimate finish Sat May 31 00:38:39 2008 > 93.28% done, estimate finish Sat May 31 00:38:38 2008 > 93.31% done, estimate finish Sat May 31 00:38:38 2008 > 93.33% done, estimate finish Sat May 31 00:38:39 2008 > 93.35% done, estimate finish Sat May 31 00:38:39 2008 > 93.38% done, estimate finish Sat May 31 00:38:39 2008 > 93.40% done, estimate finish Sat May 31 00:38:38 2008 > 93.42% done, estimate finish Sat May 31 00:38:38 2008 > 93.44% done, estimate finish Sat May 31 00:38:38 2008 > 93.47% done, estimate finish Sat May 31 00:38:39 2008 > 93.49% done, estimate finish Sat May 31 00:38:39 2008 > 93.51% done, estimate finish Sat May 31 00:38:38 2008 > 93.53% done, estimate finish Sat May 31 00:38:38 2008 > 93.56% done, estimate finish Sat May 31 00:38:38 2008 > 93.58% done, estimate finish Sat May 31 00:38:39 2008 > 93.60% done, estimate finish Sat May 31 00:38:39 2008 > 93.63% done, estimate finish Sat May 31 00:38:38 2008 > 93.65% done, estimate finish Sat May 31 00:38:38 2008 > 93.67% done, estimate finish Sat May 31 00:38:38 2008 > 93.69% done, estimate finish Sat May 31 00:38:38 2008 > 93.72% done, estimate finish Sat May 31 00:38:39 2008 > 93.74% done, estimate finish Sat May 31 00:38:38 2008 > 93.76% done, estimate finish Sat May 31 00:38:38 2008 > 93.78% done, estimate finish Sat May 31 00:38:38 2008 > 93.81% done, estimate finish Sat May 31 00:38:38 2008 > 93.83% done, estimate finish Sat May 31 00:38:39 2008 > 93.85% done, estimate finish Sat May 31 00:38:38 2008 > 93.88% done, estimate finish Sat May 31 00:38:38 2008 > 93.90% done, estimate finish Sat May 31 00:38:38 2008 > 93.92% done, estimate finish Sat May 31 00:38:38 2008 > 93.94% done, estimate finish Sat May 31 00:38:38 2008 > 93.97% done, estimate finish Sat May 31 00:38:39 2008 > 93.99% done, estimate finish Sat May 31 00:38:38 2008 > 94.01% done, estimate finish Sat May 31 00:38:38 2008 > 94.03% done, estimate finish Sat May 31 00:38:38 2008 > 94.06% done, estimate finish Sat May 31 00:38:38 2008 > 94.08% done, estimate finish Sat May 31 00:38:39 2008 > 94.10% done, estimate finish Sat May 31 00:38:38 2008 > 94.12% done, estimate finish Sat May 31 00:38:38 2008 > 94.15% done, estimate finish Sat May 31 00:38:38 2008 > 94.17% done, estimate finish Sat May 31 00:38:38 2008 > 94.19% done, estimate finish Sat May 31 00:38:37 2008 > 94.22% done, estimate finish Sat May 31 00:38:38 2008 > 94.24% done, estimate finish Sat May 31 00:38:38 2008 > 94.26% done, estimate finish Sat May 31 00:38:38 2008 > 94.28% done, estimate finish Sat May 31 00:38:38 2008 > 94.31% done, estimate finish Sat May 31 00:38:38 2008 > 94.33% done, estimate finish Sat May 31 00:38:38 2008 > 94.35% done, estimate finish Sat May 31 00:38:38 2008 > 94.37% done, estimate finish Sat May 31 00:38:38 2008 > 94.40% done, estimate finish Sat May 31 00:38:38 2008 > 94.42% done, estimate finish Sat May 31 00:38:38 2008 > 94.44% done, estimate finish Sat May 31 00:38:37 2008 > 94.47% done, estimate finish Sat May 31 00:38:38 2008 > 94.49% done, estimate finish Sat May 31 00:38:38 2008 > 94.51% done, estimate finish Sat May 31 00:38:38 2008 > 94.53% done, estimate finish Sat May 31 00:38:38 2008 > 94.56% done, estimate finish Sat May 31 00:38:37 2008 > 94.58% done, estimate finish Sat May 31 00:38:38 2008 > 94.60% done, estimate finish Sat May 31 00:38:38 2008 > 94.62% done, estimate finish Sat May 31 00:38:38 2008 > 94.65% done, estimate finish Sat May 31 00:38:38 2008 > 94.67% done, estimate finish Sat May 31 00:38:37 2008 > 94.69% done, estimate finish Sat May 31 00:38:38 2008 > 94.72% done, estimate finish Sat May 31 00:38:38 2008 > 94.74% done, estimate finish Sat May 31 00:38:38 2008 > 94.76% done, estimate finish Sat May 31 00:38:38 2008 > 94.78% done, estimate finish Sat May 31 00:38:37 2008 > 94.81% done, estimate finish Sat May 31 00:38:37 2008 > 94.83% done, estimate finish Sat May 31 00:38:38 2008 > 94.85% done, estimate finish Sat May 31 00:38:38 2008 > 94.87% done, estimate finish Sat May 31 00:38:38 2008 > 94.90% done, estimate finish Sat May 31 00:38:37 2008 > 94.92% done, estimate finish Sat May 31 00:38:37 2008 > 94.94% done, estimate finish Sat May 31 00:38:38 2008 > 94.97% done, estimate finish Sat May 31 00:38:38 2008 > 94.99% done, estimate finish Sat May 31 00:38:38 2008 > 95.01% done, estimate finish Sat May 31 00:38:37 2008 > 95.03% done, estimate finish Sat May 31 00:38:37 2008 > 95.06% done, estimate finish Sat May 31 00:38:37 2008 > 95.08% done, estimate finish Sat May 31 00:38:38 2008 > 95.10% done, estimate finish Sat May 31 00:38:38 2008 > 95.12% done, estimate finish Sat May 31 00:38:37 2008 > 95.15% done, estimate finish Sat May 31 00:38:37 2008 > 95.17% done, estimate finish Sat May 31 00:38:37 2008 > 95.19% done, estimate finish Sat May 31 00:38:38 2008 > 95.22% done, estimate finish Sat May 31 00:38:38 2008 > 95.24% done, estimate finish Sat May 31 00:38:37 2008 > 95.26% done, estimate finish Sat May 31 00:38:37 2008 > 95.28% done, estimate finish Sat May 31 00:38:37 2008 > 95.31% done, estimate finish Sat May 31 00:38:37 2008 > 95.33% done, estimate finish Sat May 31 00:38:38 2008 > 95.35% done, estimate finish Sat May 31 00:38:38 2008 > 95.37% done, estimate finish Sat May 31 00:38:37 2008 > 95.40% done, estimate finish Sat May 31 00:38:37 2008 > 95.42% done, estimate finish Sat May 31 00:38:37 2008 > 95.44% done, estimate finish Sat May 31 00:38:38 2008 > 95.47% done, estimate finish Sat May 31 00:38:38 2008 > 95.49% done, estimate finish Sat May 31 00:38:37 2008 > 95.51% done, estimate finish Sat May 31 00:38:37 2008 > 95.53% done, estimate finish Sat May 31 00:38:37 2008 > 95.56% done, estimate finish Sat May 31 00:38:37 2008 > 95.58% done, estimate finish Sat May 31 00:38:38 2008 > 95.60% done, estimate finish Sat May 31 00:38:37 2008 > 95.62% done, estimate finish Sat May 31 00:38:37 2008 > 95.65% done, estimate finish Sat May 31 00:38:37 2008 > 95.67% done, estimate finish Sat May 31 00:38:37 2008 > 95.69% done, estimate finish Sat May 31 00:38:38 2008 > 95.72% done, estimate finish Sat May 31 00:38:37 2008 > 95.74% done, estimate finish Sat May 31 00:38:37 2008 > 95.76% done, estimate finish Sat May 31 00:38:37 2008 > 95.78% done, estimate finish Sat May 31 00:38:37 2008 > 95.81% done, estimate finish Sat May 31 00:38:38 2008 > 95.83% done, estimate finish Sat May 31 00:38:37 2008 > 95.85% done, estimate finish Sat May 31 00:38:37 2008 > 95.87% done, estimate finish Sat May 31 00:38:37 2008 > 95.90% done, estimate finish Sat May 31 00:38:37 2008 > 95.92% done, estimate finish Sat May 31 00:38:37 2008 > 95.94% done, estimate finish Sat May 31 00:38:37 2008 > 95.97% done, estimate finish Sat May 31 00:38:37 2008 > 95.99% done, estimate finish Sat May 31 00:38:37 2008 > 96.01% done, estimate finish Sat May 31 00:38:37 2008 > 96.03% done, estimate finish Sat May 31 00:38:37 2008 > 96.06% done, estimate finish Sat May 31 00:38:37 2008 > 96.08% done, estimate finish Sat May 31 00:38:37 2008 > 96.10% done, estimate finish Sat May 31 00:38:37 2008 > 96.12% done, estimate finish Sat May 31 00:38:37 2008 > 96.15% done, estimate finish Sat May 31 00:38:37 2008 > 96.17% done, estimate finish Sat May 31 00:38:36 2008 > 96.19% done, estimate finish Sat May 31 00:38:37 2008 > 96.21% done, estimate finish Sat May 31 00:38:37 2008 > 96.24% done, estimate finish Sat May 31 00:38:37 2008 > 96.26% done, estimate finish Sat May 31 00:38:37 2008 > 96.28% done, estimate finish Sat May 31 00:38:36 2008 > 96.31% done, estimate finish Sat May 31 00:38:37 2008 > 96.33% done, estimate finish Sat May 31 00:38:37 2008 > 96.35% done, estimate finish Sat May 31 00:38:37 2008 > 96.37% done, estimate finish Sat May 31 00:38:37 2008 > 96.40% done, estimate finish Sat May 31 00:38:36 2008 > 96.42% done, estimate finish Sat May 31 00:38:36 2008 > 96.44% done, estimate finish Sat May 31 00:38:37 2008 > 96.46% done, estimate finish Sat May 31 00:38:37 2008 > 96.49% done, estimate finish Sat May 31 00:38:37 2008 > 96.51% done, estimate finish Sat May 31 00:38:37 2008 > 96.53% done, estimate finish Sat May 31 00:38:36 2008 > 96.56% done, estimate finish Sat May 31 00:38:37 2008 > 96.58% done, estimate finish Sat May 31 00:38:37 2008 > 96.60% done, estimate finish Sat May 31 00:38:37 2008 > 96.62% done, estimate finish Sat May 31 00:38:37 2008 > 96.65% done, estimate finish Sat May 31 00:38:36 2008 > 96.67% done, estimate finish Sat May 31 00:38:36 2008 > 96.69% done, estimate finish Sat May 31 00:38:37 2008 > 96.72% done, estimate finish Sat May 31 00:38:37 2008 > 96.74% done, estimate finish Sat May 31 00:38:37 2008 > 96.76% done, estimate finish Sat May 31 00:38:36 2008 > 96.78% done, estimate finish Sat May 31 00:38:36 2008 > 96.81% done, estimate finish Sat May 31 00:38:37 2008 > 96.83% done, estimate finish Sat May 31 00:38:37 2008 > 96.85% done, estimate finish Sat May 31 00:38:37 2008 > 96.87% done, estimate finish Sat May 31 00:38:36 2008 > 96.90% done, estimate finish Sat May 31 00:38:36 2008 > 96.92% done, estimate finish Sat May 31 00:38:36 2008 > 96.94% done, estimate finish Sat May 31 00:38:37 2008 > 96.96% done, estimate finish Sat May 31 00:38:37 2008 > 96.99% done, estimate finish Sat May 31 00:38:36 2008 > 97.01% done, estimate finish Sat May 31 00:38:36 2008 > 97.03% done, estimate finish Sat May 31 00:38:36 2008 > 97.06% done, estimate finish Sat May 31 00:38:37 2008 > 97.08% done, estimate finish Sat May 31 00:38:37 2008 > 97.10% done, estimate finish Sat May 31 00:38:36 2008 > 97.12% done, estimate finish Sat May 31 00:38:36 2008 > 97.15% done, estimate finish Sat May 31 00:38:36 2008 > 97.17% done, estimate finish Sat May 31 00:38:37 2008 > 97.19% done, estimate finish Sat May 31 00:38:37 2008 > 97.21% done, estimate finish Sat May 31 00:38:36 2008 > 97.24% done, estimate finish Sat May 31 00:38:36 2008 > 97.26% done, estimate finish Sat May 31 00:38:36 2008 > 97.28% done, estimate finish Sat May 31 00:38:36 2008 > 97.31% done, estimate finish Sat May 31 00:38:37 2008 > 97.33% done, estimate finish Sat May 31 00:38:36 2008 > 97.35% done, estimate finish Sat May 31 00:38:36 2008 > 97.37% done, estimate finish Sat May 31 00:38:36 2008 > 97.40% done, estimate finish Sat May 31 00:38:36 2008 > 97.42% done, estimate finish Sat May 31 00:38:37 2008 > 97.44% done, estimate finish Sat May 31 00:38:37 2008 > 97.46% done, estimate finish Sat May 31 00:38:36 2008 > 97.49% done, estimate finish Sat May 31 00:38:36 2008 > 97.51% done, estimate finish Sat May 31 00:38:36 2008 > 97.53% done, estimate finish Sat May 31 00:38:36 2008 > 97.56% done, estimate finish Sat May 31 00:38:37 2008 > 97.58% done, estimate finish Sat May 31 00:38:36 2008 > 97.60% done, estimate finish Sat May 31 00:38:36 2008 > 97.62% done, estimate finish Sat May 31 00:38:36 2008 > 97.65% done, estimate finish Sat May 31 00:38:36 2008 > 97.67% done, estimate finish Sat May 31 00:38:37 2008 > 97.69% done, estimate finish Sat May 31 00:38:36 2008 > 97.71% done, estimate finish Sat May 31 00:38:36 2008 > 97.74% done, estimate finish Sat May 31 00:38:36 2008 > 97.76% done, estimate finish Sat May 31 00:38:36 2008 > 97.78% done, estimate finish Sat May 31 00:38:36 2008 > 97.81% done, estimate finish Sat May 31 00:38:36 2008 > 97.83% done, estimate finish Sat May 31 00:38:36 2008 > 97.85% done, estimate finish Sat May 31 00:38:37 2008 > 97.87% done, estimate finish Sat May 31 00:38:37 2008 > 97.90% done, estimate finish Sat May 31 00:38:37 2008 > 97.92% done, estimate finish Sat May 31 00:38:37 2008 > 97.94% done, estimate finish Sat May 31 00:38:37 2008 > 97.96% done, estimate finish Sat May 31 00:38:37 2008 > 97.99% done, estimate finish Sat May 31 00:38:37 2008 > 98.01% done, estimate finish Sat May 31 00:38:37 2008 > 98.03% done, estimate finish Sat May 31 00:38:36 2008 > 98.06% done, estimate finish Sat May 31 00:38:37 2008 > 98.08% done, estimate finish Sat May 31 00:38:37 2008 > 98.10% done, estimate finish Sat May 31 00:38:37 2008 > 98.12% done, estimate finish Sat May 31 00:38:37 2008 > 98.15% done, estimate finish Sat May 31 00:38:36 2008 > 98.17% done, estimate finish Sat May 31 00:38:37 2008 > 98.19% done, estimate finish Sat May 31 00:38:37 2008 > 98.21% done, estimate finish Sat May 31 00:38:37 2008 > 98.24% done, estimate finish Sat May 31 00:38:37 2008 > 98.26% done, estimate finish Sat May 31 00:38:36 2008 > 98.28% done, estimate finish Sat May 31 00:38:36 2008 > 98.31% done, estimate finish Sat May 31 00:38:37 2008 > 98.33% done, estimate finish Sat May 31 00:38:37 2008 > 98.35% done, estimate finish Sat May 31 00:38:37 2008 > 98.37% done, estimate finish Sat May 31 00:38:36 2008 > 98.40% done, estimate finish Sat May 31 00:38:36 2008 > 98.42% done, estimate finish Sat May 31 00:38:37 2008 > 98.44% done, estimate finish Sat May 31 00:38:37 2008 > 98.46% done, estimate finish Sat May 31 00:38:37 2008 > 98.49% done, estimate finish Sat May 31 00:38:37 2008 > 98.51% done, estimate finish Sat May 31 00:38:36 2008 > 98.53% done, estimate finish Sat May 31 00:38:36 2008 > 98.55% done, estimate finish Sat May 31 00:38:37 2008 > 98.58% done, estimate finish Sat May 31 00:38:37 2008 > 98.60% done, estimate finish Sat May 31 00:38:37 2008 > 98.62% done, estimate finish Sat May 31 00:38:36 2008 > 98.65% done, estimate finish Sat May 31 00:38:36 2008 > 98.67% done, estimate finish Sat May 31 00:38:37 2008 > 98.69% done, estimate finish Sat May 31 00:38:37 2008 > 98.71% done, estimate finish Sat May 31 00:38:37 2008 > 98.74% done, estimate finish Sat May 31 00:38:36 2008 > 98.76% done, estimate finish Sat May 31 00:38:36 2008 > 98.78% done, estimate finish Sat May 31 00:38:36 2008 > 98.81% done, estimate finish Sat May 31 00:38:37 2008 > 98.83% done, estimate finish Sat May 31 00:38:37 2008 > 98.85% done, estimate finish Sat May 31 00:38:36 2008 > 98.87% done, estimate finish Sat May 31 00:38:36 2008 > 98.90% done, estimate finish Sat May 31 00:38:36 2008 > 98.92% done, estimate finish Sat May 31 00:38:37 2008 > 98.94% done, estimate finish Sat May 31 00:38:37 2008 > 98.96% done, estimate finish Sat May 31 00:38:36 2008 > 98.99% done, estimate finish Sat May 31 00:38:36 2008 > 99.01% done, estimate finish Sat May 31 00:38:36 2008 > 99.03% done, estimate finish Sat May 31 00:38:37 2008 > 99.05% done, estimate finish Sat May 31 00:38:37 2008 > 99.08% done, estimate finish Sat May 31 00:38:36 2008 > 99.10% done, estimate finish Sat May 31 00:38:36 2008 > 99.12% done, estimate finish Sat May 31 00:38:36 2008 > 99.15% done, estimate finish Sat May 31 00:38:37 2008 > 99.17% done, estimate finish Sat May 31 00:38:37 2008 > 99.19% done, estimate finish Sat May 31 00:38:36 2008 > 99.21% done, estimate finish Sat May 31 00:38:36 2008 > 99.24% done, estimate finish Sat May 31 00:38:36 2008 > 99.26% done, estimate finish Sat May 31 00:38:37 2008 > 99.28% done, estimate finish Sat May 31 00:38:37 2008 > 99.30% done, estimate finish Sat May 31 00:38:36 2008 > 99.33% done, estimate finish Sat May 31 00:38:36 2008 > 99.35% done, estimate finish Sat May 31 00:38:36 2008 > 99.37% done, estimate finish Sat May 31 00:38:36 2008 > 99.40% done, estimate finish Sat May 31 00:38:36 2008 > 99.42% done, estimate finish Sat May 31 00:38:37 2008 > 99.44% done, estimate finish Sat May 31 00:38:36 2008 > 99.46% done, estimate finish Sat May 31 00:38:36 2008 > 99.49% done, estimate finish Sat May 31 00:38:36 2008 > 99.51% done, estimate finish Sat May 31 00:38:36 2008 > 99.53% done, estimate finish Sat May 31 00:38:37 2008 > 99.55% done, estimate finish Sat May 31 00:38:36 2008 > 99.58% done, estimate finish Sat May 31 00:38:36 2008 > 99.60% done, estimate finish Sat May 31 00:38:36 2008 > 99.62% done, estimate finish Sat May 31 00:38:36 2008 > 99.65% done, estimate finish Sat May 31 00:38:36 2008 > 99.67% done, estimate finish Sat May 31 00:38:36 2008 > 99.69% done, estimate finish Sat May 31 00:38:36 2008 > 99.71% done, estimate finish Sat May 31 00:38:36 2008 > 99.74% done, estimate finish Sat May 31 00:38:36 2008 > 99.76% done, estimate finish Sat May 31 00:38:36 2008 > 99.78% done, estimate finish Sat May 31 00:38:36 2008 > 99.80% done, estimate finish Sat May 31 00:38:36 2008 > 99.83% done, estimate finish Sat May 31 00:38:36 2008 > 99.85% done, estimate finish Sat May 31 00:38:36 2008 > 99.87% done, estimate finish Sat May 31 00:38:36 2008 > 99.90% done, estimate finish Sat May 31 00:38:35 2008 > 99.92% done, estimate finish Sat May 31 00:38:36 2008 > 99.94% done, estimate finish Sat May 31 00:38:36 2008 > 99.96% done, estimate finish Sat May 31 00:38:36 2008 > 99.99% done, estimate finish Sat May 31 00:38:36 2008 >Total translation table size: 0 >Total rockridge attributes bytes: 14514 >Total directory bytes: 33174 >Path table size(bytes): 450 >Max brk space used 21000 >2200805 extents written (4298 MB) > >mkisofs calculate size command: >----------------------- >/usr/bin/mkisofs -gui -graft-points -print-size -quiet -volid CISCO1 -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/.private/di/kde-di/k3bUfaBbb.tmp -rational-rock -hide-list /tmp/.private/di/kde-di/k3bpDuesb.tmp -joliet -joliet-long -hide-joliet-list /tmp/.private/di/kde-di/k3bvfeuuc.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/.private/di/kde-di/k3bnXegmb.tmp > >mkisofs command: >----------------------- >/usr/bin/mkisofs -gui -graft-points -volid CISCO1 -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/.private/di/kde-di/k3b4KvVkc.tmp -rational-rock -hide-list /tmp/.private/di/kde-di/k3byfixac.tmp -joliet -joliet-long -hide-joliet-list /tmp/.private/di/kde-di/k3bAU2dja.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/.private/di/kde-di/k3b0u748b.tmp >
You cannot view the attachment while viewing its details because your browser does not support IFRAMEs.
View the attachment on a separate page
.
View Attachment As Raw
Actions:
View
Attachments on
bug 15853
: 2658 |
2659